錨桿靜壓樁 的英文怎麼說

中文拼音 [máogǎnjìngzhuāng]
錨桿靜壓樁 英文
pressed pile by anchor rod
  • : 名詞(鐵制的停船設備) anchor
  • : 桿名詞(桿子) pole; staff
  • : Ⅰ形容詞1. (安定不動; 平靜) still; calm; motionless 2. (沒有聲響; 清靜) silent; quiet Ⅱ名詞(姓氏) a surname
  • : 壓構詞成分。
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  1. Calculating method of anchor jacked pile while sinking

    錨桿靜壓樁擠土效應的計算
  2. Working mechanics and applications of anchor static jacked pile

    錨桿靜壓樁工作機理及應用
  3. The application of the bolt static steel tube pile in the treatment of high - rise buildings ' pile accidents

    鋼管在高層建築基事故處理中的應用
  4. Application of the anchorage static compression pile

    錨桿靜壓樁的應用
  5. Application of anchoring pole static pressing pile in treatment of engineering pile with defect

    錨桿靜壓樁對處理工程有缺陷時加固的應用
  6. This thesis in the paper will play a great role in popularizing anchor jacked pile. in this paper, the research of anchor jacked pile is still in its elementary phase, more work should be done to improve it in the future so as to guide the practical engineering

    本文的課題對錨桿靜壓樁的推廣使用具有很大的意義和工程實用價值,但本文對該課題的研究仍處于初級階段,今後需要做更多的工作去完善它,使它能夠對工程真正具有指導意義。
  7. This paper respectively uses the method of expansion of cavity and fem to analysis the soil compaction effect of anchor jacked pile while sinking, and compares the calculation result of the two methods by combining effect is valuable to the application of engineering

    摘要分別用柱形孔擴張法和有限元方法對錨桿靜壓樁過程中的擠土效應進行了分析,並結合工程實例對兩種方法計算的結果進行了比較,很好地探討了沉擠土規律,具有一定的工程實用價值。
  8. Anchor jacked pile is a new technique researched by ourselves for building reinforce and has some strongpoint others have not. twenty years " popularization makes this technique widely used. now anchor jacked pile can be applied in some other project such as correction, ground strengthening, pile foundation ' s top - down construction in newly built building

    錨桿靜壓樁作為我國自行研製的一種地基托換加固新技術,有著其它施工方法所不具有的自身的優點,經過二十年的推廣使用,目前在很多地區已經廣泛使用,而且其適用范圍也從以前的單一的托換加固作用發展成可用於糾偏、補強加固、新建工程逆作法基施工等工程。
  9. Elastic - plastic analysis for soil around anchor jacked pile in this paper, the course of penetration is regarded as expansion of cylindrical cavity in infinite soil mass. combining with the knowledge of elastic mechanics and plastic mechanics, we can make analysis for soil around pile. finally, we can educe the cylindrical cavity pressure, radius of plastic zone, radical displacement in elastic zone, excess pore water pressure in soil around pile and spherical cavity pressure at the end of pile

    錨桿靜壓樁周土體的彈塑性分析該部分是文章的主要工作所在,本文把過程周土體的本構關系看作是水平面的平面應變小孔擴張問題,利用小孔擴張原理,結合彈性力學以及塑性力學的知識,對後土體的性狀作出分析,得出對土的擠擴作用力、周土體塑性半徑、彈性區的位移,完成瞬時周土體彈性區和塑性區的超孔隙水力以及端球形孔擴張的擴張力。
  10. Hi spite of twenty years " usage in engineering, anchor jacked pile bases on no compellent theory. this paper works primarily in the following aspects : 1. introduction of anchor jacked pile as a new technique, few people realize it. this paper will introduce anchor jacked pile about its history, strongpoint, construction course, research status quo and some existent problems

    錨桿靜壓樁作一個介紹錨桿靜壓樁作為一種新技術,目前還有很多人不是很了解,該部分對錨桿靜壓樁的發展歷史、自身優點、施工過程、適用范圍、研究現狀以及存在的一些問題作了粗略的介紹。
分享友人