量測軸 的英文怎麼說

中文拼音 [liángzhóu]
量測軸 英文
sensitive axis
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 軸Ⅰ名詞1. (圓柱形的零件) axle; shaft 2. (對稱部分的直線) axis 3. (圓柱形的纏繞器物) roller; spool Ⅱ量詞(用於纏在軸上的線以及裝裱帶軸子的字畫)
  • 量測 : measuration量測精度 accuracy in measurement
  1. In order to measure the field of view matching of digital binoculars, the depth of optic axis parallelism and field of view matching are measured respectively. the collimator and pre - set lens are used to measure the depth of parallelism of optic axis. field of view meter is used to measure the field of view of binoculars and camera

    為了檢驗數碼望遠鏡的視場匹配度,提出了採用平行光管和雙管前置鏡的組合平行度以及採用視場儀數碼望遠鏡的望遠鏡和數碼相機的視場大小的方式,並對數碼望遠鏡的視場匹配度與望遠鏡和數碼相機的視場大小關系進行了理論推導,導出了數碼望遠鏡的視場匹配度的實際計算公式。
  2. With a 576 * 768 pixes cod, we have got 10 " 5m accuracy in measurement of the deformation of soil specimen

    同時,用另外一臺ccd圖像傳感器實驗中的排水管讀數變化
  3. This method of diesel engine fault diagnosis is feasible theoretically. while the fault diagnosis system using this method is rare, just because the crankshaft instantaneous angular acceleration measurement is demanding, such as, good frequency response, high precision

    這種柴油機故障診斷的方法在理論上是可行的,但目前這種成型的系統不多,究其原因是的瞬時角加速度需要系統具有良好的頻率響應特性與高精度。
  4. It is mainly used to measure bearing temperature of various bearing equipment in the power station, which measured end is closely cling to surface of the measured bearing depend on shock - proof structure, hence improving accuracy in measuring temperature

    主要用於電站各種帶有承設備的承溫度,由於產品採用防震結構,使端緊貼被承表面,從而提高了溫度的準確度。
  5. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預預報( 3 )在現場地應力試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道線剖面的地應力分佈規律:地應力級在最大埋深附近達到最大值24mpa ,並預k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  6. Based on measurement of strains of both horizontal stirrups in the joint core and longitudinal reinforcement passing througth the joint, in different stages, transfer mechanism and factors affacting seismic behavior of the joint, were analysed. under different shear compression ration, effect of axial force ratio on seismic behawior of the joint was also evaluated, static shear and seismic shear of the joint based on capacity design were investigated. on this basis, new governing criteria and conditions of seismic behavior of the joint were put forward

    通過對節點區水平箍筋以及貫穿節點梁、柱縱筋在不同受力階段應變的精細,對節點的傳力機理以及影響抗震性能的因素進行了分析研究;對不同剪壓比條件下壓比對節點抗震性能的影響規律進行了分析研究;對不同受力階段梁筋的粘結退化規律以及節點區的剪切變形進行了分析研究;對節點的靜力抗剪與建立在能力設計思路上的抗震抗剪問題進行了深入研究,提出了建立在新思路基礎上的節點抗震性能控制準則和控制條件。
  7. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大跨度地下空間dk7 + 692斷面施工支護體應力監的工程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開挖方法、支護體結構的應力方法及試手段;分析了支護體初期支護工字鋼拱應力、錨桿力、噴射混凝土內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等試結果和變化規律;確定了工字鋼拱應力急劇增大而可能引起支護體系失穩的原因。
  8. After an introduction to the research on the software for the design of the variant steel arched girder construction, the creation of the structural model, the structure of the supporting seat, the design of the variant arched girder, and the measures taken to ensure the stability of the plane surface of the arched girder, the thesis goes to study the methods for the hoisting and the angle setting of the long - span arched girders, as well as the bolting of the axle pin in the hinge support

    論文首先對變異鋼拱架結構設計可採用的軟體、結構模型的建立、支座構造形式、變異拱梁的設計,以及保證拱梁平面外穩定所採取的措施等進行了研究,然後研究了大跨度變異鋼拱架弧形梁吊裝、角度的調整、鉸支座穿銷等的施工方法,最後對施工完成後的位移進行了實際
  9. And we analyzed the effect of the big gun erect axis incline trunnion axis is out of the vertical of the erect axis and the big gun axis is out of the vertical of the erect axis to measuring accuracy

    對矢公式進行了推導,並利用它計算出了火炮豎傾斜、炮耳與豎不垂直、炮膛線和炮耳不垂直三種誤差對精度的影響。
  10. Bearings roller bearings and other components. bearing ring precision rolling production line ; a high - precision, super efficient grinding automatic production line ; bearing assembly line ; signal processing equipment ; blank processing equipment ; crowning roller grinder ; end - grinder ; coordinate precision grinder ;, cylindrical grinder ; surface grinder ; spherical roller processing equipment ; raceway grinder ; heat treatment ; needle processing equipment ; polishing processing equipment ; roller - seiki ; rolling auto - sorting machine parts bearing hardness sorting machine bearing cleaning equipment ; contact angle measuring instrument ; contour meter ; bearing life experimental device ; bearing packaging equipment ; roundness instrument ; dynamic vibration noise analyzer ; noise vibration test equipment ; printing machine measuring instrument ; roughness tester ; scanning electron microscope ; finish detector ; inverter ; spindle, wheel, whetstone and other grinding materials

    承套圈精密輾擴生產線高精高效磨超自動生產線承自動裝配線球加工設備毛坯加工設備凸度滾子磨床雙端面磨床高精度坐標磨床內外圓磨床平面磨床球面滾子加工設備溝道磨床熱處理生產滾針加工設備光飾加工設備滾道超精機滾動體自動分選機承零件硬度選別機承清洗設備角接觸儀輪廓承壽命實驗裝置承包裝設備圓度儀振動噪音動態分析儀振動噪音試裝置印字機加工儀粗糙度試儀掃描電子顯微鏡光潔度檢儀變頻器電主砂輪油石和其他研磨材料
  11. The theory and experiment of measuring diffusion coefficients in terms of mr signal attenuation has been established for decades, but recent advance of diffusion tractography has enabled us, for the first time, to visualize and analyze the axonal fiber tracts in the living brain non - invasively

    其實,利用磁振訊號衰減到擴散系數之理論與實驗已確立了幾十年,但近年來擴散神經纖維束造影的發展,第一次使我們能夠在活體非侵襲性的觀察和分析神經突纖維束。
  12. Test data analysis of automobile axle weighing instrument

    汽車載質定儀試精度分析
  13. Dosimetry of electron beam central axis percent depth dose

    高能電子線射野中心百分深度劑
  14. Length, diameter, density, fresh weight, dry weight, water content, osmotic potential and element concentrations ( ca, mg, na, k, cl ) were determined for each. seedling of b. gymnorrhiza and a. corniculatum were cultured for 60 days on various salinity of seawater ( 0, 5, 10, 15, 20, 30, 40, 50 ) in green house. samples were taken at 3, 7, 11, 15, 22, 30, 45 and 60 days after planting, separated into root, hypocotyl, stem and leaf

    本文研究了福建九龍江口木欖和桐花樹胎生繁殖體從果實形成到發育成熟過程中形態、生物、含水、胚密度、滲透勢、五種主要礦質元素( ca 、 mg 、 na 、 k 、 cl )等的變化和溫室內人工鹽度梯度栽培下木欖和桐花樹成熟繁殖體長成幼苗( 0 60d )過程中形態、生物、含水、滲透勢、光合蒸騰特性、五種主要礦質元素( ca 、 mg 、 na 、 k 、 cl )等的變化;並且在野外自然條件下,跟蹤調查不同灘塗位置下秋茄成熟繁殖體定居成活、自然死亡狀況以及定幼苗生長過程中( 1年)形態、生物、含水、光合蒸騰特性等的變化。
  15. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  16. Based on the review of recent advances in surveying and controlling techniques of river models, described in this paper is a new controlling technique, which makes use of a two - way axial - flow pump and a immersion pump to control the up - boundary condition of discharge and the down - boundary condition of water level respectively, with the tidal model of the huangpu river estuary as an example

    在對河工模型與控制技術進行回顧的基礎上,以黃浦江河口潮汐河工物理模型為例,介紹了潮流河段上邊界採用流泵進行雙向流控制、下邊界採用潛水泵進行水位控制的新技術。
  17. Abstract : with the use of the theory of blazed phase gratings, the color separation phase grating used for icf drivers is designed, which can off - axis separate the fundamental, 2nd and 3rd harmonic waves. theoretically, its diffraction efficiency for 0 " th order at the 3rd harmonic wave is 100 %. experimentally, a color separation grating is made. both its separation angles ( at the 1st and 2nd harmonic waves ) and its diffraction efficiencies for 0 " th order are measured, and some significant results are presented

    文摘:採用相位閃耀光柵原理設計出用於icf驅動器中能離分離基頻、二倍頻、三倍頻激光的色分離相位光柵,理論上三倍頻零級衍射效率達到100 ,同時,對該相位光柵進行了實際製作和實驗出了基頻光和二倍頻光的分離角以及光柵的零級衍射效率,得到了一些有意義的結果。
  18. The machine can set with several levels to measure and select the longitudinal diameter of piston automatically

    活塞選別機可自動將活塞長徑予以及分類,提供引擎裝配時最佳的選擇,確保引擎的品質。
  19. And then according to every process of tunnel construction, simulated analysis is carried out. by combining with monitoring and instrumentation of surround rock periphery displacement and the face of land to sink, surround rock with spray laminating force, surround rock body internal displacement, anchor rod axle force and protect and lining build strength, we have carried out scientific analysis and synthesis judgement of the stability of tunnel wall rock and the security of timbering structure

    然後,根據隧道施工的各個工序進行模擬分析,並結合對圍巖周邊位移、地表下沉、圍巖與噴層壓力、圍巖體內部位移、錨桿力、支護及襯砌強度進行的與監控,對結果作出了科學分析,從而對隧道圍巖的穩定性和支護結構的安全性做出了綜合評判。
  20. At the same time, the thesis analyses the time - state curve of the axial force and bending moment of the steel framework and the axial force of the anchor bolt. the analysis results are compared with the results of the fem calculation

    同時,論文對現場監控獲得的鋼拱架力彎矩時態曲線以及錨桿力時態曲線進行了分析,並與理論計算進行了比較,驗證。
分享友人