鍋爐產量 的英文怎麼說

中文拼音 [guōchǎnliáng]
鍋爐產量 英文
boiler output
  • : 名詞1. (炊事用具) pan; pot 2. (裝液體加熱用的器具) boiler; cauldron3. (某些器物上像鍋的部分) bowl (of a pipe, etc. )
  • : Ⅰ動詞1 (人或動物的幼體從母體中分離出來) give birth to; be delivered of; breed 2 (創造財富; 生...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 鍋爐 : boiler; furnace
  1. Boiler is the heat equipment in common use best of all, which can supply qualified steam for the requirement of steam quantity adapting to burthen

    是最常用的熱工設備,其要求是供給合格的蒸汽,使適應負荷的需要。
  2. The china heating information network altogether divides into several big edition blocks they separately are : heats the on - line exchange area ; warmly passes the heating profession tendency ; heating ( thermoelectricity ) technical paper ; heating ( heating ) thermoelectricity product supply and demand information ; warmly passes the equipment, the heating product demonstrates, heating enterprise / heating company huang ye ; heating investigation ; heating magazine free subscription ; visitor visitors ' book ; and three leisure columns - reading room, joke, tabletop wallpaper and so on

    中國供熱信息網共分幾大版塊分別是:供熱供暖論壇交流;暖通供熱行業動態;供熱熱電技術論文;供熱供暖熱電品供求信息;招標采購投資合作;暖通設備供熱品論文(包括、熱表、散熱器換熱器、保溫管材、地暖等) ,供熱公司供暖公司採暖供暖設備黃頁;及兩個休閑欄目-在線書屋、精彩笑話等。
  3. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該在實際運行中存在的問題:在額定負荷下,膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁結焦嚴重,過熱器管壁溫度超標,無法帶上額定負荷;甚至有時因燃煤質的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生過程中,燃燒器的結構、布置,水冷壁的粘污、結垢,過剩空氣系數、一次風溫、煤種及其濃度變化等許多因素都會偏離的設計工況,從而影響內的傳熱和燃燒,造成膛出口超溫、水冷壁結渣等問題。
  4. High temperature water - source heat pump can reclaim loss - grade heat that is produced when energy - changed device such as boiler is operating, anti the return water of district heating supply system is heated

    摘要利用高溫水源熱泵設備可回收等能轉化設備生大的低溫餘熱,提高其溫度用於直接供熱。
  5. Aiming at such problems in combustion system of homemade middle and miniature boiler, as a complex system with the character of dead zone, time variation, serious non - linearity, large time delay, coupling and a lot of disturbance, this paper presents a new set of optimal control resources. by using well - matched control method on system, stable automatic running is realized. having the serious divulgence coals difference a lot from each other in character, instability of chemistry, value of lowest emission of heat, home - made boiler controller is not at all ideal. instead of traditional model that controls the ratio based on proportional control or with the correct signal of the amount of oxygen, this paper, combined with intellect control theory - - fuzzy control and self - optimizing concept, propounded a kind of fuzzy self - optimizing controller to be used in air supplying system of the boiler, and expatiates on the idea of dividing the control process into two parts, dynamic and static to realize, thus meets the demand of homemade boiler economic running

    本設計針對國中、小型電站燃燒系統參數時變、嚴重非線性、干擾因素復雜、耦合嚴重、模型不易確定的特點,提出多變協調控制方案,解決了系統可控性差,難以實現穩定自動運行的問題;在此基礎上,改變以往以煙氣含氧控制送風的傳統模式,針對國電站設備主體及一、二次送風迴路泄露嚴重,煤種混雜、成分不穩定、燃燒發熱值低、燃燒效率不高等問題,應用智能控制理論中的模糊控制技術,結合自尋最優控制的思想,設計了一種模糊自尋優控制器,應用在電站送風控制系統上,並闡述了動靜態兩種實現途徑,通過在線優化風煤配比,實現最佳經濟燃燒,切實保障了的經濟運行。
  6. Abstract : this paper introduces the programming essentials and methods for monoboard computer 8098 to realize water level ' s pressure compensation, and analyses the causes of water level ' s deviation in drum boiler occurring in the course of measurement

    文摘:本文介紹了單片機8098實現水位壓力補償的編程要點及方法,分析了測中汽包水位生偏差的原因。
  7. Heating - gas - liquid fuel, solid fuel - gas - fired central heating boilers of heat output not exceeding 70 kw designed to be connected to a mechanical installation for the evacuation of the combustion products

    加熱.氣體.液體燃料和固體燃料.與排放燃燒物的機械裝置相連的熱輸出不超過70kw的燃氣式集中供熱
  8. Jiangmen xiangfeng electrial products co., ltd is specialized in manufacturing household electric appliances, rice cookers, electric pressure cookers, hot pots, induction cookers, stainless steel products and aluminum products, ect. its annual output reaches 1. 2 million sets. our company is located in the overseas chinese hometownxinhui where there is a beautiful scenic spotguifeng mountain, it also lies near guangzhou - foshan high way and jiangmen - zhongshan high way, it is only 90 kolimeters from guangzhou

    專業生家用電器,電飯電飯煲電火電壓力電磁不銹鋼品及鋁製品等系列小家電品,年高達120萬臺,公司位於接近風景秀麗的旅遊風景區圭峰山,又是華僑之鄉。
  9. 1 the company has excellent production condition and public facilities such as self - provide power plant supplying high voltage wire of 35 kv, two sets 16000 kva transformers in power station, one deep well with water discharge of tons per hour, water pool with water pcapacity of 150 tons, one water tower with 100tons, two boilers with four tons, three compressed air machines to make sure the requirement of production. the company located at no. 62haozhuang st. taiyuan city and is 0. 7 kilometer away from dongshan expressway and also 2. 5 kilometer away from the railway station. the company was also equipped with communication facilities for example international telephone and fax

    該公司具有良好的生條件及公用設施:有自備電廠供給35kv高壓進線,變電站16000kva變壓器兩臺深井一眼,每小時出水50噸蓄水池150噸水塔1個,容100噸4噸兩臺,空壓機三臺,保證生需求。公司位於太原市郝莊正街62號,距東山過境公路0 . 7公里,離車站貨場2 . 5公里,交通十分便利。有國際電話及傳真機等通訊設施。
  10. The boilers are well - structured and bring good benefit for enviroment protection. china is a big country for energy consumption, now, saving energy and enviroment protection have been already put on the importment order of the day. the quantity of the boiler required for the development of industry has been increasing, the annual requirement is about 100, 000steam - tons. recently, it has higher requirment to develop the thermoelectricity combustion production. therefore, 220ton hour circulation fluidized bed will have a good prospective market

    中國是一個能源消耗大國,現已將節約能源和保護環境,提到了重要日程,而工業的發展對的需求還在不斷增大,每年約需10萬蒸噸,且目前對發展熱電聯有更高的要求,因此,生220噸時循環流化床有較好的市場前景。
  11. Dongying thermal equipment plant in dongguan exports skimmia japonica highway of shenguan and wen tong industrial area, is a professional undertaking boiler equipment installation and sales, water treatment equipment, solar, water heaters on the manufacture and sale of high - tech equipment enterprises, the company is committed to upgrading the heating technology and services, and constantly improve the quality of the construction work, its imports of valves, pumps, fuel pumps, boilers and various peripheral devices

    東莞市東英熱能設備廠位於莞深高速東莞出口溫塘工業區,是一家專業承接設備的安裝與銷售、壓力容器、配件銷售、導熱油閥門青田閥門廣東省總代理,水處理設備,太陽能,熱水設備的製造與銷售的的高科技企業,公司致力於熱力技術的提升與服務,不斷提高工程質,兼營各種閥門、水泵、油泵,以及各種周邊設備,除垢劑,清罐劑生,銷售。
  12. The dynamic characteristic of loops for water level is analyzed especially the reason of ostensible water level. on the basis of these a routine pi controller is designed to control the water level

    在分析了汽包水位迴路的動態特性,特別是「虛假水位」生的原因的基礎上,設計了常規pi控制器實現汽包三沖控制系統。
  13. There are many plants that have the character of time - varying, large delay, large inertia in the process of production of modern power station such as the superheated steam temperature, the reheated steam temperature, the water treatment of boiler and the load regulation. some of them have the strong character of nonlinear and some of them are multivariable coupling systems it is very difficult to obtain good effect of control by conventional pid control. it is necessary to set up the mathematics models of controlled plants if applying control means of modern control theory such as self - adaptive control, optimal control , decoupling control and predictive control. and these control systems have large calculation and bad character of real time in general. these disadvantages make them be not able to meet the need of real production process and limit the application of them in modern power station. now the generator units are developing towards large capacity and high parameters. many new kinds of generating electricity means are coming into being. the characers of production units of power station become more and more complex but the demand to quality of control becomes more and more strict. the new control means are in bad need to control them effectively

    現代電站的生過程中存在過熱汽溫、再熱汽溫、水處理、負荷調節等許多大遲延、大滯后、特性時變的對象,它們中有些還是具有強非線性特性的對象或多變耦合系統,採用常規的pid控制手段很難取得良好的控制效果。若應用現代控制理論中的自適應控制、最優控制、解耦控制、預測控制等控制手段,則需要建立被控對象的數學模型,而且往往控制系統的計算大、實時性差。這些缺點使其很難滿足實際生過程的需要從而極大地限制了其在現代電站中的應用。
  14. In 1977, owing to insufficient rainfall, hong kong again had to impose stage ii water restrictions. in order to increase the supply of fresh water, the lok on pai desalter put 4 units into production and by september, all 6 units were in operation. during this year the desalination plant was working at its maximum capacity, with 200 workers in the desalter, production was planned to increase to 60, 000, 000 gallons

    化淡廠的第一組於1975年10月正式投, 1977年,香港再次因降雨不足實行二級制水,為增加食水供應,樂安排海水化淡廠的四組同時投入生, 1977年9月, 6組全面使用,是年政府擴充化淡廠規模,增聘工人至200名,計劃將海水化淡每日增至6千萬加侖。
  15. Industrial boiler is widely used as a kind of important energy conversion device in industrial production

    工業作為一種重要的能轉換設備,在工業生中獲得了廣泛的應用
  16. The research objective is to improve the control system performance through the combination of the advanced control strategy with the meaningful information mined from the history operation database. firstly, a new solution for the control performance enhancement is presented by the reference of the kdd technology. aiming at practical application, a novel boiler load control method, which combines the multiple model adaptive control strategy with the data mining technology, is put forward in this dissertation

    本文第一部分為熱工過程式控制制與數據信息採掘,研究的重點是通過先進控制策略的應用以及運行數據中發掘的有用信息,提高現有典型熱工過程式控制制系統的性能,內容包括:首次提出了借鑒數據信息採掘技術的思路和方法,用於完善現有的熱力系統優化控制方案;在此基礎上結合生實際,提出了運用多模型自適應策略實施負荷控制,並利用關聯規則的數據信息採掘方法,通過對燃料發熱信息的在線診斷,優化控制器結構,同時實現燃燒配風的自適應調整,提高負荷、燃燒控制系統性能。
  17. It is not applicable that sodium sulfite is used alone as the deoxidant for the vapor injection boiler in oil fields. because of the high remains of sodium sulfite and the severe acid erosion in the water

    若單獨用硫酸鈉作除氧劑,則因水中亞硫酸鈉的殘余高,生嚴重的酸腐蝕,而不適用作油田注汽除氧劑。
  18. Article 19 the competent department concerned under the state council shall, pursuant to the standards for boiler soot discharge prescribed by the state, stipulate corresponding requirements in the boiler quality standards ; boilers that do not meet the prescribed requirements shall not be permitted to be manufactured, sold or imported

    第十九條國務院有關主管部門應當根據國家規定的煙塵排放標準,在品質標準中規定相應的要求;達不到規定要求的,不得製造、銷售或者進口。
  19. The plant has a whole area of 16000 square meters, and the processing area contains several workshops either of them has a very scientific connection with each other. the frozen storage has a capacity of 800mt, varieties of product are stored in separate chambers. since it is a brand - new plant, every equipment is new and advanced and in a very good condition, it also featured for the very powerful quick frozen system

    工場總佔地面積16000平方米,工場有儲藏庫800噸,生車間3000平方米,日速凍50噸配備生5噸的單凍機一臺,平板機2臺,制凍機一臺和熱線生和蒸煮機各項配套設施全,擁有職工160人,年生2000噸,值1000萬美金。
  20. Guangdong, for its part, is building four large scale natural gas power plants that will start operating in phases from 2006. flue gas desulphurisation will be installed in all other power plants with a capacity of 125 megawatts or greater by 2007. low nitrogen oxide burners are also being installed and highly polluting coal - fired boilers and industrial furnaces are being phased out

    廣東省亦正興建四間大型天然氣發電廠,這些設施預計可在2006年起分階段投,此外全省其他125兆瓦或以上發電容的發電廠在2007年或之前裝妥煙氣脫硫裝置,廣東省並逐步裝設低氮氧化物燃燒器和淘汰高污染的燃煤和工業
分享友人