錨石 的英文怎麼說

中文拼音 [máodàn]
錨石 英文
bonder header
  • : 名詞(鐵制的停船設備) anchor
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  1. Now, right before us, the anchorage was bounded by a plateau from two to three hundred feet high, adjoining on the north the sloping southern shoulder of the spy - glass, and rising again towards the south into the rough, cliffy eminence called the mizzen - mast hill

    在我們前方,地與一片高約兩百至三百英尺的高地連接著。高地的北端與望遠鏡山的南坡相接,向南則逐漸拱起,形成崎嶇多的後桅山。
  2. Paper barrel insertion grouting for the rock anchor

    桿紙筒填塞法注漿工藝
  3. Application of anchorage cable reinforced support in synclinal shaft of coal road

    索支護在平煤一礦進風門修復中的應用
  4. Standard test method for pullout resistance of ties and anchors embedded in masonry mortar joints

    埋入磚灰縫中的拉桿和的拔拉阻力的標準測試方法
  5. The anchor line fouled on a rock

    索纏在一塊巖
  6. Our product range covers drilling and demolition, direct fastening, diamond and anchoring systems, firestop and foam systems, installation, measuring and screw fastening systems as well as cutting and sanding systems

    我們的產品范圍涵蓋鉆孔與鑿破、直接固定、鉆與安卡栓系統、防火與發泡填縫系統、安裝、定位與螺絲固定系統,以及切割與砂磨系統。
  7. Internal force calculating method of prestressed - cable beam - on - foundation for high rock slope

    高邊坡預應力索地梁的一種內力計算方法
  8. Standard test method for rock bolt anchor pull test

    定拉力試驗的標準試驗方法
  9. The heavy load ropes used in the sea, fishery and coast industries, fishing system, rescue system, offshore platform systen, the ropes for berth, anchoring, survey system for the ociasion earthquake, and cable systems

    ? ?在海洋,漁業和海岸工業中使用的重負荷繩索。海上打澇系統,救援系統,海洋油平臺系統,停泊、拋、嵌入系泊線、海洋地震勘測、海底電纜系統。
  10. The best solution for hard to grind anchor vitrified diamond and cbn grinding wheels

    難研削材的最佳解決方案-牌瓷質燒結法鉆及cbn砂輪。
  11. This paper describes the construction technique of offshore anchoring rod rock - socketed piles for dalian beiliang oil product terminal, with the emphasis laid on the construction method of offshore construction platform, cleaning up inside piles, rock - socketed anchoring rod, and anchoring bolt, as well as means for dealing with special situations during construction

    摘要介紹大連北良化成品油裝卸碼頭海上描桿嵌巖樁施工技術,著重介紹海上施工平臺、樁內清理、嵌巖桿、固硅的施工方法及施工中特殊情況的處理。
  12. When first i discover d them, i was going to give over my enterprise, and come back again, not knowing how far it might oblige me to go out to sea ; and above all, doubting how i should get back again ; so i came to an anchor ; for i had made me a kind of an anchor with a piece of a broken graplin, which i got out of the ship

    一開始發現這些礁時,我幾乎想放棄這次航行,調轉船頭往回走,因為我不知道要向外海走多遠,而且,我更懷疑自己能不能回到島上。於是,我就下了-我用從船上取下來的一隻破鐵鉤做了
  13. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應力板的支護機理:充分利用巖土層自身或預處理的局部的穩定性,隨基坑開挖分層掛鋼筋網噴射砼,以避免土層幫片及巖邊坡小的節理破碎滑塌,並把土壓力傳給板,由桿集中受力,通過桿的固力平衡土壓力。
  14. Mountaineering equipment - rock anchors - safety requirements and test methods

    登山設備.巖栓.安全要求和試驗方法
  15. Strata reinforcement support system components used in coal mines - specification for rockbolting

    煤礦用地層加強支持系統部件.巖栓規范
  16. Application on foundation of rock anchorage in projects concerning transmission line

    送電線路工程中巖樁基礎的應用
  17. It is applied to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, to drill drainage holes and grouting pile holes on roof of tunnel gallery

    適用於水電站鐵路公路邊坡大噸位預應力固孔排水孔隧道口管棚孔的施工,以及預防滑坡巖坍塌等地質災害治理工程。
  18. 3. in applications, the structure of stabilizing piles with pre - stressed anchor cables can be associated with retaining wall, combined bolting and shotcrete, precast concrete lagging ( plain, troughlike, archlike shapes ), and so on, which enlarge the application areas of this structure

    3 、在實際應用中,預應力索抗滑樁可與砌擋墻、噴支護、預制擋板(平板、槽形板、拱形板等)聯合作用,形成多種形式的組合結構,從而可擴大這種結構型式的應用范圍。
  19. Based on the rock pressure ' s characteristics of the pre - driven roadway, the rational support plan and parameters about roof bolting with bar and wire mesh are determined, and the manner of driven waste in place of coal was adopted

    基於斷層中預掘巷的礦壓特點,確定出其合理的梁網支護方案與支護參數,並採用了掘出的矸與煤的合理「置換」方式。
  20. The formula of the maximum lateral deformation has been proposed for tie - back wall when the anchors are embedded in unmoving soils or in rocks. this work has enlarged the application field of the previous deformation formula. examples from engineering practice prove that the values calculated with above formulas can meet the need of the pit engineering

    將上面的變形計算公式做了推廣,提出了撐擋墻最大側向位移的預測公式(固不可移動的土層或巖中) ,工程實例表明,利用該式預測的變形值可以滿足工程的需要。
分享友人