鉆孔工地 的英文怎麼說

中文拼音 [zhēnkǒnggōngde]
鉆孔工地 英文
drilling site
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    彩色電視壁成像系統、直接橫波測井研究偶極子井下聲系和聲波儀、多點滲壓儀及壓模系統、巖質高邊坡快速攝像微機質素描成圖、層析成像技術、近壩庫段安全監測技術、邊坡監測數據處理預報軟體研究、高精度大測量監測自動化系統等項目,研究成果內容新、先進、實用,已在程中應用,效益顯著。
  2. Landslide is a geological hazard with serious losses. it is very important to research the controling methods. slide - resistant pile, which has many advantages such as high adaptability, little interference to landslide and geological environment, short construction time, high silde resistance, is a main method to control landslide. pneumatic down - the - hole hammer is a drilling method with many advantages. its features, such as wide application range, high hole quality, no circulating medium, low operation regulations, and drilling big diameter rock hole, fit to construct slide - resistant pile. according to the requirement of silde - resistant pile construction, this paper analyses feasibility that pneumatic dth hammer drilling applies to construct slide - resistant pile on the basis of introducing the features of pneumatic dth hammer. then an applied example is given

    滑坡是一種危害極大的質災害,它的整治方法研究具有重要意義.抗滑樁是一種適應性強、對滑坡穩定性和質環境干擾小、期短、抗滑能力強的滑坡整治方法.風動潛進是一種具有許多優點的進方法,它的許多特點,如成質量高、應用范圍廣、無液體循環介質、進規程參數小、可實現大直徑基巖等都適合於抗滑樁施.文章在介紹風動潛進特點的基礎上,根據抗滑樁施要求,分析了風動潛錘用於抗滑樁施的可行性,並舉出了其應用實例
  3. Construction technology of drilled pile in karst area

    巖溶區大直徑樁施技術
  4. Qingjiang bridge karst geology drill hole pile construction

    清江大橋巖溶樁施
  5. Construction of karst pile foundation for lushui bridge

    巖溶區橋梁基礎樁施技術
  6. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施藝的檢測和樁身質量及承載力的檢驗,確定了沖擊在溶洞質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  7. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋壓灌混凝土成樁技術自研製以來,已在多項復合程中進行了應用,較好解決了軟弱層成困難的問題,適應質條件范圍廣,成樁速度較快,期短、效高;與復合基成樁時的泥漿護壁成藝、振沖樁藝或振動沉管藝施比較,具有無振動、無污染、無噪音的優點;另外,壓入桿內的混凝土為泵送免振混凝土,因此樁體質量易於保證;與泥漿護壁和干作業成藝相比,螺旋壓灌混凝土成樁的側阻和端阻都有相應的提高,樁的承載性能較好,復合基的變形較小。
  8. In the paper, the repack method of the machine tool, the structure characters and the principle of the vibrative gun drill are introduced

    本文通過生產實踐較詳細介紹了用振動槍時的機床改裝、槍結構特點及振動削的機理。
  9. In accordance with the testing results and the analysis concerned, it is considered that the seismic wave method, borehole acoustic method and indoor rock mechanics test are feasible to evaluate the engineering quality of the foundation rock for the toe slab of the dam comprehensively, and the results can lay a reliable foundation for the accepting the foundation rock for the toe slab of the dam

    根據檢測結果與分析,認為採用震波法、聲波法以及室內巖石力學試驗綜合評價水電站大壩趾板建基巖體程質量是可行的,其成果可為大壩趾板建基巖體驗收提供依據。
  10. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用震波法、聲波法以及室內巖石力學試驗法,對水布埡水電站面板壩趾板建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對程巖體進行了質量分級和質量評價。
  11. The major diameter filling pile drilling machine of qj250 - 1 type applies to major diameter bridge pier hole of various geologic conditions such as ravelly ground, clay loam layer, sandy gravel, breaking layer and lithosphere as well as other various major diameter pore forming construction

    1型大直徑灌注樁機適用於鬆散層、粘泥層、砂礫層、破碎層和巖石層等多種質條件的大直徑橋樁,以及其它各種大直徑成
  12. The research reveals that in the complex foundation, the application of screw drill press concrete stake technology is feasible. it has notable effects in reducing the sedimentation of the complex foundation, ensuring the stake quality of the basic stake, improving the weight bearing capacity, saving costs, and cutting time limit

    研究表明,螺旋壓灌混凝土成樁技術在復合基中的應用是可行的,它在減小復合基的沉降量,保證基樁的成樁質量,提高承載力,節約程造價,縮短期等方面均有顯著作用。
  13. Abstract : this paper describes the working principle of drillhole radar and recommends two working patterns : single - drillhole reflection and crosshole tomographic imaging. the technique was used to make lithologic evaluation of deep strata and detect geological anomalous bodies with obvious effects obtained

    文摘:闡述了雷達的作原理,介紹了單反射和跨層析成像2種作方式,並將其用於深部巖層巖性評價和質異常體探測,效果顯著。
  14. Planning and arrangement of the site for the bored pile construction

    灌注樁程施規劃與布置
  15. The distance of the single - row curtain grout hole is between 1. 4 to 1. 8 meter, and 2. 0 meter is suitable for the double - row curtain ; the grouting pressure generally is 1. 0 to 1. 5 mpa at the first three grout compartment, then grouting pressure of under the fourth control in 4 to 5 mpa ; for mast grout compartments, a water - cement ratio of 2 or 1 may used in the first grouting

    密度也由原來的0 . slm / mz降至o . 64n擴mz ,節約程投資447 . 35萬元。 6 、單排帷幕的距在1 . 4一1 . 8m之間,雙排帷幕的距以zm為宜;灌漿壓力在表以下前三段一般為1一1 . smpa ,第四段以下按4一smpa控制;對大部分段而言,開灌水灰比可定為2或1 。
  16. Abstract : the paper is based on the working particle for sever al bridges in the construction of w8 section of sheng - yan railway project. it sy stematicaly instructs the construction method of bore - hole filling pile in the rock area with under - earth mined - out layer

    文摘:筆者以神延鐵路w8標段多座橋梁程實踐為基礎,系統介紹了有下采空層的巖石灌注樁施的方法
  17. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大橋程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性採用雙壁鋼沉井圍堰樁基礎,鋼圍堰在橋梁基礎施中的應用越來越多。
  18. It is stated clearly by researching, the cast - in - place pile must be constructed according to strict technological process on condition that pebble geological structure, and more important that the drilling technology and the reasonable property index of mud are chose correctly on the basis of the condition of pebble geological structure

    研究表明,江漢平原區卵石基條件下,灌注樁必須要按嚴格的藝流程施,最重要的是根據卵石基的質情況,正確選擇藝和合理的泥漿性能指標。
  19. This drill adopts the deep drilling technique of positive and negative circulation, the efficiency of deep drilling is high, and applies to various stratum, is the first selected equipment for the basic construction of river bridge and dock, and also applies to drilling project of high building and heavy caliber shallow well

    該機採用正反循環藝,進效率高,適用於各種層,是江河橋梁、碼頭基礎施的首選設備,也適用於高層建築及大口徑淺水井等程。
  20. The research of patch antennas based on photonic - bandgap ( pbg ) structures is a relatively new area. the goal is to improve the performance of the patch antennas by using the special features of pbg structures. though some good research results have been obtained by scientists in the world, there still exit some problems to be solved for improving the performaces and reducing the size, weight and cost

    雖然國內外已經在基底型、面腐蝕型、高阻抗表面型、 uc - pbg型、覆層型和軟表面型電磁(光子)晶體貼片天線等方面開展了研究,但是在這些研究中還遺留著多方面的問題有待解決,以顯著改善天線的性能指標,減少天線的體積,重量,降低天線的加費用等。
分享友人