錨固索 的英文怎麼說

中文拼音 [máosuǒ]
錨固索 英文
anchoringwire
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  1. The cable is then tensioned and anchored at the ends.

    然後將鋼張拉並於端頭處。
  2. Study on distribution and diffusion regularity of frictional resistance in the inter face of grouted body of anchor cable

    段摩阻力分佈及擴散規律研究
  3. End fastenings for anchor chain cables on board ships - part 1 : assembly

    船舶上的端部緊.第1部分:組裝
  4. Brownjohn j m, pin - qi xia. dynamic assessment of curved cable - stayed bridge by model updating. asce, journal of structural engineering, vol. 126 no. 2 february, 2000

    朱玉,王宜均,楊耀銓等.鄂黃長江大橋塔區預應力布束方式分析. 2000年全國橋梁學術會議文集
  5. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應力的結構、作用及其在滑坡防治中的應用進行了詳細的分析;基於施工現場的地質條件,對力及最佳段長度進行了理論計算;制定了實驗研究方案,進行了前期實驗、現場標定實驗、實地張拉實驗;對兩組結構型式的十組鋼絞線內應力及總張拉力的實驗數據進行了研究,提出了提高預應力性能的措施,以及具體的施工方案和施工工藝。
  6. In the excavating process of the left bank, such methods as concrete embolism, consolidation grouting > cable strengthening and bailing shoud be used when the fault f5 is round. on the right bank, the system anchorage and bailing methods shoud be used. it is surgested that the prestressed cable shoud be used to deal with the deterministic blocks. and the prestressed anchor to the undeterministic blocks

    左岸拱肩槽邊坡在開挖施工至斷層f5附近時,要使用混凝土栓塞、結灌漿、及排水等措施以防止巖體失穩。右岸拱肩槽邊坡開挖過程中要採取系統及排水防滲等措施,以防止個別潛在不穩定的邊坡失穩。
  7. On - site tests are taken as the main research way in this paper, in which total three trail anchors are installed, each consisted of two units with 4m fixed lengths

    本文以現場試驗為主要研究手段,試驗數量為三根,由兩級單元組成,單元段長度為4m 。
  8. This paper introduces the typical problems which appear on the cable installment, anchor installment, supporting and slide device and foundation of landscape saspension bridge

    摘要介紹橋的纜裝置、裝置、支承和滑動裝置、基礎等部位出現的典型問題。
  9. According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis

    根據掛籃前端牽點處的變形協調條件建立了掛籃上混凝土澆築過程中牽力的增加量,並推導了掛籃上混凝土澆築過程中的各主要工況下掛籃前端標高的計算公式,對文暉大橋掛籃上混凝土澆築過程中的牽力和掛籃前端標高進行了細致地控制,確保了混凝土澆築的順利進行,為整個主梁線形和力的雙控打下了良好的基礎。
  10. Basic tests on the prestressing force anchor of a high slope project

    路塹高邊坡工程預應力基本試驗
  11. Research on anchoring and shearing effect of anchoring cable

    對結構面的抗剪效應研究
  12. The shantou bay suspension bridge is the first mordern suspension bridge in china its substructures are mainly towers and anchorages this paper presents some of the key techniques of the substructures construction , including the cable anchorage system setup , the hydrated heat control in the anchorage , construction of the foundation and bearing plate of the tower in the ocean , the control of tower construction , etc

    汕頭海灣大橋是我國第一座現代懸橋下部結構主要包括塔和碇本文介紹了該橋下部結構施工的一些關鍵技術環節,包括主纜系統的安裝,大體積混凝土的溫控防裂,主塔基礎和承臺的海上施工,塔柱滑模施工控制等
  13. Calculating method of landslides drive force, and determination of the diameters of borehole and anchor cable, the number of the anchor cables, the anchorage length and types of the anchor head as well are also discussed

    本文還探討了作用在抗滑樁上的滑坡推力設計值的計算方法,以及材料的選定、深度計算、頭類型選擇、與樁的連接設計、施工工藝與質量控制措施、檢測與監測等等。
  14. According to the special stratum condition 、 soil parameter 、 pile frame system in the protecting landslide of hongtian jianfeng in yongan city in fujian province, compile a fem program of plane strain and analyze the interaction by nonlinear fem on intensity discount. in the program, duncan - chang model is applied to earth, elasticity model is applied to pile and rock ; goodman element is set between pile and rock - earth and applied to simulate sliding plane and flexible floor ; sequential pole elements with original stress are applied to anchor cable

    在程序中土體採用了duncan - chang雙曲線本構模型,樁和層以下的巖體採用了線彈性本構模型,並且在樁和巖土體間設置了無厚度的古德曼( goodman )單元,對于軟弱夾層和已知的滑裂面也採用古德曼單元模擬,採用的是具有初始應力的連續桿單元模擬。
  15. The vortex - excited oscillation, wake galloping, rain - wind vibration and buffetting are the main cause of the fatigue in the vicinity of the anchorages on cables of cable stayed bridges

    渦激振、風雨振、尾流馳振、抖振等風致振動容易造成斜拉橋拉端疲勞,促使銹蝕加快,嚴重影響拉的使用壽命。
  16. Analysis of stress at anchorage zone of self - anchored concrete suspension bridge

    混凝土自式懸區應力分析
  17. On the basis of the important research project of the ministry of communications - the prevent and study of slope disaster in the project of beijing - zhuhai highway, the thesis developed the structure ' s design theory. in order to design more reasonable, the thesis propose the cohesion shear stress is unequal distribute at the anchorage zone. and it can be divided into two parts, the front function is uniform and the behind is exponential

    為了合理的進行工程設計,本文按彈塑性理論對預應力段的黏結剪應力進行了分析,將段劃分為塑性變形區段和彈性受力區段兩部分,認為段黏結剪應力為非均勻分佈,前段剪應力為均勻折減應力,後段剪應力為寸旨數變化應力,由此提出了相應的段長度計算公式。
  18. Fatigue test of tensile anchor plates in cable - beam anchorage zones for zhanjiang gulf bridge

    湛江海灣大橋拉板式區疲勞試驗
  19. Stress response of the tower wall at the least favorable section of all of the single section on the cable tower anchor segments of the cable - stayed bridge was studied under the annular pre - stress with cable force and tensile force by comparing the experiment results of the full - scale model of segment with the results of the finite element simulation analysis according to the forced status of the cable tower under practical conditions

    摘要通過區節段足尺模型試驗結果和有限元模擬分析比較,結合塔受力的實際工況,對異型截面斜拉橋區節段最不利斷面在環向預應力與力共同作用下塔壁的應力響應進行了研究。
  20. As the main method of measurement in the tests, some strain measuring points are arranged on the reinforced steel bars of the anchor bearing body. the changes of strain with different loading levels at their locations have been measured, through which range of influence and distribution of strain with loading in grout can be investigated, and corresponding distributions of axial force and bond stress are calculated according to hooke ' s law. making use of nonlinear curve fitting, distribution equation of bond stress of the fixed unit anchor length is achieved

    試驗測試手段通過在承載體上布設應變測點,觀測在不同的荷載級別下的應變變化情況,對不同荷載級別下,單元注漿體內應變的影響范圍及分佈規律展開分析,依據虎克定律計算出了其軸力與粘結應力的分佈;並對測試結果進行了擬合,得出了段粘結應力分佈的擬合方程。
分享友人