錨架 的英文怎麼說

中文拼音 [máojià]
錨架 英文
anchor bolster
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  1. If viaduct approach spans are considered then perhaps the approach piers could be used to anchor the backstays.

    如果設計中考慮高引橋,則引橋的橋墩可用來定后拉索。
  2. Practice of the timbering of composite top - tray drift anchored cable ret cord

    索在7518切眼支護中的應用
  3. Thermo protective aids, radar reflectors, rescue quoits, buoyant lines, dippers, sea anchors, oil cans, waterproof electric torches, paddles, oars, rowlocks, hatchets, brass hooks, lifeboat matches, life raft cradles, line throwing apparatus, hydrostatic release units, compasses, flares, and more.

    保溫用具雷達反射器救生浮環浮索飲水罐海油箱水密電筒槳槳叉銅拖鉤手斧拋繩槍煙火信號防風火柴筏靜水釋放器磁羅徑口哨
  4. Stability calculation methods for grillage supporting structure with prestressed anchor and its application

    預應力桿邊坡支護結構穩定性計算方法及其應用
  5. Results as following : in the east china sea and the yellow sea, zooplankton showed higher diversity in the low latitude and warm species occurred mainly in the south of 31 n, five communities were distinguished by twinspan method, based on data of species composition and environmental factors. they are : i ) yellow sea neritic community ( f ) with indicator species of labidocera euchaeta in autumn and centropages mcmurrichi in spring ; ii ) yellow sea central community ( hc ) with indicator species of themisto gracilipes, calanus sinicus and euphausia pacifica, the latter two species occurred only in autumn ; iii ) east china sea continental shelf mixed water community ( k ) with indicator species such as rhincalanus cornutus and pterosagitta draco which were confined in waters with high temperature and salinity, iv ) yellow sea and east china sea mixed water community ( he ) and v ) east china sea inshore mixed water community ( m )

    根據twinspan等多元分析結果,比較各組群的浮遊動物種類組成和環境特徵,可將東、黃海浮遊動物群落分為5個,黃海沿岸群落( f ) ,指示種秋季為真刺唇角水蚤,春季為墨氏胸刺水蚤;黃海中部群落( hc ) ,指示種以細長腳蟲戎為主,秋季還有中華哲水蚤和太平洋磷蝦;東海外陸高溫高鹽群落( k ) ,指示種為角哲水蚤、飛龍翼箭蟲等多種狹布型暖水種類;黃東海交匯區群落( he )和東海近岸混合群落( m ) ,兩群落包含多種生態類型種類,其中溫帶近岸低鹽種在he中較多,廣布性暖水種在m群落中較多。
  6. The design of hoisting cableway in wudang mountain xuan regnal palace according to the characteristic and requirements of cableway design in the view and in line with the principle of advanced technology, reasonable economy, safety and appliance, includes the general arrangement of cableways, calculation of skyline and wookline, checking computation of the support and the anchorage, productivity calculation

    摘要根據景區空索道設計的特點及要求,本著技術先進、經濟合理、安全適用的原則,對武當山南巖宮玄帝殿吊裝索道進行設計,包括索道總體布置、承載索與工作索設計、支碇的驗算,並進行生產率的計算。
  7. A special steel spreader beam was used to erect the fabricated cage in its proper position in the roadway structure.

    使用一個特製的鋼托來安裝預制的固橫梁的鋼筋骨,使其就位於上部結構內預定的位置上。
  8. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  9. She was stirred by this thought, angered by that - her own injustice, hurstwood s, drouet s, their respective qualities of kindness and favour, the threat of the world outside, in which she had failed once before, the impossibility of this state inside, where the chambers were no longer justly hers, the effect of the argument upon her nerves, all combined to make her a mass of jangling fibres - an anchorless, storm - beaten little craft which could do absolutely nothing but drift

    她想到出外謀生的艱難-她已經失敗過一次了。她又想到不可能再留在這里了,她已經沒有資格住在這些房間里了。這些思緒再加上吵給神經帶來的壓力,使她的思想就像一團亂麻,理不出個頭緒來-一條沒有的小船受風雨的擺布,除了隨波逐流,無能為力。
  10. Taking shizishan landslide control in lueyang country as an example, the whole design process of lattice frame anchor structure are studied

    摘要結合略陽縣城獅子山滑坡的治理,討論了格構式桿框結構治理鬆散堆積體滑坡設計的全過程。
  11. Secondly, by making use of the features of lattice frame anchor structure which can protect slope and retain stability of landslide together with its small space between beams and light anchor, the calculation model and formulas of slope force are dealt with and the design process of lattice beam and pillar as well as anchor and plate are introduced carefully

    利用格構式桿框結構所採用的小間距、小噸位桿及連續格構樑柱,從而使格構樑柱受力較均勻,適合鬆散堆積體滑坡治理的需要,即同時滿足深層抗滑和淺層護坡。
  12. Research on lateral pressure in truss rod for support of loose roof

    拉支支護散體頂板時拉桿的橫向受力研究
  13. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充填、體澆築、主纜設、箱梁吊裝、橋面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  14. Citing five - meter - high nanfei river rubber dam in hefei, one of the highest double - anchor water rubber dam in china as an example, while deeply analyzing some representative rubber dam projects in china, the article theoretically exploits the relationships among some technical parameters such as anti - pull intensity, internal pressure ratio, circum - oriented relative extending rate, etc. also has the author brought up his own opinion on rubber dam design & calculation theory, which is of high theoretical and applicative value for parameter optimization and combination of water rubber dam with a height of above 3. 5 meters. it also helps when building over - five - meter - high rubber dam using seamless rubber dam and rubber dam with steel wire as its frame. this article also exploits safety measures for designing & building rubber dam in navigation areas

    本文以充水式雙固橡膠壩目前國內最高(壩高5m )之一的合肥市南淝河橡膠壩工程為例,並在對全國目前已建橡膠壩代表工程進行深入分析的基礎上,對壩袋的抗拉強度、內壓比、環向相對伸長率等技術參數之間的關系進行了理論探討和研究,並對橡膠壩設計計算理論提出了自己的見解和看法,對指導設計壩高3 . 5m以上的充水式橡膠壩技術參數的優化組合具有重要的理論和應用價值,特別對應用無搭接縫橡膠壩、鋼絲網骨橡膠壩建造壩高大於5m的橡膠壩具有指導意義。
  15. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸索橋的施工控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了施工計算,提出本文關于懸索橋的主纜無應力長度控制、索鞍預偏量控制、跨張力控制、絲股設控制、索夾安裝位置與吊索長度控制的方法;介紹了吊梁階段鞍座頂推量的確定與控制方法,分析了施工階段懸索橋的線形變化過程。
  16. Diesel engine, main turbine, generator turbine, main boiler, diesel generators, deck crane, deck machineries, propeller, controllable pitch propeller, switchboard, engine control console, fire extinguishing system, inert gas system, aux. boiler, oil purifier, navigation equipment, life boat, anti rolling system, hatch cover, compressor, fin stabilizers, valves, anchor, chain and scaffolding, control system for lng carrier and various machinery for lng carrier

    主機柴油機,液化氣船主機透平鍋爐貨油泵,機艙泵,發電機,甲板吊機,甲板機械,螺施槳, cpp ,配電盤,主機遙控,消防沒備, igs ,輔鍋爐,分油機,航海儀器,救身艇,減搖裝置,艙口蓋,空壓機,減搖鰭,閥門,鏈,船舶腳手,液化氣船控制系統,液化氣船用各種沒備
  17. Application of cable anchor and steel truss support in jinjia mine

    索鋼桁支護在金佳礦的應用
  18. The new development of supporting skills in mine construction

    桿與組合支護
  19. Finally, the thesis primarily sets up the internal force model of the supporting structure system in the bi - arch tunnel, namely, the distribution model of the surrounding rock ' s pressure, the internal force model of the steel framework and the axial force model of the anchor bolt, and these results can have the guiding significance to the design and construction of the similar tunnel engineering

    最後,結合有限元的理論計算及現場實測數據的分析,初步建立了雙連拱隧道支護結構體系的內力模型,即:圍巖土壓力模型、初期支護鋼拱內力(主要為軸力和彎矩)模型以及桿軸力模型。充分理解和闡述了構件的工作狀態,對今後類似隧道工程的設計和施工具有一定的指導意義。
  20. Therefore, behavioral corporate finance is created. behavioral corporate finance can give much better explanation to those “ strange phenomenon ” from the angle of psychology and sociology. but the present theories of behavioral corporate finance mainly focus on the research of investors ’ behavior and the research of managers ’ behavior is not enough

    現代心理學對這一問題給出了答案:人在很多時候是非理性的,其非理性主要有五種表現方式:過度自信、損失厭惡、框效應、定效應及確認偏差。
分享友人