錨地浮 的英文怎麼說
中文拼音 [máodefú]
錨地浮
英文
anchorage buoy-
30 shifting from anchorage to pier / buoy no. 13
19點30分從錨地移泊到13號碼頭/浮筒。However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum
但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、橋梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。Having spent every night in different hotels for the last eight months, i have become adrift, like a ship with no anchor, or a kite with no string
過去這8個月來,每天睡在不同的飯店,我的生活變得漂浮不定,像一艘失去錨的船、斷了線的風箏;沒有東西抓得住我、也沒有可以休憩、倚靠的地方。Phytoplankton community in yantai harbor, yantai anchorage and entry ship ' s ballast water, china
煙臺港和鄰近錨地及其入境船舶壓艙水中的浮游植物Guangzhou port group possesses 50 berths, 13 buoys and 23 anchorages each of 10, 000 tonnage - class and the largest capacity to be 300, 000 tons
廣州港集團現有萬噸級以上泊位50個;萬噸級以上裝卸作業浮筒13個;萬噸級裝卸錨地23個(其中最大錨泊能力30萬噸) 。Guangzhou port group possesses 46 berths, 13 buoys and 23 anchorages each of 10, 000 tonnage - class and the largest capacity to be 300, 000 tons
廣州港集團現有萬噸級以上泊位46個;萬噸級以上裝卸作業浮筒13個;萬噸級裝卸錨地23個(其中最大錨泊能力30萬噸) 。分享友人