鉛工程 的英文怎麼說
中文拼音 [qiāngōngchéng]
鉛工程
英文
lead works-
The factors mainly include soil acidifying, higher organic matter content in the soil, lead of precipitum in the air and the processing of the tea leaves in the factory
這些來源主要包括:茶園土壤酸化和較高的有機質含量,大氣沉降物中的鉛和茶葉的加工過程。Study on the flotation technology for treating a refractory fluorite ore
蘭坪鉛鋅礦選礦工藝流程的設計You can use your database model as a reference during implementation of the database. for this purpose, database developers use tools that range in technical complexity from pencils and scratch paper to word processing and spreadsheet programs, and even to software programs created specifically for the job of data modeling for database designs
鑒於此目的,數據庫開發人員將使用各種工具進行數據庫設計,這些工具在技術復雜性方面差別很大,既可以是簡單的鉛筆和草稿紙,也可以是字處理和電子表格程序,甚至可以是專門為數據建模工作創建的軟體程序。Pure zn refined from spelter in pb and zn production is a very complex technical process, which needs series work. there is every probability of appearing fault because of the large quantity of facility in production, so that it causes serious effect to the production and security
鉛鋅生產中將粗鋅精煉成為精鋅是一個需要連續作業的復雜工藝過程,所涉及的生產設備較多,發生故障的可能性增大,以至對生產或安全造成嚴重影響。Standard practice for use of qualitative chemical spot test kits for detection of lead in dry paint films
乾漆膜中鉛含量檢測用定性化學抽查工具標準規程The contractor for the new school building gave out subcontracts to a plumber, a steam fitter, etc
承造學校新建築的人又將工程轉包給鉛管工人,汽管裝配工人等等。The high - lead bronze maintaining parts for the american imported facilities ( simons breaker and 23 stere excavator ) in the three gorges project all reached the life time of american high - lead bronze parts after being installed and run
為三峽工程的美國進口設備(西蒙斯破碎機、 23立方米電鏟等)的高鉛青銅維修件,生產后已裝機運轉,均達到美國高鉛青銅件的使用壽命。Taking the example of china tin gruop co., ltd hechi metallurgy and chemical industry, the article details the production processes, technology conditions and production practice of removing arsenic from the second caustic sludge and lead from the second lead sludge
摘要文章以華錫集團河池冶金化工廠精煉生產工藝為例,詳細介紹了採用二次堿渣進行脫砷,二次鉛渣進行脫鉛的生產流程、工藝技術條件及生產實踐。Dtu 40 - 46. building works. private contracts. fully supported lead roofing work. part 2 : schedule for special clauses
Dtu 40 - 46 .建築工程.專門合同.完全支撐鉛層頂結構.第2部分:特別條款的目錄( 3 ) the result of imitating shows that the distribution of temperature look like triangle at present, the cause of temperature asymmetry is the mistake ratio of gas and air in the same vertical direction, the direction to improve on is by adjustment to distribute reasonably gas in different height and uniformly gas in same level
( 3 )模擬結果展現了目前鉛塔燃燒室溫度呈三角形分佈,並揭示了造成這種不均勻分佈的根本原因是空氣、煤氣在同一垂直方向的不匹配。並指出了改進方向是通過調整,使煤氣2002年工程碩士畢業論文摘要在高度方向的名迢群引配、以及在水平方向均勻分佈。From the engineering practice in instability and failure of protective facing of overflow rock fill cofferdam, this article discussed the causes of formation of instability and failure of wire - caged protective facing and analyzed the primary factors and critical conditions of instability and failure based on model experiments
摘要從過水堆石圍堰護面失穩破壞的工程實踐出發,探討了鉛絲籠護面失穩破壞的成因,在模型試驗的基礎上,分析了影響鉛絲籠護面穩定的主要因素及失穩破壞的臨界水力條件。Made without using lead oxide as tradional way, avoiding hurtful lead element, but increasing the content of zinc, a trace element helpful to human body
製作過程中不用氧化鉛,使用先進行無鉛工藝加工而成,免除了有害鉛無素,增加了對人體有益的微量鋅無素色澤鮮艷、進口醇香、宴請佳肴、饋贈禮品。Preliminary neutronics design of the dual - cooled lithium lead blanket for fds - ii, jingjing li, shanliang zheng, et al., fusion engineering and design, 75 ? 79 ( 2005 ) 715 ? 719
聚變發電反應堆雙冷鋰鉛包層熱工水力學設計與分析,汪衛華,劉松林,王紅艷等,核科學與工程, 2005 , 25 ( 2 ) 163 - 168 。The development of dc control power system described in this paper is oriented to the baoji - chengdu electric railway - engineering project. a dc control power system, which is based on plc, hf switch rectifier and valve control seal battery is described in the paper
本文結合寶成復線電氣化工程,針對牽引變電所直流控制電源系統設計,闡述了一個基於plc控制器、高頻開關整流裝置和閥控式密封鉛酸蓄電池的直流屏的設計和產品研製。In 1997, the hong kong observatory and the geotechnical engineering office worked together to establish additional seismograph stations at cape d aguilar, lead mine pass, luk keng, siu lam and keung shan, making up a total of eight seismograph stations in the network
一九九七年,天文臺與土力工程處合作,增添了鶴咀、鉛礦凹、鹿頸、小欖、和姜山地震站,把地震站網擴大至八個站。站網採用了新地震儀,地震儀對周期0Standard guide for sample selection of debris waste from a building renovation or lead abatement project for toxicity characteristic leaching procedure testing for leachable lead
可浸出鉛的毒性浸出過程試驗用的來自於建築改建或除鉛工程中碎料廢物樣品選擇的標準指南This paper takes the extended project item of the zinc smelting system 100, 000 tons per year in henan gold & lead as background to develop work research., through analysising the automatic current situation of zinc smelting and contrasting the characteristics of plc, dcs, fcs control system, we select dcs control system for use and control the process tech
本文以河南豫光金鉛集團10萬噸/年電解鋅擴建工程為背景,通過對鋅冶煉自動化現狀的分析以及plc 、 dcs 、 fcs控制系統特點的對比,在鋅焙燒工藝中選用dcs控制系統進行過程式控制制。Lead used in apparatus engineering ; lead of semi - finished product designs
儀器工程用鉛.第2部分:鉛半成品的設計For the first condition, the damping effect is not clear as all
本文建議,在可能產生長周期成分豐富地震場地上的工程中,應該慎用鉛合金減震器。The realization of the lrb standard will accelerate the speed of being put into the construction of lrb
標準化的實現可加速鉛銷橡膠減震支座投入工程實踐的速度。分享友人