The nature of the dependencies between linked tasks
鏈接任務之間的相互關系。After buying a new chain i was faced with the insurmountable task of putting the confusing jigsaw puzzle together again.
我買來新鏈條后,就面臨著一項難以完成的任務:如何把那些令人頭昏腦脹的「七巧板」重新拼裝好。Using the analytical result oflink 16 as reference, utilizing the idea of object - oriented modeling and based on hla, thetotal frame of data link, communication model and partition of terminal software module, whichareappliedinuavmissioncontrol, aredesigned. further, thecommunicationprotocol ofthemaclayerofthedata linkisanalyzed, theindependenttimeslot reservationselectionalgorithmisbroughtforwardanditsperformanceistested ; theterminalworkingsoftwareisrealizedusingthetechniqueofmultithreading, thekey techniques like timing and synchronization, multithreading murex and synchronizationandveracityofthemessage aresolved
然後深入研究了模擬的技術和方法,借鑒link16的分析結果,利用面向對象建模的思想,基於hla開發平臺,設計了應用於無人機任務控制的數據鏈總體構架、通信分層模型以及終端軟體模塊劃分。Later the couple nodes can implement the control frame transmission or data transmission. this kind of data transmission protocol based on slot precontract basically fulfills the networking and data transmission function
同步呼叫協議主要用於完成點到點鏈路建立和業務通道的協商任務,協商完畢即可在後續的時間內在業務通道上完成控制幀或數據幀的傳輸。2. in the task name field, select the tasks you want to unlink
2 。在「任務名稱」域中選取要取消任務鏈接的任務。Alternatively, follow the quest line you get outside the dark portal on the blasted lands side
另外,跟隨你在詛咒之地黑暗之門外面接到的任務鏈也是一個不錯的選擇。These properties make them ideal candidates for use in structure from motion algorithms. some known methods of line segment are integrated and an improved method is given. canny edge detector is used in this method to get edge, link the edge using freeman chain code, and then gradually delete useless chain code
首先綜合邊緣直線分割的研究成果,給出了改進后的邊緣直線分割方法,該方法以圖像邊緣的鏈碼表示為基礎,逐步刪除對完成計算機視覺任務沒有意義的鏈碼,並用最小二乘法擬合成圖像直線。Thispaperhasstudiedonthedatalinkinterfacetechniqueoftacticalcontrolsystem. firstof all, functional requirement and the important role of data link interface in tactical controlsystem is introduced ; secondly, with object oriented method, the characteristic of uav taskcontrol process is analysed, and then uav task control information model is established, anddata link interface standard of tactical control system is designed based on this model, including message format and transmission mechanism ; thirdly, data link control module isdesigned based on embedded linux operating system and has realized conversion betweendata link standard interface and the private interface of uav data link ; and then, combinationreal time corba middleware and its event channel, data link control modular componenttechnology is studied, and realization scheme is put forward ; finally, demostration is madebased on prototype of tactical controlsystem, which verify the validaty of data link interfacestandardandembeddeddatalinkcontrolmodules
本文對戰術控制系統中的數據鏈介面技術進行研究:分析了數據鏈介面在戰術控制系統中的功能需求;採用面向對象的方法,分析無人機任務控制問題,建立了無人機任務控制信息模型,並基於該模型設計了數據鏈介面通信協議,包括報文格式和傳輸機制;基於嵌入式linux系統設計了數據鏈介面控制模塊,實現了數據鏈標準介面與無人機數據鏈私有介面之間的相互轉換;結合實時corba中間件及其事件通道,研究了數據鏈介面控制模塊組件技術,並給出了實現方案;通過戰術控制原理實驗系統的演示實驗,驗證了數據鏈介面通信協議和嵌入式數據鏈介面控制模塊的有效性。You can fine - tune task links - and make sure you do n ' t gum up the clockwork - by using lag time and lead time
使用「前置重疊時間」和「延隔時間」調整任務鏈接,並且確保那些鐘表裝置不會粘上油漆。Once these tasks are linked, microsoft project will always schedule the start date for hanging clocks relative to the finish date for painting walls, no matter when these tasks occur
這些任務相互鏈接后,無論它們何時發生, microsoftproject總會根據「粉刷墻壁」任務的完成日期來排定「懸掛鐘表」任務的開始日期,從而避免將任務限制在某個可能無法實現的固定日期。( you can also specify lead and lag time. ) for information about linking tasks, see chapter 5, " getting tasks done in the right order, at the right time.
有關鏈接任務的內容,請參閱第5章「按恰當的順序和時間完成任務」 。2. double - click the link line of the tasks you want to change
2 。在需要更改的任務處雙擊鏈接線。A link line appears on the gantt chart, connecting the two tasks
鏈接線將顯示在甘特圖中,它連接兩個任務。Due to mission profile, launched conditions and trajectory, maneuver chains for stand off missile are designed. instruction control model and maneuver model is setup for ucav flight simulation
結合作戰任務剖面、導彈發射條件和彈道,設計出無人機防區外攻擊導彈發射前、后的機動動作鏈。Before you link tasks, you need to determine the sequence of tasks
在鏈接任務之前,需要確定任務的順序。However, that we might be very secure, i told him he should go back again, and choose out five of them, and tell them, they might see that he did not want men, that he would take out those five to be his assistants, and that the governour would keep the other two, and the three that were sent prisoners to the castle, my cave as hostages, for the fidelity of those five ; and that if they prov d unfaithful in the execution, the five hostages should be hang d in chains alive upon the shore
話雖如此,為了保險起見,我叫船長再回去一趟,從他們七個人中挑出五個人來。我要他告訴那些人,他現在並不缺少人手,現在只要挑選五個人做他助手,總督要把其餘兩個人以及那三個已經押送到城堡里去的俘虜留下來作人質,以保證參加行動的那五個人的忠誠。如果他們在執行任務過程中有任何不忠誠的表現,留在島上的五個人質就要在岸上用鐵鏈活活弔死。The paper mainly does research on simulation of the air - to - surface ( as ) attack mission. on the basis of that, as attack representative maneuver chains are designed. and, corporation between uninhabited combat air vehicle ( ucav ) and as missile is discussed in the process
本文主要針對無人機對地攻擊任務特點,開展模擬模型研究,並以此為基礎設計出無人機防區外攻擊的典型動作鏈,對攻擊過程中無人機與空地導彈的配合問題進行了初步的研究。A series of topics linking to task - specific information
一系列指向任務特定信息的主題鏈接。To enable microsoft project to start each task at its proper time, you need to link the tasks to each other, based on their start and finish dependencies
要使microsoftproject在恰當的時間啟動每一個任務,就必須根據任務開始和結束的相關性對任務進行相互鏈接。Some schedulers require the job to be relinked with a particular library to support checkpoint and process migration
有些調度器需要任務重新鏈接到某個特定的庫上來支持檢查點和進程遷移的功能。分享友人