錨具 的英文怎麼說
中文拼音 [máojù]-
Anchorage, grip and coupler for prestressing tendons
預應力筋用錨具夾具和連接器As a new special bridge type, self - anchored suspension bridge has won more and more engineering ’ s favors with its beauteous build, economy performance and striving adaptability of geology and topography feathers. it has become a very competitive blue print of the urban bridge with the span from 100m to 400m
自錨式懸索橋作為一種特殊的橋型,以其結構造型美觀、經濟性能較好、對地形和地質狀況適應性強等優點,越來越受到工程界的青睞,成為城市裡100 - 400m跨徑范圍內極具競爭力的橋梁方案。Thermo protective aids, radar reflectors, rescue quoits, buoyant lines, dippers, sea anchors, oil cans, waterproof electric torches, paddles, oars, rowlocks, hatchets, brass hooks, lifeboat matches, life raft cradles, line throwing apparatus, hydrostatic release units, compasses, flares, and more.
保溫用具雷達反射器救生浮環浮索飲水罐海錨油箱水密電筒槳槳叉銅拖鉤手斧拋繩槍煙火信號防風火柴筏架靜水釋放器磁羅徑口哨Sheet metal anchorage with threads ; dimensions
螺紋式金屬板錨具.第1部分:尺寸Survey of anchor and chain gear
錨與錨具檢驗Development of the hanger of the monorail hoist runway on the ground coal road with the total bolt support
全錨支護的底煤巷單軌吊車道吊具的研製It s crustacean - crushing action, under the sea ! from brilliantly animated seashells, starfish and other marine life to anchors, treasure chests and explosive mines, aquaball is brimming with wet and wild breakout fun
在海底從漂亮的貝殼到過老的錨,從蠕動的海星到誘人的錢袋,每個可以敲擊的物件都非常的精美,各種道具和寶物更是充滿的創造性。However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum
但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、橋梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。Series of ym prestressing strand anchorage and coupler for highway bridge
公路橋梁預應力鋼鉸線用ym錨具連接器規格系列Protection against falls from a height. anchor devices. requirements and testing
防止從高處跌落的個人防護設備.錨具裝置.要求和試驗Technical specification for application of anchorage, grip and coupler for prestressing tendons
預應力筋用錨具夾具和連接器應用技術規程Technical specification for application of anchor, pincerand and bonder used for prestressing steel bar
預應力筋用錨具夾具和連接器應用技術規程Test method and inspect rules of prestressing strand anchorage and coupler for highway bridge
公路橋梁預應力鋼鉸線用ym錨具連接器試驗方法及檢驗規則Depend on the advantage of military industry, it has been a professional company which could research, develop, design and machining pre - stress cable anchor, bolt and other machine
藉助軍工優勢成為一家集科研設計加工預應力錨索錨具和機具的專業企業。In this paper, the stubble, rust of tie bars and destruction forms of anchorage device are considered equivalent to the loss of tie bars ’ sections which is the analysis parameter of this paper
本文將系桿的斷絲、銹蝕及錨具等破壞形式等效為系桿截面的損失。( 1 ) based on the experiments, this thesis discusses the stress loss of vertical prestress caused by deformation of anchorage, the resilience of the tendon and the joint compression ( l2 ), the elastic compression of the concrete ( l4 ) and the relaxation of the tendon ( l5 ). it is concluded that the anchorage deformation is dominated in vertical stress loss. measures are suggested to diminish the loss of the vertical prestress during the design and construction of the bridge
( 1 )本文在試驗的基礎上,研究了豎向預應力筋的錨具變形、鋼筋回縮和接縫壓縮損失l2 、混凝土的彈性壓縮損失l4和力筋的應力鬆弛損失l5 ,其中,第一項是最主要的損失,論文據此對設計和施工中如何減小豎向預應力的損失提出了自己的看法和建議。Because of the former anchorage systems designed according to matching 1860mpa strength strands in the beginning of 90 ", they can not be suitable any more for the super strength strands with 2000mpa. therefore, some accidents occurred such as strands sliding and broken when tensioning. in addition, the advantages of the new materials as their high mechanics performance are not be used completely as the prestressing structures was designed as per the 1860mpa strands, which will result in the waste of materials, in view of the above - mentioned facts, by means of analyzing the development of anchorage systems home and abroad, in connection with the characteristics of the super strength strands ( 2000mpa ), this topic made a research on hvm15 anchorages by theoretical calculation and finite element analysis, and also on the manufacturing process and test
隨著預應力技術的發展和冶金工業冶煉技術的不斷進步,預應力鋼絞線的強度不斷提高,由原來1470mpa提高到1860mpa , 90年代末期已出現了2000mpa超高強鋼絞線,而原來的是在90年代初期按抗拉強度為1860mpa的鋼絞線標準設計的,因此,原有的錨具已不能適應現有超高強度2000mpa的鋼絞線強度要求,在工程中出現了斷絲滑移現象,同時,在使用和設計時仍按1860mpa鋼絞線的指標進行設計應用,沒能充分發揮材料的力學性能,造成材料浪費。Prestressed bar, anchorage device, construction and cost of civil engineering, evaluation, design, testing, addident analysis of pc structure, mould and reinforcement technology
土建類預應力鋼材、錨具、設備、施工與造價;預應力結構評估、工程設計、現場測試與事故分析;模板鋼筋技術。Products are : super high pressure electric, pneumatic, manual oil pump ; pre - stress jack for the use of coal mine and construction ; steel bar and cable scissor ; all kinds of bolt for safety supporting and bolting ( km19 and km22 bolt have all got the certificate of “ ma ” in china. ) ; cable anchor and bolt test stand ; hydraulic nut scissor and etc
產品有防爆式超高壓電動、風動、手動油泵;煤礦、建築用預應力張拉千斤頂;鋼筋、鋼絞線切斷器;安全支護用各種錨具( km19 、 km22錨具在國內率先取得煤安證書) ;錨索錨具靜載拉伸試驗臺;液壓螺母破切器等。The inferior anchor - ties is short, compared to the design request, the actual elongation value has increased 6 %, its reason is that the anchor end in to shrink the quantity had neglected locks the loss absolutely oversized, through adjusted the anchorage, this problem has solved effectively
次錨束較短,實測伸長值超過了設計要求的6 % ,其原因是忽略錨固端的內縮量;絕對鎖定損失過大,通過調整錨具,有效地解決了該問題。分享友人