鉆一口油井 的英文怎麼說

中文拼音 [zhēnkǒuyóujǐng]
鉆一口油井 英文
drill a well
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • : Ⅰ名詞1 (脂肪; 油脂) oil; fat; grease 2 (姓氏) a surname Ⅱ動詞1 (用桐油、油漆等塗抹) apply t...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • 油井 : oil well
  1. When was the first offshore oil well drilled ?

    濱海是什麼時候打的
  2. In the early stage of its exploration and exploitation ( 1905 - 1949 ), five major events occurred in the order of time, namely : ( 1 ) the foundation of yanchang oil plant and the first oil well in mainland china ; ( 2 ) the voice of the oil field run by the local people ; ( 3 ) the drilling and investigation of petroleum geology in northern shaanxi by mobil corporation ; ( 4 ) the early investigation of petroleum geology in northern shaanxi ; and ( 5 ) the strong support given by the oil field to the war of resistance against japan

    在延長礦早期( 1905 - 1949年)勘探與開采中,有5件重大事件,即:從延長石官廠的成立與中國近代陸上第、民辦礦的呼聲、美孚對陜北的探與石地質調查、中國人進行的早期陜北石地質調查和有力地支援抗日戰爭的功臣礦。
  3. According to the two companies the studies carried out as part of a joint prospecting project which began three years ago led to the decision to drill a new well in the exploration area which covers a total 29 000 square meters

    聯合石勘探計劃在三年前就開始了,勘探地區面積達29000平方米。兩公司稱,作為該計劃的部分,他們將在勘探地區
  4. At last, we provide six exploring wells. among the drilled three wells, the two gain the industrial oil & gas and another is not good. as follows are the main studies

    最終提供設計位6,其中有3已經完,兩在奧陶系潛山見到工業氣流,氣顯示。
  5. According to the problems occurred during the first stage of five well drillings in qianmiqiao qianshan structure, technical measures, such as optimal well configuration, bottom hole assembly, bit type and drilling fluid were taken during the second stage of another five deep drillings and better results were achieved. it is helpful to explore and develop in qianmiqiao qianshan structure in dagang oilfield

    分析了千米橋潛山構造第階段5施工過程中遇到的技術難題,從優化身結構、優選具組合、頭優選、優選液體系及組織管理等方面給出了相應的技術措施和對策,並在第二階段5的施工中進行了應用,且取得了明顯的效果,為大港田千米橋潛山構造的勘探開發奠定了堅實的基礎。
  6. Abstract : according to the problems occurred during the first stage of five well drillings in qianmiqiao qianshan structure, technical measures, such as optimal well configuration, bottom hole assembly, bit type and drilling fluid were taken during the second stage of another five deep drillings and better results were achieved. it is helpful to explore and develop in qianmiqiao qianshan structure in dagang oilfield

    文摘:分析了千米橋潛山構造第階段5施工過程中遇到的技術難題,從優化身結構、優選具組合、頭優選、優選液體系及組織管理等方面給出了相應的技術措施和對策,並在第二階段5的施工中進行了應用,且取得了明顯的效果,為大港田千米橋潛山構造的勘探開發奠定了堅實的基礎。
分享友人