鉆速曲線 的英文怎麼說

中文拼音 [zhēnxiàn]
鉆速曲線 英文
drillingrate figure
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ形容詞(迅速; 快) fast; rapid; quick; speedy Ⅱ名詞1 (速度) speed; velocity 2 (姓氏) a surna...
  • : 曲名詞1 (一種韻文形式) qu a type of verse for singing which emerged in the southern song and ji...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 曲線 : [數學] curve; bight; bought; profile; net曲線板 french curve; irregular curve; curve board; splin...
  1. Benthic foraminifer fauna, ams14c dating and acoustic sub - bottom profile was analyzed in the core ey02 - 2 and ey02 - 1 drilled from the muddy deposit in the middle southern yellow sea and the mid - shelf of north east china sea. considering the results of core qc2 ? dz4 and the standard oxygen isotope curves, we discussed the late - quaterenary paleo - environment evolution, benthic foraminifer fauna, paleo - climate, the climate events and water mass in postglacial period, average sedimentation rates, paleo - water depth, origin of sediments, average sea level rise rate in the shelf of south yellow sea and east china sea. at last we discussed the condition of sea level rise in the east china, green house effect and the protection of coastal zone

    本文根據南黃海中部泥質區和東海中陸架的兩個孔巖芯的古生物、 ams ~ ( 14 ) c測年、淺地層剖面等,參考qc _ 2 、 dz _ 4成果及標準氧同位素探討了黃東海陸架晚第四紀古環境演化、底棲動物群特徵、古氣候、冰後期以來氣候事件、古水團、沉積率、古水深、沉積物源、海平面平均上升率,討論目前中國東部海平面上升的狀況、溫室效應及海岸帶保護。
  2. Drilling - time log

    鉆速曲線
  3. Based on hundreds of actual site profiles collected in china, 1281 typical profiles were selected or constructed, which were used for studying three kinds of soil layer profiles containing soft layers that locate at the bottom, in the mid or on the top of them. 480 acceleration histories were formed artificially, which can express the different characters of ground motions and be used as the ground motion inputs in the study

    在整理分析全國各地諸多實際工程場地孔資料的基礎上,從中選取和構造了1281個研究三種不同土層結構的場地計算模型;合成了480條能夠反應不同地震動特徵的加度時程,並將其作為土層地震反應分析的地震動輸入。
  4. By means of the software of pro / e we studied the movement of the bit and obtained some data reports about different parameter bit. in the environment of visual basic the trace program can compute the well - bottom outline. it also can draw the trace and the velocity curve that the teeth scrape the well bottom

    分析方法是在pro / e中對試驗頭進行運動模擬,得到不同結構參數和傳動比的頭運動的數據文件,然後進入用visualbasic高級語言編制的異形牙輪單牙輪頭分析軟體中,計算出頭的井底輪廓,並繪制頭井底軌跡和牙齒刮切井底的
  5. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內試驗及原位測試指標進行理論計算與現場實測值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深度修正系數,使理論計算值與現場實測值具有良好的一致性,進而通過變形協調理論對荷載?沉降進行數值計算,並用不同施工工藝的實例說明了理論計算荷載?沉降與實測荷載?沉降的擬合效果,從而達到可在不做靜載荷試驗或少做靜載荷試驗的情況下通過剪切波和靜力觸探試驗指標以及施工工藝修正系數等預測黃土地基中孔灌注樁承載性狀,這對于工程初步設計中減少設計的盲目性具有十分重要的現實意義。
分享友人