錨底座 的英文怎麼說

中文拼音 [máodezuò]
錨底座 英文
anchor base
  • : 名詞(鐵制的停船設備) anchor
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  1. Each leg has three holes on the bottom for anchoring to the floor or base plate

    每個支柱部都有三個孔,用於固在地面或上。
  2. The two models of rigid and elastic piles have been discussed respectively, in which the anchor cable will be regarded as an elastic hinge. under the consideration of deformation harmony of anchor cable with piles bodies and pile bottom conditions, the solutions of the internal forces distribution along piles bodies are presented

    本文分別按剛性樁和彈性樁兩種物理模式,將索視為彈性絞支,利用抗滑樁和索位移變形協調條件,計算出不同樁條件下抗滑樁的內力分佈。
  3. Based on the analysis of problems of previous bridge bearings after installation, for installation of the bearings of lhasa river bridge, the construction method of grouting epoxy resin mortar into anchor bolt holes of a bearing with the aid of potential energy of base plates of the bearing is used

    摘要結合分析以往橋梁支施工后留下的隱患,拉薩河特大橋支採用栓孔灌注環氧樹脂砂漿,板位能壓漿的安裝方法。
  4. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推力計算結果和本滑坡屬牽引式滑坡的特點,滑坡體上部相對較穩定,中下部處于基本穩定或不穩定狀態,因此建議此滑坡治理採用上部削坡減載與拉抗滑樁、擋墻進行支擋結合的處理方法,同時結合截排水等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基界層及分佈特點和分析,將本工程危巖體失穩崩塌的方式歸納為墜落式、傾倒式和滑塌式三種類型並分別提出相應的穩定性計算方法; ( 6 )分別對本工程中的危巖體進行了穩定性計算,並且發現其都處于不穩定狀態,因此根據實際情況分別提出相應襯砌支撐和清理等加固治理措施,最後還對加固后的危巖體進行了校核計算,滿足要求。
分享友人