鋪設管道 的英文怎麼說

中文拼音 [shèguǎndào]
鋪設管道 英文
laying pipes
  • : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 鋪設 : spread out; lay; build; laying
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  1. A total of 48 km of sewage pipes were installed, serving an area of 20 square km. as a result, lhasa is no longer muddy during the rainy season. two waterworks were built and connected through a 70 - km network of pipes to some 60 percent of homes

    全城新修柏油馬路15條,全長70公里,拉薩街變得平坦寬闊了;上下排水48公里,服務面積20平方公里,拉薩再也不是下雨滿城水滿城泥了;新建自來水廠兩個,70公里,供水面積占城區的60 ,拉薩人從此能喝上新鮮清潔的自來水了。
  2. We shall have to dig under the river to lay the sewage pipe

    "為了污水,我們必須在河床下面開一條通
  3. Article 12 when the laying of submarine cables and pipelines and other marine engineering operations require that those submarine cables and pipelines already laid be moved, prior consultations must be conducted with the owners of the aforesaid installations and an approval must be obtained from the competent authorities before the said engineering project starts

    第十二條海底電纜、及其他海上作業,需要移動已的海底電纜、時,應當先與所有者協商,並經主機關批準後方可施工。
  4. Guides of laying for asbestos - cement water and gas pipelines

    石棉水泥輸水輸煤氣指南
  5. Half the road surface is being taken up to lay new gas pipes

    人們挖開半個路面以新的煤氣
  6. A system of pipes, such as those used in plumbing

    線,網一系統,如那些用來
  7. A pipeline may be laid.

    可以鋪設管道
  8. Some lines are laid on the surface, especially in deserted country.

    有的在地面上,特別是在人煙稀少的地區。
  9. Article 19 : building of dam, sluice gate, bridge, wharf and other structures blocking, crossing or bordering a river channel ; laying pipelines or cables across a river, must comply with state - specified standards for flood control and navigation as well as other related technical requirements

    第十九條修建閘壩、橋梁、碼頭和其他攔河、跨河、臨河建築物,跨河、電纜,必須符合國家規定的防洪標準、通航標準和其他有關的技術要求。
  10. Article 18 the competent authorities shall collect data concerning submarine topography and the distribution of structures at sea in order to offer consultancy services for laying of submarine cables and pipelines, and for conducting relevant investigations and surveying activities

    第十八條主機關應當收集海底地形、海上構築物分佈等方面的資料,為海底電纜、及其調查、勘測活動提供咨詢服務。
  11. Aiming at the great challenge of deepwater oil resource exploitation in 21st century china, this paper firstly explained contents of offshore engineering joining technology, then introduced a series of important technologies such as deepwater pipeline laying welding, local dry welding, underwater hyperbaric welding, and friction stir welding, lastly put forward countermeasures to develop offshore engineering joining technology in china

    摘要在解釋海洋工程連接技術內涵的基礎之上,針對21世紀我國海洋石油開發深水資源的巨大挑戰,對深水海底焊接、局部乾式焊接、水下乾式高壓焊接以後摩擦疊焊等重要技術進行了介紹,最後提出了發展我國海洋工程連接技術的對策。
  12. Laying precast concrete drainage pipes at widening section road r

    于擴闊雨水渠渠
  13. Provisions governing the laying of submarine cables and pipelines

    海底電纜理規定
  14. The east - west oil pipeline is nearly half welded and laid

    東西貫通的輸油已經差不多焊接和好了一半。
  15. This solution may be far cheaper than having workmen put in cable ducts to wire the building

    這種解決方案比請工人電纜來給建築安裝線路要便宜得多。
  16. The workers are laying pipes under the road

    工人們正在路下面鋪設管道
  17. Ofta s work in this aspect includes licensing and regulation of services ; setting equipment and network connection standards ; type - approving telecommunications equipment ; administering the numbering plan ; handling issues concerning access to land and provision of physical facilities for the installation of networks, including the co - ordination of access to buildings by operators and laying of ducts for telecommunication cables in public roads ; and handling and investigating consumer complaints pertaining to suspected breach of provisions in the telecommunications ordinance and licence conditions

    包括規電訊服務及簽發牌照、制定電訊器材及網路接駁的標準、檢定無線電器材類型、理電訊服務號碼計劃、處理有關進入土地和提供有形施作網路裝用途的事宜,包括協調營辦商進入樓宇及在公用路為通訊電纜鋪設管道,以及處理和調查與涉嫌違反《電訊條例》和發牌條款有關的消費者投訴。
  18. Besides, in muk wu pumping station, additional water reception works were constructed in addition to the excavation of a 5. 2 - km tunnel and the laying of 5, 000 metre of water pipes

    2公里長隧5 , 000米的水,將接收廣東省供水工程列為十二年計劃的一部份。
  19. It has a diameter of 48 inches. the whole length stretched to 10 miles. it started at a place near to man kam to, passed through shek po tau, fanling, and then integrated with tai lam chung catchwater at about l mile from shek kong

    第一條自邊境之水, 1960年是在達成深圳供水協議后裝置,水直徑48寸,全長約十哩,起自文錦渡附近,經石陂頭、粉嶺至距石岡一哩入大欖涌引水止。
  20. On another side, this paper analysises the effect of the municipal pipeline on sector tunnel construction, and gives a proposal for soluation

    研究了3種不同形式的區間隧(雙圓隧、單圓隧、矩形隧)內線的方式,並分析了外來線對隧的影響,提出了解決方案。
分享友人