鋼拉梁 的英文怎麼說

中文拼音 [gāngliáng]
鋼拉梁 英文
steel tie beam
  • : 鋼名詞(鐵和碳的合金) steel
  • : 拉構詞成分。
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. It canbe determined the enhancing effect of new steel fiber to shear resistance of beams by the test of tensile strength of steel fiber reinforced concrete, it is important to reduce test cose and increase research efficiency

    可以通過纖維混凝土抗強度試驗來確定新品種纖維對斜截面上混凝土受剪承載力的增強作用,這對于降低試驗成本和提高研究效率具有重要工程價值。
  2. Abstract : based on the analysis of the main failures discovered in pavement on steel deck plate and the demanding service condition of the pavement on steel deck, high - temperature rutting test, low - temperature bending test and controlled stress flexural fatigue test are used to study the performance of asphalt mixtures modified by epoxy resin including high - temperature stability, low - temperature cracking - resistance, and fatigue cracking - resistance, which are served to evaluate the modification effect of epoxy resin of different contents. with the addition of epoxy resin, all the three performances are improved greatly. however, when the amount of epoxy resin added is over a certain value, the modification effect will be stable with no extra benefit detected. finally, in terms of the properties of the three respects, 20 ?, 30 ?, 30 ? are given separately as the proposal adding contents

    文摘:在分析橋面鋪裝層主要病害和特殊工作環境的前提下,分別採用高溫車轍試驗、低溫小彎曲試驗和控制應力小疲勞試驗,研究了不同環氧樹脂摻量下的環氧樹脂改性瀝青混合料的高溫穩定性、低溫抗裂性和抗疲勞性能.試驗結果表明:環氧樹脂對這3個方面都有很大的改進效果,但改性效果和樹脂的添加量並不是一個無限遞增的關系,當添加量超過一定數值以後,改性的效果將趨于平穩.最後就高溫、低溫、疲勞3個方面分別提出環氧樹脂添加量為20 ? , 30 ? , 30 ?的建議值
  3. Based on the analysis of the main failures discovered in pavement on steel deck plate and the demanding service condition of the pavement on steel deck, high - temperature rutting test, low - temperature bending test and controlled stress flexural fatigue test are used to study the performance of asphalt mixtures modified by epoxy resin including high - temperature stability, low - temperature cracking - resistance, and fatigue cracking - resistance, which are served to evaluate the modification effect of epoxy resin of different contents. with the addition of epoxy resin, all the three performances are improved greatly. however, when the amount of epoxy resin added is over a certain value, the modification effect will be stable with no extra benefit detected. finally, in terms of the properties of the three respects, 20 ?, 30 ?, 30 ? are given separately as the proposal adding contents

    在分析橋面鋪裝層主要病害和特殊工作環境的前提下,分別採用高溫車轍試驗、低溫小彎曲試驗和控制應力小疲勞試驗,研究了不同環氧樹脂摻量下的環氧樹脂改性瀝青混合料的高溫穩定性、低溫抗裂性和抗疲勞性能.試驗結果表明:環氧樹脂對這3個方面都有很大的改進效果,但改性效果和樹脂的添加量並不是一個無限遞增的關系,當添加量超過一定數值以後,改性的效果將趨于平穩.最後就高溫、低溫、疲勞3個方面分別提出環氧樹脂添加量為20 ? , 30 ? , 30 ?的建議值
  4. Here the hsc of sompa is achieved through adding super - effective water reducer, fined slag and silicon fume, and decreasing the water / cement ratio. by varying the area ( spacing ) of tension bars, compressive bars, vertical links and distribution steel and embedding steel fiber and polypropylene fiber we try to improve the behaviors of reinforced high performance concrete one - way spanning slabs in bending, so that its ductility be greater than 5. with the same arrangement of steel the width of bending member is varied to observe the effect of the width / depth ratio on the ultimate compressive strain of concrete

    通過變化受筋含筋率和受壓筋、箍筋(鉤筋、分佈筋)含量,或摻加纖維使之成為纖維高強混凝土( sfrhsc )和聚丙烯纖維高強混凝土( pfrhsc ) ,對高強混凝土雙筋截面、板的受彎性能進行了試驗研究,試圖改善高強混凝土受彎構件的延性,使其延性比大於5 ;並在相同配筋情況下,通過變化截面寬度,研究了高強混凝土受彎構件的寬高比對壓區混凝土極限應變的影響;並對試驗構件的裂縫發展情況進行了觀測。
  5. A comparison of steel deck weights indicates that the cable-stayed bridge again fills the void between the continuous girder and suspension bridges.

    以上橋面重量的比較指出,斜橋介於連續和懸索橋之間。
  6. This paper presents the structural design of the main bridge of lhasa river bridge, makes a deep - going study of the key techniques for design of the bridge, such as the reasonable span length ratio of each span of the 5 - span girder and arch hybrid structure, mechanical behaviour of the dual arch ribs, and section of the continuous girder tie beam, and also works out rigidity and stress conditions of the continuous girder tie beam and stress conditions of the concrete - filled steel tube arches of the main bridge

    摘要介紹了薩河特大橋主橋結構設計情況,對於五跨拱組合橋各孔跨合理的跨度比、疊拱的受力行為及連續系桿截面形式等設計中的關鍵性問題進行了深入的研究,給出了主橋連續系桿的剛度和應力情況、管混凝土拱的應力情況。
  7. The results indicated that the anchoring effect was better with angle steel than with cfrp, and that anchoring was very important at root of beam, which can avoid occurrence of tympanites like cfrp

    可以看出:採用角錨固的效果要比採用碳纖維布錨固好,根部的錨固也非常重要,可以避免類似碳纖維布被鼓現象的發生。
  8. The research in this paper is expected to provide helpful reference for the future design of pedestrian bridge with spacial double - layer cable system and abnormity steel box girder

    通過本文的研究,以期為今後空間布置的雙層索系以及異形橋在人行景觀橋設計中的應用提供有益參考。
  9. Spanning and constructing technology of the reverse pulling steel girder

    反向拖架設施工技術
  10. Under selfgravity and secondary dead load, the wide steel box girder cable - stay bridge has a large deflection in transverse

    寬較大的斜在自重和二期恆載的作用下,在橫橋向有著較大的撓度,在設計中必須予以考慮。
  11. This paper highlights the durability design features and design alternative adopted for the parts of steel structure, concrete decks of and joints between steel and concrete composite box girder for the cable - stayed spans of donghai bridge over main navigable channel in the marine environment

    摘要介紹東海大橋主航道斜混凝土箱形結合結構部分、混凝土橋面板、混凝土結合部位在海洋環境下耐久性設計特點及採用方案。
  12. It was essential that the lifted girder could be moved by any angle. a hand drawn chain hoist was used instead of a steel wire rope to enable the girder to be moved freelyby any angle. the suspension centers should be kept far apart but to the front as much as possible

    起吊后的靈活、方便的角度調整是關鍵,吊裝時用有足夠行程的手葫蘆代替絲繩,以便進行角度調整,要求吊點相距要大一些,而且吊點盡量靠前端。
  13. During the on - site experiment for full - scale segmental model of the girder, stress and cracks of the side - boxes were surveyed

    進行標準段足尺模型試驗,觀測試驗模型橫向預應力束張后,主邊箱測點的應變,以及模型表面混凝土裂縫的情況。
  14. On the basis of the inspection for pile foundations of a bridge in bangladesh, this paper describes the ultrasonic inspection for a special case of bored pile embedded with sounding pipes in between its double layers of reinforcement cages, analyzes the influential factors of the inspection in such case and also compares the evaluation criteria on the ultrasonic inspection for pile foundations at home and abroad

    摘要結合孟加一座橋的樁基檢測,闡述了聲測管埋設在雙層筋籠之間這一特殊情況的超聲檢測,對其所受的影響因素進行了分析,進而對國內與國際上的樁基超聲檢測評定標準進行了比較。
  15. Considered local damage due to steels corrosion, fatigue, prestressing loses, whole bridge incline and distortion, this paper studies damage diagnosis technique of the cable - stayed bridge and determines the location and size of damages for yonghe cable - stayed bridge, which has been used after 15 years

    針對筋腐蝕、疲勞、預應力鬆弛、橋整體傾斜或變形所引起的斜橋局部破損,本文以使用15年後的永和斜橋為研究對象,對大型斜橋破損診斷技術進行研究,對永和斜橋破損位置進行定位、對其破損程度進行評價。
  16. The theme get the integration between design of the large highway bridge in anqing and theory studying, carry out an research in emulating calculation of steel box beam cable - stay bridge. the theme used the transfer - matrix in solving computing of cable - stay bridge structure, got a improving in computing of cable and the load and landed of cable strength

    針對箱粱斜橋的特性,論文確定了以控制箱粱端位移與索內力為調整目標,利用循環的正裝過程對斜橋的模擬進行計算,並對索塔的塔頂位移進行了良好的控制。
  17. Regarding the rc beams subjected to concentrated load or even load and braced by bonding steel, an analysis is made on the relevant factors influencing maximum anchorage shear stress of steel sheet. the analysis is based on elastic theory and makes use of the formula for calculating anchorage shear stress of steel sheet. as indicated by the results, the maximum anchorage shear stress not only realtes to such parameters as height of cross section of rc beam and span but also relates to the thickness of adhesive layer, elastic modulus, thickness of steel sheet, and length of steel sheet. the present method will check maximum an chorage shear stress on the end of shear sheet so as to prevent rc beam from local damage. the present results will offer important reference for our country to further perfect bracing design by bonding steel method

    在彈性理論的基礎上,利用板錨固剪應力計算公式,對在集中荷載或均布荷載作用下採用粘加固的混凝土,分析板錨固最大剪應力的有關影響因數.結果表明,最大錨固剪應力不但和混凝土的截面高度、跨度等參數有關,還和粘膠層厚度、彈性模量、板厚度及板長度有關.採用文中方法可以對板端部最大錨固剪應力進行驗算,防止混凝土出現局部受破壞.研究結果為進一步完善我國粘法加固設計提供重要的參考資料
  18. The main causes, which have effects on redistribution of internal force in the prestressed frame, including the relative height compressive zone of section, secondary moment and types of load applying are taken into account. the horizontal braces force which results from the tension of the prestressing steel, reduces the pre - compress stress is analyzed

    並且探討了各影響因素對框架截面延性的影響和由於柱的抗側剛度在預應力筋張時約束的軸向變形,從而影響預應力在中的建立所造成的中軸向預壓力的損失。
  19. However, the stud welding roots in the negative moment region of the beam are often subjected to the joint action of shear stress cycling of the studs and tensile stress cycling of steel girder flanges

    但在負彎矩處栓釘焊趾往往承受栓釘剪應力循環和翼緣應力循環的共同作用。
  20. During the finite element modeling of the bridge, the factors affecting the accuracy of the finite element model are discussed in detail, such as, the geometrical non - linearity of the cable including gravitational sag and initial tension, and the structural orthotropic steel box - girder deck to be equivalent to physical orthotropic deck by using compound material mechanics, and so on

    在建模過程中,盡可能多地考慮了一些影響全橋有限元模型精度的因素:如斜索的幾何非線性(重力垂度和初始應力) ,將構造正交各向異性橋面板用復合材料力學的方法等效為物理正交各向異性板等。
分享友人