鋼筋布置 的英文怎麼說

中文拼音 [gāngjīnzhì]
鋼筋布置 英文
arrangement of bar
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
  1. The designer chooses the layout of reinforcement.

    設計者選擇鋼筋布置
  2. Frame columns inset the filler - wall, avoided the influence that the comer of the room columns outstanding to indoorses view and take up the using space. at the same time, this structure has some advantages as the frame structure, such as arranging neatly, comparting easily etc., deeply welcoming by inhabitant and real estates company, is a building structure system that have the vast development foreground and satisfying the request of green building ". current, the reinforced concrete special - shaped columns structu re system lacks the actual measuring data of earthquake damage and the comprehensive aseismic performance of structure system, the structure system not yet is included in the national code, needing the thorough research

    混凝土異型柱結構體系,採用t形、 l形、十形截面柱代替傳統的矩形截面柱,以輕質材料製作的框架填充墻代替自重較大的粘土磚填充墻;框架柱隱于墻內,避免了屋角柱楞突出對室內觀瞻及佔用空間的影響,同時,又具有框架結構靈活、易於分隔的優點,深受住戶及房地產開發商的歡迎,是一種滿足「綠色建築」要求並具有廣闊發展前景的建築結構體系。
  3. Finally, considering the request of the gfrp bars reinforced furan resin concrete electrobath, we designed the structure of the electrobath and use finite element method to analyse it. in the process, pre - stress also was considered. the result of use in practice indicate the properties of gfrp bars can meet the request of electrobath structure

    最後結合玻璃呋喃樹脂混凝土電解槽的設計與開發,對電解槽的配、結構尺寸進行了設計,用有限元方法對電解槽的整體結構進行了計算分析,並考慮了玻璃預應力的影響,其設計計算結果已在玻璃呋喃樹脂混凝土電解槽的實際生產中得到了應用,且使用情況良好。
  4. Stirrup joints ( congruence ) should be staggered in the last two of erect steel

    的接頭(彎鉤疊合處)應交錯在兩根架立
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  7. Consequently, the precast components don ’ t need any interim falseworks to be supported in the mid - span as bottom forms when the laminated concrete lay is being placed. furthermore, to form two - way slabs, the transverse steels can be arranged through the rectangular cores in the ribs of the precast slabs as needed. it makes the construction of composite two - way slabs easier and more feasible, practical, and suitable to introduce and apply to the building construction on a large area

    由於預制構件具有剛度大和承載力高的特點,施工時以預制構件作為樓板底模無需設跨中臨時支撐;同時還能通過預制構件板肋預留的長方形孔橫向受力實現樓板的雙向配,使預應力雙向疊合樓板的施工簡單易行,更適合於大面積的推廣應用,具有較大的工程應用價值。
  8. As for the improvement of ductility of masonry structure and the aseismatic performance of building, several factors were discussed, which consisted of the layout of building plane and building elevation, the building level number and height, the layout of vertical wall and cross wall, thus enhancing the intensity of mortar, ring beam, constructional column and the placement of horizontal reinforcing steel bar

    從建築平面和立面的局、房屋的層數和高度、縱墻和橫墻的、提高砂漿強度、圈樑和構造柱以及水平的放等多個方面來進行探討,從而改善砌體結構延性,提高房屋的抗震性能。
  9. The coal unloading chute is a kind of the underground reinforced concrete box structure. the main beam of coal unloading chute being made skew, this kind of structure has been the first time in domestic

    進煤系統的主體建築物卸煤溝為地下式混凝箱形結構,卸煤溝溝頂主梁採用斜向,這種結構形式在國內尚屬首次。
  10. Finally, the crack width computation is discussed. as the crack model ca n ' t calculate the crack width alone, this paper adopts the method of combining the crack model and the experiential formula of space between crack. considering the uniformity factor is ignored in the experiential formula of space between crack, the formula of space between crack is modified so that it is fit for the real case

    基於等效彌漫裂縫模型計算裂縫寬度有很大的局限性,本文採用了有限元法和經驗公式相結合的方法來計算裂縫寬度值,考慮到所引用的裂縫間距經驗公式忽視了鋼筋布置的不均勻性這一重要影響因素,本文對引用的裂縫間距經驗公式進行了修正,使之更符合實際情況。
  11. According to the result, the software recommends the best steel dimension and the layout

    根據計算的結果,程序給出最優的錨桿直徑,同時給出方式。
  12. Based on the reliability, economy and feasibility of the control measures, a relatively rational reinforced scheme is selected, which can provide valuable suggestions for engineering application

    從控制措施的可靠性、經濟性角度出發,建議選擇相對合理的跨縫鋼筋布置方案,為橫縫配措施的初步設計和工程應用提供了有價值的參考。
  13. It is found by comparison that as the structural forms of special - shaped columns and short - shear walls are used, the structures should be arranged reasonably so as to meet the needs of lateral stiffness, and axial compression ratio should be controlled strictly so as to meet the needs of constructional reinforcement to prevent the probably curling and shear failure for the purpose of meeting the needs of the construction of small high - buildings

    對比討論發現:採用混凝土異形柱和短肢剪力墻的結構形式時,應當進行合理的結構以滿足結構整體抗側移剛度的要求,同時嚴格控制豎向構件軸壓比並滿足配構造以防止構件可能出現的翹曲和剪切破壞,這樣才能同時滿足小高層住宅對建築和結構的需要。
分享友人