鋼筋架設 的英文怎麼說

中文拼音 [gāngjīnjiàshè]
鋼筋架設 英文
reinforcement erection
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
  • 架設 : set up; erect
  1. The main components of the latter are multi - rib sandwich panels, including floor slabs and wall slabs. reinforced concrete conformation columns are set where the longitudinal walls and latitudinal walls intersect and copulative beams are set where floor slabs and wall slabs intersect. they play a role of linking and transferring loads, bearing a small part of loads at the same time

    無骨體系的主要承重構件是密肋夾芯板(包括樓板和墻板) ,縱、橫墻相交處混凝土構造(連接)柱,墻板和樓板相交處連系(圈)梁,連系梁和柱主要起連接和傳遞荷載作用,也承擔少部分荷載。
  2. In this paper the energy dissipation mechanism and anti - earthquake ductility design of ferroconcrete frame structure are expounded mainly

    文章主要闡述了混凝土框結構的耗能機理和抗震延性計的方法。
  3. In order to use structure ' s ability of elastic - plastic deformation to consume the earthquake energy, decrease the reaction in the earthquake, ferroconcrete frame structure should be designed into ductile one

    為了利用結構的彈塑性變形能力耗散地震能量,減輕地震作用下結構的反應,應將混凝土框結構計成延性框結構。
  4. Fixed railway installations. equipment for overhead telecommunication and signalling lines. reinforced concrete socles

    鐵路固定備.通信和信號線路空線用備.混凝土製管座
  5. Fixed railway installations. equipment for overhead telecommunication and signalling lines. plate for securing cross - pieces to reinforced concrete posts

    鐵路固定備.通訊和信號裝置空線路用器材.混凝土電桿上橫梁固定用板
  6. According to the shear - type floor model of frame structure, a basic control equation is constructed to analyze the nonlinear seismic responses of structure equipped with edd - bracing system. subsequently the dynamical finite element analysis are carried on to obtain the seismic response of a twelve - floor r. c frame with the three edd - bracing system under minute earthquake and disastrous earthquake, and the conclusions provide useful references for practical earthquake - resistant design

    基於框結構剪切型層模型,建立了耗能阻尼器對建築結構非線性地震反應的基本控制方程,由此進行了某十二層混凝土框結構置三種耗能阻尼器在多遇和罕遇地震下的動力有限元分析,為進行實際結構置耗能阻尼器的抗震計提供了有益的參考。
  7. With the diversification of people ' s esthetic sentiment to upholstery, the staggered reinforced concrete frames are used more and more widely. specifications for staggered joint are n ' t contained in code for design of concrete structures gb50010 - 2002, so, the research on shear transfer mechanisms ; seismic behavior and shear resistance of staggered joints is urgent

    隨著人們建築室內審美情趣的日益多樣化,錯層框結構在國內應用越來越廣泛,目前的《混凝土結構計規范gb50010 - 2002 》中還沒有針對錯層節點的專門規定,因此,對混凝土錯層節點的傳力機理、抗震性能和抗剪承載力的研究就顯得尤為迫切。
  8. It is respectively : production, facility for transporting operates personnel : jockey of lathe work, milling, grinding work, boring labour, solderer, modular machine tool, machining center jockey, casting matchs benchwork, besmear to install ship - fitter of ship - fitter of equipment of benchwork of labour, tool, boiler, electric machinery, discretion to control ship - fitter of appearance of ship - fitter of appearance of instrument of electric equipment ship - fitter, electron, electrical engineering instrument, machine ; irrigation works of aricultural herd fishing produces personnel : inspector of quarantine of the member that animal epidemic disease prevents and cure, animal, firedamp produces work ; personnel of line of business of commerce, service : the member that assistant, bagman, publication is issued, chinese traditional medicine purchase and sale, clerk of the member that the division of division of appraisal appraisal division, chinese style noodle, chinese style noodle, western - style cook division, western - style noodle division, division that move wine, nutrition distributes food, dining - room, antechamber clerk, client clerk, health care ; handle affairs personnel and concerned personnel : secretary, public relations member, the member that terminal of communication of computer operator, cartographer, operator, user is maintained

    分別是:生產、運輸備操作人員:車工、銑工、磨工、鏜工、焊工、組合機床操作工、加工中心操作工、鑄配鉗工、塗裝工、工具鉗工、鍋爐備裝配工、電機裝配工、高低壓電器裝配工、電子儀器儀表裝配工、電工儀器儀表裝配工、機修鉗工、汽車修理工、摩托車維修工、精密儀器儀表修理工、鍋爐備安裝工、變電備安裝工、維修電工、計算機維修工、手工木工、精細木工、音響調音員、貴金屬首飾手工製作工、土石方機械操作工、砌築工、混凝土工、工、子工、防水工、裝飾裝修工、電氣備安裝工、管工、汽車駕駛員、起重裝卸機械操作工、化學檢驗工、食品檢驗工、紡織纖維檢驗工、貴金屬首飾鉆石檢驗員、防腐蝕工;農林牧漁水利生產人員:動物疫病防治員、動物檢疫檢驗員、沼氣生產工;商業、服務業人員:營業員、推銷員、出版物發行員、中藥購銷員、鑒定估價師、中式面點師、中式面點師、西式烹調師、西式面點師、調酒師、營養配菜員、餐廳服務員、前廳服務員、客戶服務員、保健按摩師、職業指導員、物業指導員、物業治理員、鍋爐操作工、美容師、美發師、攝影師、眼鏡驗光員、眼鏡定配工、家用電子產品維修工、家用電器產品維修工、照相器材維修工、鐘表維修工、辦公備維修工、保育員、家政服務員、養老護理員;辦事人員和有關人員:秘書、公關員、計算機操作員、制圖員、話務員、用戶通信終端維修員。
  9. Ductility design of reinforced concrete frame structure

    混凝土框結構的抗震延性計要求
  10. Design and application of spotwelder for steel mesh reinforcement

    點焊機的計及應用
  11. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎,分底腹板和頂板分別綁扎並吊裝入模;拆裝式和液壓式兩種模板的計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  12. Seismic ductility design for reinforced concrete framework structure

    混凝土框結構的延性抗震
  13. With the extensive application of composite structures, the behavior of composite actionbetween concrete floor and steel beams has become an attractive area for research. consideringthis kind of combination function, the frame should be designed according to steel - concretecomposite frames, and the working behavior of its beam - column connections is the basis ofanalytic foundation of such frames

    隨著組合結構的廣泛應用,考慮混凝土樓板和梁之間的組合作用也正成為人們越來越關注的研究課題,考慮這種組合作用后,框應該按-混凝土組合框進行分析計,其樑柱連接節點半剛性工作性能的分析是這種組合結構分析的基礎。
  14. In view of the rapid development of electric undertaking and a sharp increase of steel products consumption, the state development planning commission, the former state water resources and hydropower ministry and state energy ministry have been urging that the building of steel towers should be strictly controlled in the construction of transformer substations ; and warning that the need of the present 500kv power transmission and transformer trusses can hardly be satisfied by ordinary steel and concrete electric poles or prestressed concrete poles, which have endangered the operation and longevity of the high voltage transmitting line due to the common problem of cracks by gravity

    隨著電力工業建的迅速發展,材的用量急劇增長,為此,國家計委,原水電部和能源部一再強調在輸變電工程建中,應從嚴掌握自立式鐵塔的建。然而,一般的混凝土電桿或與預應力混凝土電桿,較普遍地存在著縱向裂縫問題,嚴重影響了高壓輸電線路的安全運行及其使用壽命,已不能適應高壓輸電桿塔和變電構的要求。
  15. It begins with designing two representative reinforced concrete public frames according to new codes in this paper, and carries out nonlinear dynamic analysis by inputting ground motions at the intensity of intermediate earthquake and rare earthquake actions. the slab - bars effect on yield strength of beams is involved in analysis

    本文嚴格按照新規范計了防烈度分別為7度半、 8度半的兩個民用建築混凝土典型框,然後分別對其進行了防地震作用和罕遇地震作用下的非線性動力反應分析,並在分析中考慮了板作用對梁端屈服彎矩的影響。
  16. Many optimization joints mid design methods which have been applied in actual engineerings are put forward, including the rc looped - beam joint, enforced - steel loop joint, joint between columns filled with steel tubes and rc beams, joint between columns filled with steel reinforced concrete and rc columns, joint between column filled with steel tube and composite beam, composite beam design method, prestressed laminated open - web truss mid so on

    其中,提出的較優化的砼環梁節點、加強環節點、管砼柱與砼柱節點、骨砼柱與砼梁節點、骨磚柱與組合梁節點及組合梁計方法、預應力疊層空腹桁等,都已應用於實際高層建築中。
  17. Compared with the normal flat - plate floor, the cast - in - place reinforced concrete hollow flat - plate floor has two special characteristics. to produce the hollow floor, the hollow columns are pre - buried in the floor. there are concealed wide - flat beams between the frame columns

    和普通平板無梁樓蓋相比,現澆混凝土空心板無梁樓蓋有兩個突出的不同點,一是在樓板內預埋空心圓筒形成空心樓板,二是在框柱之間有暗扁梁。
  18. In order to reveal load mechanism and failure mode of thick pile caps, by means of the test of 1 / 4 - scale models of thick pile caps with six piles and post - handling study of 3 - dimensional non - linear finite element adina, this paper points out the shortage, which is that the design of pile caps is carried out by flexural strength in chinese technical code for building pile foundations jgj94 - 94 and american reinforcement concrete building construction code aci318 - 02, promulgates that the failure mode of thick pile caps is punching failure and load transfer mechanism is the strut - and - tie, which is that zones of concrete with primarily unidirectional compressive stresses are modeled by compress struts, while tension ties are used to model longitudinal reinforcement over pile

    摘要為揭示厚承臺的傳力機理和破壞形式,通過對4個1 : 5比例的六樁厚承臺的模型試驗研究與三維非線性有限元adina的后處理研究,指出中國建築樁基技術規范jgj94 - 94與美國砼房屋建築規范aci318 - 02規范中,承臺以彎曲強度進行配計算的計方法之不足,揭示出厚承臺的破壞模式是沖切破壞,傳力機理是以帶有主要單向壓應力的砼區域作斜壓桿,樁頂區域的縱作拉桿的空間桁
  19. This paper analyses the annotated rules of the steel information of the frame column expressed in " plane method " construction drawing, sums up the expressed characteristics of the reinforcement information of the frame column, the object - oriented method is adopted to get the expressed pattern of the steel information. owing to " plane method " shop drawing steel information is expressed by geometry parameter, combine of the shop drawing and the detailed construct drawing can full express the steel information. by study of the information, this paper set up the steel parameter graph base

    對「平法」施工圖中框信息的注寫規則進行了深入的分析和研究,對完整反映框的各類信息表達特點進行了歸納,在此基礎上利用面向對象的程序計方法及c + +語言建立了描述框所有信息的表達模型;由於在「平法」施工圖中各類構件的幾何信息是一種抽象的以參數表達的信息,影響參數由圖中的標注信息和標準構造詳圖中的構造要求確定。
  20. The results show that the antipunching shear bearing capacity and ductility of frame column underpin system are improved by installing coupling bar at the interface of the new - to - old concrete and enlarging the reinforcing bars at the centre and upper position in the underpinning beam

    結果表明:置新老混凝土界面連接和增大托換梁中部和上部配可提高框柱托換體系的抗沖剪承載力和延性。
分享友人