錨定系統 的英文怎麼說

中文拼音 [máodìngtǒng]
錨定系統 英文
anchor system
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. They include the ship kelvin wave pattern and wave resistance, the interaction of surface waves with floating bodies, the seakeeping of ships high - speed vessels and offshore platforms, the evaluation of the drift forces and other nonlinear wave effects responsible for the slow - drift responses of compliant offshore platforms and their mooring systems designed for hydrocarbon recovery from large water depths

    這包含了船波和波的阻抗、波和浮體的交互作用、高速行駛船舶與近岸結構物之耐海性、拖曳力評估及其他造成順應式近岸結構物緩慢飄移現象的非線性效應,與結構物設計于深海中以重獲碳氫化合物之錨定系統
  2. Our product range covers drilling and demolition, direct fastening, diamond and anchoring systems, firestop and foam systems, installation, measuring and screw fastening systems as well as cutting and sanding systems

    我們的產品范圍涵蓋鉆孔與鑿破、直接固、鉆石與安卡、防火與發泡填縫、安裝、位與螺絲固,以及切割與砂磨
  3. In this thesis, the technological way that prevent the anchorage pile and the concrete of anti - force beam from crazing, and the technological application of ultrasonic determine apparatus to detecting are introduced during engineering of trial pile by inducting prestressed technology to anchorage pile and anti - force frame

    論文還介紹了在試驗樁工程中,通過預應力技術引入樁及反力梁,防止樁和反力梁混凝土開裂的技術途徑,和超聲波側壁測儀檢測技術的應用。
  4. In the excavating process of the left bank, such methods as concrete embolism, consolidation grouting > cable strengthening and bailing shoud be used when the fault f5 is round. on the right bank, the system anchorage and bailing methods shoud be used. it is surgested that the prestressed cable shoud be used to deal with the deterministic blocks. and the prestressed anchor to the undeterministic blocks

    左岸拱肩槽邊坡在開挖施工至斷層f5附近時,要使用混凝土栓塞、固結灌漿、索加固及排水等措施以防止巖體失穩。右岸拱肩槽邊坡開挖過程中要採取固及排水防滲等措施,以防止個別潛在不穩的邊坡失穩。
  5. Thus, the aim of this article is to highlight a new lomas bone screw derived from the original omas system, including several improvements upon the material, design and insertion technique, so that orthodontists can benefit from applying such kind of screw while dealing with clinical anchorage situations

    因此本文主要的目的就在介紹一種新的lomas矯正骨釘為原本omas矯正骨釘的改良,主要集中在材質、設計與植入方式的改革,便利未來矯正醫師在使用骨釘作為時更加得心應手。
  6. The force control of suspension bridge anchorage cable is the main contents which will be researched. according to the character of suspen - sion bridge anchorage, three questions is solved in this paper on the basis of the construction control experience of the highway bridge of yichang yanzhi river. firstly, an effective method of cable force control is presented in this paper, which has settled the puzzle of cable force accurate operate through fixing a pressure transducer at the behind of the hydraulic jack. secondly, an exactitude calculation model is founded in this paper. in addition the influence of boundary condition, sag, inclination, flexural rigidity and environment temperature to the cable vibration frequency which make the frequency method could be used to the measurement of cable force. in the end of this paper, a control system of anchorage cable force is developed on the basis of the above research. this system is very steady, credible, high precision and convenient. it is a new and credible method to be used to the force control of sus - pension bridge anchorage cable. in this paper, the conundrum of cable force control has been solved. the fruits are very useful to the development of inland suspension bridge

    提出了一種有效可行的跨張力控制方法,即通過在油壓千斤頂后加壓力傳感器,並利用單片機技術進行數據採集,解決了懸索橋跨索股初張力精確控制的難題;建立了跨索股索力的精確計算模型,分析了索股的邊界條件、斜度、垂度、抗彎剛度及環境溫度對索股頻率的影響,解決了弦振法在大跨徑懸索橋索力測試中的應用問題;在上述研究成果的基礎上,研製出了跨張力控制,該具有穩可靠,精度高,使用方便等特點,它的投入使用將為我國今後大跨徑懸索橋跨張力控制提供一種全新的、可靠的手段。
  7. ( 2 ) for consolidation of the grottoes ’ slope, there ’ s no mature theory and technique. in this paper the back analysis of shear strength of the rock slope at yulin grottoes is presented. through the back analysis of shear strength, we can presents a procedure for the design of consolidation of the yulin grottoes in anxi. it is very important in the field of reinforcing the slope of grottoes

    ( 2 )目前對于石窟邊坡的索加固研究尚無的理論和方法,本文以安西榆林石窟為例,提出了一種通過反演( c , )值來設計加固石窟邊坡的方法。對于在未知巖體的抗剪強度( c , )值的條件下來設計加固石窟邊坡,該方法的提出具有一的理論意義和應用價值。
  8. In development of deep foundation engineering, it is necessary introduce information construction method into the deep foundation engineering, for reducing the pit trouble. the information construction method is a kind of moderon construcion management way to make use of system engineering, includes the informationg acquisition back coupling, back analysis, control and decision. the research is for example runyang changjiang river highway bridege, expounds the method how to apply the information construction method into the practice engineering, at the same time, discussing some the factor of influcing the deep foundation stability how to influce the deep foundation ' s stability. form the research, we have some following results : 1. in construction process of super and deep pit, super pore water pressure creation has related to outside load, soil layer conditions, and underground water level

    在深基坑工程建設迅速發展的同時,為了減少基坑事故的發生,需要將信息化施工這一理念引進到基坑工程的施工過程中,信息化施工是運用工程施工的一種現代化施工管理辦法,包括信息採集(監測) 、反饋、反分析(預測) 、控制與決策等幾方面的內容,本文以在建的潤揚長江大橋北錠深基坑工程為例,的闡述了這一施工理念在實際工程的具體應用過程,並通過這一應用過程探討影響基坑工程安全穩的相關因素對基坑的影響程度。
  9. This thesis aims to analyze how to select and assign prestressed tendon, how to design anchorage bearing joint, how to control the crack, how to calculate the axial prestressed force and the third moment and how to design the edge column of top layer. on the base of the research in and out our country and construction of the prestressed structure, some helpful conclusion and suggestion are presented, which is suggestive for the design and construction of long span continuous prestressed concrete frame

    本文將綜合設計與施工兩個方面,對預應力筋的選用、布置,固區的設計及構造處理,裂縫問題,側向約束對梁軸向預壓應力及柱中第三彎矩的影響,頂層大跨邊柱設計等幾個問題進行的分析研究,並在國內外研究和大量工程實踐的基礎上,提出了一些建議和預防措施,對此類工程設計和施工有一的參考價值。
  10. The flexible retaining structure is another important retaining structure in soft soil. the integrated numerical analysis of this retaining structure ( including the methods and theory of calculating active earth pressure under sorts of conditions as well as the calculating method of horizontal stiffness coefficient of bracing structure and the method of deciding boundary condition etc. ) was gived. the effect of all parameters on the characteristics of retaining structure was discussed using methods of sensitivity - analysis

    本文針對目前常用的彈性支點法,給出了完整的數值分析方法,包括各種條件下的墻後土壓力的計算方法和原理、支撐(或)水平剛度數的計算、邊界條件的確方法等,並以此為基礎採用靈敏度數分析方法討論了各參數對圍護結構形態的影響,指出土體側向基床比例數是影響圍護結構變形的最主要的參數。
  11. This chakra has multiple energy components and moves around the field in a complex system of rotation to keep soul anchored in the center of the form and field or subtle bodies

    這一脈輪具有多個構成部分,以一個復雜的旋轉繞能量場旋轉,從而將靈魂保持在身體、能量場或精微體的中心。
  12. The designing principles were discussed. the calculation relating to the constructional type, frame, body, floating and gravitational forces, anchoring system and etc. was studied

    摘要本文論述了鐵木結構網箱的設計原理,提出了網箱結構型式、框架、箱體、浮沉力、錨定系統等的設計與計算方法。
  13. The behind schedule theories research obstructs the ccsn ' s further development. on the soil nailing and compound soil nailing research foundation, according to ccsn present research condition and the engineering effective demand, the stability of ccsn is studied systematically by methods of theories research, orthogonal experiment research and case research. some beneficial results of the ccsn ' s mechanism and behaviors are gotten and the analysis model and method of ccsn ' s stability are established

    在前人對土釘及復合土釘研究基礎上,根據目前管樁復合土釘支護的研究現狀和工程實際需要,採用理論研究、正交試驗研究、工程實例研究相結合的方法,對管樁復合土釘支護穩性進行了全面的分析和研究,得到了管樁復合土釘支護機理及性狀的一些有益成果,建立了管樁復合土釘支護穩性分析模型與方法。
  14. On the foundation analyzing and studying the kinetics and dynamics of underwater dragging system and anchor cable system, this paper sets up the three dimension mathematic model about spatial shape and tension of the underwater cable and about spatial shape and tension of the anchor cable in the ocean current. this paper presents the analysis method about the stability when the underwater dragging system or the anchor cable system is in the pulse current

    文中在分析研究水下拖曳與運動學與動力學的基礎上,建立了水下拖索空間形狀和張力的三維數學模型以及海流作用下索空間形狀和張力的三維數學模型,並給出了水下拖索在脈沖海流作用下穩性的分析方法。
  15. To calculate the distribution of the director of super twisted nematic liquid crystal cell with strong and weak anchoring respectively under electric field

    分別對強和弱超扭曲向列相液晶盒,在外加電場作用下,求出了它們指向矢傾角分佈曲線。
  16. At last, the analysis of the redistribution of the initial crust stress and the distribution of the plastic area is made ; the stability evaluation of the rock mass around the cavern is provided. the outcome is conformed with the reality. then applys the approximately equivalent dissolved rule, and considers the action of anchor staff to consolidate the rock mass, and correspond model is established, nonlinear finite element m ethod is applied to analyze the effect of the supports, the result shows that the action of anchor staff is obvious and deformation and stress state of the rock mass is greatly approved. so, the result conforms that the idea and the means used in the thesis is applicable

    最後運用非線性有限元對廠房開挖后圍巖的應力重分佈和塑性開展區的分佈作了分析,評價了廠房的圍巖穩性,其結果與實際開挖情況基本吻合,針對圍巖穩性評價的結果,提出了固方案,運用等效概化原理考慮桿的作用,建立了採用桿加固后的地下廠房圍巖的三維彈塑性模型,運用非線性有限元分析了加固效果,結果表明固作用明顯,圍巖變形明顯減小,圍巖內的應力狀態大為改善,從而驗證了本文所採用的研究思想和方法是切實可行性的。
  17. 5. as an example of application, we propose a feasible experimental plan for measurement of anchoring strength by means of non - symmetric cell. this method can decrease the error obviously

    作為本文的應用,提出了一種利用不對稱液晶盒對強度進行測量的方法,這種方法,可以明顯的減小測量的誤差。
  18. We think the value of anchoring strength and the sign of modified parameter of anchoring energy should not be regarded as determinant when we distinguish between the first order transition and the second one, otherwise we also explain the accurate condition of first order transition in non - symmetric cell and point out the essence of it

    討論了飽和點的一級轉變問題,驗證上、下基板強度相同的液晶盒的一級轉變條件同樣適合不對稱盒,通過實例證明強度的大小及能修正數的正負不能作為區分一級或二級轉變的參考條件。
  19. Based on observing several engineering practices, an assumption is put forward that there are unloading arches in the soil between the piles. in order to research the effect of soil arch, the author designs an indoor model and analyzes the result of the exam

    本文通過幾個工程實踐所表現出來的與傳認識相悖的現象,指出了傳認識在實踐面前站不住腳,給出樁立柱間土體存在卸荷拱的假
分享友人