鋪設地板 的英文怎麼說

中文拼音 [shèdebǎn]
鋪設地板 英文
flooring
  • : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 鋪設 : spread out; lay; build; laying
  1. If if the patient is ok, so oneself ambulate, so it is good the armrest consolidate of stair to be about, and board of every a flight of stairs wants a shop to have prevent slippery establishment, such not only good climb, and the patient also can prop up building of climb down of floor place type to come with limb

    所以假如病人可以自己走動的話,那麼就要把樓梯的扶手加固好,且每個階梯都要有防滑的施,這樣不但好爬,而且病人也可以用四肢支撐方式爬下樓來。
  2. Such as : the liner of coal bunker of power station, the lining of dust cyclone and classifying cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and low friction vehicle testing surface etc

    玄武巖鑄石主要用於襯砌火電廠煤倉,各種規格旋風器,各類化工廠面,汽車剎車試驗場面等,也用於襯砌酸洗槽或儲存腐蝕性物品的貯存室。
  3. The cast basalt tiles may be used in all kinds of ways. such as : the liner of coal bunker of power station, the lining of dust cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and lowfriction vehicle testing surface etc

    玄武巖鑄石主要用於襯砌火電廠煤倉,各種規格旋風除塵器、旋流器、各類化工廠面,汽車剎車試驗場面等,也可用於襯砌酸洗槽或儲存腐蝕性物品的貯存室。
  4. After installation, clean the floor and rub it with fonson wood floor wax

    后,應清潔干凈並打一次豐盛專用蠟。
  5. Please don t lay down gas pipes and water pipes under the floor

    請不要在煤氣管水管。
  6. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省南水北調濟平乾渠工程襯砌試驗段施工情況,著重從基處理、墊層料、混凝土原材料質量、混凝土澆築、成型混凝土割縫及養護幾個方面分析了機械化襯砌混凝土裂縫產生的主要原因,並針對性提出了預防及控制措施。
  7. First, the open - ending of chinese offers all - direction gaps ; then the vagueness leaves enough scope for furthering research ; the elements of this subject paves a springboard. the synthesis of chinese constructs a bridge for it. the period of fashion inserts fresh air into the research study. the key point of this essay is the implementation of strategies of teaching and learning into the chinese teaching by the method of research study

    語文學科的開放性,為研究性學習提供了多向性介面;語文學科的模糊性,為研究性學習留下了深入鉆研的餘;語文學科的基礎性,為研究性學習了跳;語文學科的綜合性,為研究性學習搭建了橋梁;語文學科的時代性,為研究性學習注入了活水。
  8. Forced vibration of symmetric cross - ply laminates on elastic foundations

    彈性基上對稱正交層合的受迫振動
  9. Load bearing is allowed only 24 hours after the floor laying is completed, and, it is necessary to keep the indoor air circulating

    完畢后,在24小時後方可承重並要經常保持室內空氣的流通。
  10. Resilient floor coverings - specification for floor panels for loose laying

    彈性覆蓋物.活動預制裝配式樓單元規范
  11. Resilient floor coverings - specification for floor panels for loose laying ; german version en 14085 : 2003

    彈性覆蓋物.活動鋪設地板覆蓋物規范
  12. The test obsvervation include air temperature, ground temperature, foundation moisture, freeze depth, freeze capicity, freeze residual capicity, groundwater table and shape transform of canal lining, etc. throught systemic observation, analysis of impact about each factor on fundation freeze capicity, evaluate effect on anti freeze of various canal lining, comparison on technology and ecnomic of different method, a kind of main canal lining format is been recommended to engineering practice with siutable to ningxia local feature, fufilling the need of main canal safey i application, economic and practical, that is using polystyrene plate laying under concrete slate and grit taking replace of filling layer and optimizing design

    試驗觀測內容包括氣溫、溫、基土含水量、凍深、凍脹量、凍脹剩餘量、下水位和砌體外觀變化等項目。通過系統的觀測,分析各因素對基土凍脹量的影響,評價各種襯砌型式的防凍西安理工大學工程碩士專業學位論文脹效果,並進行技術和經濟綜合分析比較,推薦出了適合我區特點、滿足乾渠安全運行、經濟實用、防凍脹效果好的乾渠防滲襯砌型式,即混凝土聚苯乙烯和砂礫石換填層結構型式,加以優化計,用於工程實踐。
  13. The concept of this work comes from the riverbed and the nourishing effects the river plays in world cultures. symbolizing riverbeds in nature and adding a touch of leisure life in modern society, the five granite beds rest on a miniature course of the keelung river with small current of water running on each one. the sandblasted forms of fruits and maple leaves recall the importance of environment

    本作品河床,以大河孕育文化做為作品創作發想點,加入現代社會的生活休憩概念,將五組象徵大自然中河川交匯的床型花崗巖雕塑,架于卵石所而成的基隆河之上基隆河的河道造型則保持截彎取直前的原貌,並以少流量的水流,薄薄覆蓋五組床型雕塑品,床上散落的楓葉與果實,則象徵環保理念對大自然保育的重要性。
  14. Dtu 51. 11. parquet floors and wood - faced inlaid floor coverings. laying of floating parquet floors and wood - faced, inlaid floor covering. part 1 : technical specifications

    Dtu51 . 11拼接和木面鑲嵌.浮置拼接和木面鑲嵌.第1部分機械規范
  15. Dtu 51. 11. parquet floors and wood - faced, inlaid floor coverings. private contracts. laying of parquet floors and wood - faced inlaid floor coverings. part 2 : special clauses

    Dtu51 . 11拼接和木面鑲嵌.專門合同.鑲木拼接和木面鑲嵌.第2部分:特殊條款
  16. Given the thermal physical parameters of the envelops and the weather data, the above two parameters are determined by the following system design parameters : radiant panel dimension, radiant panel location and radiant panel layout style ( center or peripheral ). based on the thermal net model, digital analysis of the energy consumption and thermal environment are carried out to the several representative spaces under different design parameters, through which the relations of the heating load to the design parameters are obtained and can be a reference in the practical system design

    對于給定圍護結構熱物性參數和室外氣候參數的條件下,室內平均輻射溫度和室內空氣溫度的大小取決于系統的計參數:輻射的布置方式(周邊布置和中心布置) 、輻射尺寸和輻射位置。基於熱網模型,利用matlab軟體編程對採暖空間在不同計參數下室內的熱環境和能耗進行數值分析,得出了低溫熱水輻射採暖系統的性能和能耗指標隨這些參數變化的規律,從而為低溫熱水輻射採暖系統的優化計提供了參考。
  17. Suspension construction method : use saws to cut the plywood 9 c 12mm thick into square blocks sized between 600 c 120 mm and securely nail them into the concrete ground at an interval of 20 mm

    步驟3 :墊層1懸浮施工法:將9mm - 12mm厚的夾鋸成600mm - 120mm的方塊間隔20mm釘牢水泥面。
  18. Standard practice for preparing concrete floors to receive resilient flooring

    彈性前混凝土樓準備的標準規程
  19. All the tasks required to lay a foundation must be completed before construction of the ground floor begins

    鋪設地板之前,修建基必需的所有任務都應該完成。
  20. Check the smoothness of the floors by setting up alignment lines. when installing, check the smoothness for each step

    行切割安裝,拉線檢查所鋪設地板的平直度,安裝時隨隨檢。
分享友人