鉆具測試 的英文怎麼說

中文拼音 [zhēnshì]
鉆具測試 英文
dst drill stem test
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 名詞(古代占卜用的器具) astrolabe
  • 測試 : test; testing; checkout; measurement
  1. The drill and petroleum extraction tools test - well is made up of the multifunction test - machine system ( hydraulic system ), the calefaction system the circulation system, the testing system and the assistant system

    采工驗井共由多功能驗機系統(液壓系統) 、加熱系統、循環系統、系統和輔助系統組成。
  2. Meixing electronics factory is major in the vacuum tube stereo power amplifier, which is located in the nanhai city , owned a workhouse over 1300 square meter, with five plant, they are box, seal and transformer circling 、 debugging & check, we also have the machine process, such as milling machine 、 punch 、 drill press 、 electric welding 、 matrix 、 incision machine, and radio tube test machine. we have realize the product line manufacture, the monthly whole output is over 200 sets

    美星電子是一個專業製造真空管身歷聲功率放大器的加工廠,位於廣東南海市黃岐工業區,擁有廠房一千三百平方米,工廠分機箱加工、焊接組裝、變壓器繞制、煲機老化、調五個車間,機械加工設備擁有銑床、沖床、創床、床、電焊、模製作、切割等二十多臺,電子管及整機檢調儀器十餘臺,該廠實現了配套設備、流水作業,每月可生產膽機二百臺以上,可謂中國專業生產膽機最大規模的工廠。
  3. The main production equipment is as follows : lathe, grinding machine, puncher, cold mound machine, drilling machine, tapping machine, roll silk machine, rub silk machine, polishing machine, quench equipment, etc. 150 with the hands, measure advanced and perfect testing equipment, have fast better spare part development ability

    主要生產設備有:車床、磨床、沖床、冷墩機、床、攻絲機、滾絲機、搓絲機、拋光機、淬火設備等150臺套,檢驗設備先進完善,有快速較強的零部件開發能力。
  4. Through the research on the reducer reliability and optimization design, the design quality of the drilling machine are improved greatly. it is proved that the type zk - 150 drilling machine capability is advanced and operation is reliable by examine and industrial test in coal mine. another advanced equipment provided to users has wide application foreground

    通過可靠性優化設計,使機的設計質量得到很大提高,所研製的zk - 150型機經性能檢和工業性驗證明:技術性能先進,機械運轉可靠,為煤礦提供了又一先進設備,有廣闊的市場前景。
  5. Abstract : artifical intelligence methods are implemented to simulate thebehaviors of axially and laterally loaded piles using the field observation tests data obtain ed f rom the drilled shafts and driven piles. the optimal neural network model is deve loped using only simple input data of spt - n values and piles ' geometrical featu r es etc. the analysis for r. c piles of some projects is performed adopting the bp n n and grnn models respectively, and the obtained predicated results are compared w ith the data from conventional design method. it demonstrated the obvious advanta ges of neural networks in the design of pile foundations over the traditional me thods. this paper has an important practical significance and a referential worth iness in the design of pile foundations

    文摘:根據孔樁和打擊樁的原型驗觀的數據,運用人工智慧方法對橫向承載樁和軸向承載樁的工作特性進行模擬,並利用標準貫入驗( spt - n )值和樁的幾何特性等簡單的輸入數據,開發出相應的優化神經網路模型;然後,運用反向傳播神經網路模型和廣義回歸神經網路模型分別對某工程的鋼筋混凝土樁進行分析,並將求得的預結果與常規設計法的結果進行比較,結果表明神經網路方法比傳統方法有明顯的優越性,在實際工程設計中有重要的參考價值和現實意義。
  6. Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf

    因此,查明采空區的體位置,在此基礎上對場地進行工程適宜性評價,對整個工程建設有重要的指導意義。本論文在總結前人對地下采空區勘察及有關穩定性研究方法的基礎上,以山西大寧煤礦鐵路專用線五龍溝1 ~ # 、 2 ~ #隧道采空區為研究實例,在詳細的地表工程地質調查和繪的基礎上,結合通過對采空區有關人員的探訪,首先對主要開采礦層的空間展布進行地質判斷;然後採用國內外較為先進的工程勘探與檢儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側一定范圍內(共40米)進行了面波,對采空區的可能出露部位進行了較為準確的判斷;最後通過探加以驗證,表明面波儀的結果是較為合理可信的。
  7. Contrast to such original place test method as static load method and drilling method, the method that applying transient rayleigh surface wave to inspect the compound foundation own many virtues as low cost, high efficiency, non - destruction, and it also can save much labour and effort. furthermore, it can implement the large - wide and comprehensive inspection and evaluation of compound foundation bearing capacity

    與靜載驗、孔法等原位方法相比,瞬態瑞雷波檢復合地基技術有成本顯著降低、效率高、無破損等特點,可節省大量的人力物力,從而可以實現復合地基承載力大范圍、全面的檢和評價,打破以往只能局部抽檢的局面。
  8. Pick up drill stem test tool

    提起
  9. The drill and petroleum extraction tools test - well is built in room, that not only can ensure that test environment meeting the test request but also is very convenience for equipment maintenance

    整個采工驗井建在專用實驗室內,既可保證驗環境符合要求,又可極大的方便設備維護。
  10. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內驗及原位指標進行理論計算與現場實值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深度修正系數,使理論計算值與現場實有良好的一致性,進而通過變形協調理論對荷載?沉降曲線進行數值計算,並用不同施工工藝的實例說明了理論計算荷載?沉降曲線與實荷載?沉降曲線的擬合效果,從而達到可在不做靜載荷驗或少做靜載荷驗的情況下通過剪切波速和靜力觸探驗指標以及施工工藝修正系數等預黃土地基中孔灌注樁承載性狀,這對于工程初步設計中減少設計的盲目性有十分重要的現實意義。
  11. In chapter six, based on the preceding chapters " research, the practicality of the full scale dr i 11 ing simulating test device has been tested by the debugging and the performance test. under simulating drilling conditions, the rock mechanical properties and the bits " dynamical tests are analyzed and set forth specifically. at the same time the effect of bottom pressure difference on the oil field exploration and development has been discussed

    第六章在前述分析研究的基礎上,通過對模擬裝置的系統調及性能,驗證了全尺寸井模擬裝置的實用性,在井模擬條件下對巖石的機械性質、牙輪頭動態給予了體的分析闡述,同時還分析探討了井底壓差對油田勘探開發的影illb ,並且為宋深101井的實際施工作業提供了非常有價值的指導參數。
分享友人