銅井 的英文怎麼說

中文拼音 [tóngjǐng]
銅井 英文
tongjing
  • : 名詞(金屬元素) copper (cu)
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. 2. with those two down, the bride has two remaining foes on her death list to pursue - budd michael madsen and elle driver daryl hannah - before moving on to her ultimate goal - to kill bill

    上回講到,新娘子奧瑪花曼飾連環追殺當年在其婚禮屠殺其親人及女兒的各路仇人,並已將該死名單上的石阿蓮及頭蛇殲滅。
  2. This paper unite surveys works in dong gua shan mines construction under 1 km place researching four key technology in mine s survey, they are construction survey technology in km deep mine, km deep mine s connected survey technology, km deep level survey technology of longer distances link up in many heads opening and basic control survey technology, km mine s extension when the production must go on accurate fixed position survey technology, and all obtained success

    本文結合在千米以下冬瓜山礦建設時期的測量工作,研究了深部礦山測量四個方面的關鍵技術,即千米深施工測量技術、千米深聯系測量技術、千米深中段多頭開拓長距離貫通和基本控制測量技術、千米深不停產延深精密定位測量技術,並取得了成功的效果。
  3. In order to avoid gas blast because of short circuit, it should popularize shielded mine cable under coal mine. except insulated surface of part products adopting tinnint brass wires and nylon wires, its protective shield adopting conducting rubber and shielded layer which transition resistance not bigger than 3k. the protective layer adopt high machinery chloroprene rubber which is fireproof

    為防止電纜相間短路而造成瓦斯氣體爆炸,在煤礦下應大力推廣使用屏蔽礦用電纜,除部分產品的絕緣表面採用鍍錫絲和尼絲交叉紡織之外,其外屏蔽型電纜的保護屏蔽採用導電橡皮及屏蔽層,其屏蔽層的過渡電阻不大於
  4. This paper presents the displacement solution to mine elevator viscoelastic vibrating equations and the kinetic tension calculation method, discusses kinetic tension characteristics under rectangular, ladder shaped, sinusoidal and parabolic acceleration curves, provides ways to limit or even avoid lifting rope viscoelastic vibration

    摘要給出了礦提升機粘彈性振動方程的位移解及動張力的計算方法,研究了採用矩形、梯形、正弦形、拋物線形加速度時線繩的動張力特性,給出了限制和消除提升鋼絲繩粘彈性振動的方法。
  5. Analysis of ventilation networks of dahongshan copper mine

    大紅山礦礦通風網路分析
  6. A summary introduction is made of the electrovibrating ore - drawing techniques that have been used in shizishan copper mine, which includes the electrovibrating ore drawing of the ore pass in middle section, the one for in - stope ore drawing, the one for the main underground ore bin and the one for the coarse ore bin in the concentrator

    針對獅子山礦應用中的幾種電振動放礦技術進行了總結性介紹,它們分別是:中段溜電振動放礦、采場內電振動放礦、坑下主礦倉電振動放礦、選礦廠粗礦倉電振動放礦。
  7. The technical reform of main ore pass system in shizishan copper mine

    獅子山礦主溜礦系統的技術改造
  8. This paper points out that the ore - forming pattern of this mineral deposit is ore - bearing basic - superbasic magma melting - crystalline different and ore magma impulse injection in turn. it indicates there maybe has a ore shoot in the bottom of iii rock body ( interrupted below 650m ), and advises to geophysical prospecting in the mining shaft

    並指出本礦床為含礦基性-超基性巖漿熔離-結晶分異和礦漿依次脈沖式貫入的鎳硫化物礦床成礦模式,指明號巖體下部( 650m以下中斷)可能存在一富礦體,並建議進一步做中物探證實。
  9. For example, the condenser algorithm considered the trouble condition such as the leak of tube, fail of seal in vacuum system, the lower shaft sea - ting steam pressure, pollute of tube, the high water level of hot - well. the heater algorithm considered the trouble condition such as the leak, pollute of feed - water pipe and high water level of heater

    如凝汽器演算法考慮了管泄漏、真空系統密封不嚴、軸封蒸汽壓力低、管結垢污染、熱水位過高等故障項目,加熱器演算法考慮了給水管道泄漏、給水管道污染、結垢、加熱器水位過高等故障項目。
  10. In basis of integer bush, the flange bush adopt high speed friction jointing, the materil are alluse 10 steel bracking, the surface sinter cupbsn 10 - 10tin and copper powder, have enough carrying capability and longer using life, not easy to flake off. suitable for engineer mechanism, panzer, train, pile driver, take the place of bronze cover, save the costs greatly, make the useful life longer

    翻邊軸套在整體軸套的基礎上,採用高速磨擦焊接製作而成,材料全部採用以10鋼背為基礎,表面燒結cupbsn10 - 10錫青粉,具有承載能力大,使用壽命長,不容易脫落等優勢,主要適用於工程機械,坦克,火車,打樁機上,以替代原來的青套,大大節約了成本,延長了產品的使用壽命。
  11. O - ren ishii and vernita green were the first to fall, now the bride uma thurman is out to finish the job by killing elle driver, budd, and last of all, bill david carradine

    上回講到,新娘子昏迷四年後醒來,連環出擊追殺當年在婚禮屠殺其丈夫女兒的各路仇人。她已將該死名單上的石阿蓮及頭蛇殲滅。
  12. Having already crossed two names from her death list, the bride is back with a vengeance and taking aim at budd michael madsen and elle driver daryl hannach, the only survivors from the squad of assassins who betrayed her four years earlier

    她已將該死名單上的石阿蓮及頭蛇殲滅。今回目標是餘下的三人加州山蛇響尾蛇及新娘子的終極目標舊老細標。
  13. For example, this is the first time for me to visit a walled village, and this is also my first time in life to get in touch with historical relics like bronze temple bell, ancient well, green bricks and so on

    首先,這是我第一次到訪圍村;同時,這亦是我第一次親身接觸到鐘、古、青磚等有趣的事物。
  14. Rapid construction in base rock section of main shaft in daye shitouzui copper and iron mine

    大冶石頭嘴鐵礦主筒基巖段快速施工
  15. The only museum in japan solely devoted to baseball boasts an extensive collection of materials such as portraits in bronze relief of the faces of baseball players inducted into the hall of fame, as well as the uniform worn by hideki matsui

    日本唯一的專業棒球博物館為那些步入棒球殿堂的人們製作了制的雕像,還展示松秀喜的制服,並收藏和展示了眾多與棒球相關的資料。
  16. Compared with the rope fixer of old tye crane, ss100 use wall - ties to fix the guide column. so it is much safer and covers fewer site area. further more, the protector against rope break, landing protector and monitor make ss100 much safer and reliable

    採用附墻撐桿固定導軌架,比架式升降機採用的絲繩纜網固定更安全且佔地面積小,其中設置的防斷繩和停層保護器安全可靠,可視式監視器更是一種創新。
分享友人