鋼樁平臺 的英文怎麼說

中文拼音 [gāngzhuāngpíngtái]
鋼樁平臺 英文
piled-steel platform
  • : 鋼名詞(鐵和碳的合金) steel
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  1. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮吊,完成了水上運輸、水上起重等作業,如的運輸、插打、水上施工的搭設、鉆機吊車的水上轉移、承吊箱的起吊、的拔除等作業。
  2. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「板箍法」做地基梁筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔、承梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔施工採用筋砼護壁確保挖孔的安全成型,使用柔性連接鉤進行筋籠吊裝簡化施工工序;承梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  3. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證具有足夠的承載力的橋墩,採用;對主河道上河床沒有覆蓋層,無法插打的橋墩,採用浮式
  4. By means of the numerical simulation and considering many factors synthetically such as steel weight of the platform structure, the construction program, investment costs and geotechnical risk, the contrastive analysis has been made to the types of the platform structures with skirt piles and main pile, and finally it is determined in use skirt piles for weizhou 11 - 1 platform

    通過數值模擬計算,綜合考慮結構用量、施工方案、投資費用和工程地質風險等多種因素,對採用裙結構型式和主結構型式兩種方案進行了對比分析,最終確定潿洲11 - 1採用裙結構型式。
  5. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋鉆孔灌注施工中,在不同地質條件下,水上鉆機的搭設、成孔設備的選型、事故的處理,並對護筒的埋設及破碎帶傾斜巖面上鉆孔嵌巖面上鉆孔孔底標高問題作了探討
  6. The works included 24 bored piles of 2. 5 meters in diameter and 55 meters in depth, 500 meters long underground concrete diaphragm wall of 0. 8 meters thick and 25 meters deep, 450 pre - cast concrete pile of 0. 5 meters in diameter, 12 meters deep soil excavation with multi - layer post - tensioning shoring system, reinforced concrete pile caps and basement slabs

    其工程內容包括了24支直徑2 . 5米,深達55米直入巖層的鉆孔,周長500米,深度25米,厚度0 . 8米的地下連續混凝土墻, 450支直徑0 . 5米預制混凝土, 12米深開挖,多層水支撐系統,混凝土及地庫底板結構。
分享友人