鋼筋混凝土管 的英文怎麼說

中文拼音 [gāngjīnhúnníngguǎn]
鋼筋混凝土管 英文
concrete reinforced pipe
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Standard specification for reinforced concrete low - head pressure pipe

    低水頭壓力標準規范
  2. Standard specification for reinforced concrete low - head pressure pipe metric

    低水頭壓力的標準規范
  3. Fixed railway installations. equipment for overhead telecommunication and signalling lines. reinforced concrete socles

    鐵路固定設備.通信和信號線路架空線用設備.
  4. Hoop - stove chimney in the bao - steel incorporated company steel pipe factory regarded as the specifiable object the paper makes systemic studies including investigation and inspection of the reinforced concrete chimney and reliable assess method. some studies performed and results achieved mainly include : synthetical investigation method of the reinforced concrete chimney usage condition is put forward and real usage condition of the hoop - stove chimney in the bao - steel incorporated company steel pipe factory is handled by means of entirely investigation and inspection ; the mostly reason for impairment and defect of chimney locating in steel pipe factory hoop stove is revealed through result analysis of investigation and inspection ; to meet practical requirements that corporations manage industrial building all alone the paper presents condition appraisal method on reliability of the reinforced concrete chimney and assesses the reliability of hoop - stove chimney in the bao - steel incorporated company steel pipe factory

    論文以寶山鐵股份有限公司廠環形爐煙囪為具體對象,對煙囪的調查檢測和可靠性評定方法進行了系統研究,主要研究內容和成果包括:提出煙囪使用狀況的綜合調查方法,並對廠環形爐煙囪進行了全面調查和檢測,掌握了煙囪實際的使用狀況;通過對調查檢測結果的分析,揭示了廠環形爐煙囪損傷和缺陷的主要原因;針對我國企業內部對工業建築理的實際需要,提出煙囪結構可靠性的狀態評估方法,並廠環形爐煙囪的可靠性進行了評定。
  5. Spigot and socket self - stressed

    承插式自應力輸水
  6. Spigot and socket self - stressed reinforced concrete pipe used for water delivery

    承插式自應力輸水
  7. Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers

    涵洞雨水和污水道用預制箱形斷面的標準規范
  8. Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers metric

    涵洞雨水和污水道用預制箱形斷面的標準規范
  9. Finite element calculation of reinforced concrete breeches pipe in pushihe pumped - storage power station

    蒲石河抽水蓄能電站有限元計算
  10. Through the experiment research on practical damaged element, considering the effect of durability damage of steel corrosion and crack on structural element function. for the maintainment and transform plans " selection and prevention of heavy accidents the paper put forward abundant basis. it ' s perfection and development will provide basis for scientific management of active structure

    分析可知:銹蝕是造成結構承載力下降的根本原因,同時也找出結構耐久性影響的因素,為合理選擇大修改造方案,防止重大事故等方面提供充分依據,它的完善和發展將為現役結構的科學理提供依據。
  11. The riveting and welding plant of the company has a very strong technical force, the technical personnel makes up more than 1 3 of the total staff, the company can also undertake the manufacture of various metallurgical structural equipment, formwork, gang board, oil tank, water tank, pipeline and dust - collecting and environmental protection equipment of various sizes, the company also undertakes the construction of bridge, concrete building as well as underwater and high - altitude operations from omniberaing etc. no matter what sizes and shapes of the forging and casting spare parts including special - shaped parts, we will never refuse you and promise to satisfy you with best quality and finish the task on schedule

    公司鉚焊廠,技術力量十分雄厚,工程技術人員,佔全體員工的三分之一以上,可以承攬加工各種金屬結構設備模板跳板油罐水罐道工程各種型號除塵環保設備,再如橋梁建築,水下高空全方位作業等,除些之外,關于鑄造鍛造等工作不論大,中,小型部件,也能做到來而不拒,保證,保質,保量按期完成任務。
  12. Standard specification for nonreinforced concrete irrigation pipe with rubber gasket joints

    帶橡膠墊圈接頭的無灌溉水的標準規范
  13. Roll welding machine for stell bar skeleton of reinforced concrete pipe

    鋼筋混凝土管骨架滾焊機
  14. Roller suspension shaping machine of reinforced concrete pipe

    鋼筋混凝土管懸輥成型機
  15. Directions for transporting and storing of concrete pipes, reinforced concrete pipes, prestressed concrete pipes and fittings and concrete manhole shaft rings

    鋼筋混凝土管及預應力件和
  16. In order to ascertain stress behavior of steel lined reinforced concrete pipe accurately, according to the fundamental principle of non - linear computation of reinforced concrete elements, the steel lined reinforced concrete penstock on downstream dam surface in a hydropower station is calculated and analyzed, and the distribution of circumferential stress of the steel lined reinforced concrete pipe is obtained, it proves that it is safe and reasonable to use structures of steel lined reinforced concrete penstock in hydroelectric station construction, and can satisfy the requirement of project

    摘要為了能夠準確地把握鋼筋混凝土管的受力性能,根據單元非線性計算的基本原理,對某水電站壩後背進行了計算分析,得出了鋼筋混凝土管環向應力的分佈情況,分佈情況說明了此水電站採用壩後背的結構形式是安全合理的,可以滿足工程要求。
  17. Rubber gasket ring of prestressed and self - stressing concrete pipe

    預應力與自應力鋼筋混凝土管用橡膠密封圈
  18. Standard methods of testing rubber gasket ring of prestressed and self - stressing concrete pipe

    預應力與自應力鋼筋混凝土管用橡膠密封圈試驗方法
  19. Based on the characters of rccp ( reinforced concrete culvert pipe ) optimal design, it imports the design theory of discrete optimum design of structures, and more analysis has been taken on samples on this design theory

    並根據鋼筋混凝土管道優化設計的特點,引入了離散變量結構優化設計的設計理念,然後通過算例對此種設計思想進行了進一步的分析。
  20. Secondly, the dissertation summarizes the fundamental principle of finite element analysis on conduit subway, introduces the main calculation formula for finite element analysis, and then it develops reinforced concrete finite element calculation computer program which includes quadrilateral 8 nodes isoparametric element and one - dimensional 3 nodes isoparametric element

    2 、闡述了地下埋有限元分析的原理、方法和步驟,給出了有限元分析的主要計算公式,並編制了包含四邊形8結點等參單元和一維3結點等參單元的鋼筋混凝土管道有限元計算程序。