鐵水深度 的英文怎麼說
中文拼音 [tiěshuǐshēndù]
鐵水深度
英文
depth of liquid iron- 鐵 : Ⅰ名詞1 (金屬元素) iron (fe) 2 (指刀槍等) arms; weapon 3 (姓氏) a surname Ⅱ形容詞1 (形容...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 深 : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
- 度 : 度動詞[書面語] (推測; 估計) surmise; estimate
- 深度 : 1. (深淺程度) degree of depth; depth 2. (觸及事物本質的程度) profundity; depth
-
Tianjin underground railway building. tianjin underground railway building is located at haiguangsi street, it ' s 143m high, and it has being built, the underground sturcture has 3 floor, which is one of the deepest underground structrue which embed in the ground around 10m. this project is using our material for internal waterproof
天津地鐵大廈位於天津和平區海光寺附近,設計高度為143米,該工程正在建造過程中,地下為三層結構,採用利砼牌水泥基滲透結晶型防水材料作為單一防水材料做內防水,該結構深入地下十幾米,為天津市內較深的地下結構。Hospital wastewater treated by iron chipping micro - electrolysis
鐵屑微電解法深度處理醫院廢水Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel, this paper discusses some corresponding countermeasures including the improvement of ground property, appropriate draining of groundwater, scheduled excavation depth and width, etc, to control strata distortion and surface settlement, and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation
摘要針對深圳地鐵淺埋暗挖隧道施工中影響地表下降及地層變形的因素,提出了遵循「十八字」原則、改善土體特性、適度排放地下水、根據地層條件選擇施工方法、增大左右線隧道開挖面的距離、合理確定開挖進尺、提高施工效率、加強初期支護、及時施作二次襯砌等對策。Meanwhile it retains evenness on lift force to prevent leakage of residue that is caused by installation clearance error or changes in welding criteria, flow off molten iron as well as break - over welding, so that the ideal fosion depth and finishment have been fulfilled
在需原動力的條件下,該機利用彈性夾角變化,隨著筒體轉動,使墊層焊劑始終緊貼筒體外側環向焊接區,並保持托力均勻防止因裝配間隙誤差或焊接規范變化而引起漏渣,鐵水下淌及焊穿現象,達到理想的熔深度和光潔度。Study on advanced treatment of coking wastewater by iron - carbon micro - electrolysis process
鐵炭微電解深度處理焦化廢水的研究Face failure and ground subsidence caused by metro tunnel excavaton in weak watery stratum of shenzhen play an important role in metro construction because they influence the safety and time of construction and also lead to large loss of the whole project
摘要深圳富水軟弱地層地鐵隧道開挖中出現的工作面失穩及由此引起的地表塌陷是地鐵安全施工中極其重要的方面,對施工安全、進度都有較大影響,同時也對整個工程造成巨大的經濟損失。Track maintenance technology is raising while high speed railway was developed in abroad. the developed countries like japan, french and german etc. had made their own high speed track management code. strict managing track smooth qualities by using advanced track measuring car, exhibiting their maintenance level by using advanced measuring system, mechanism construction, scientific diagnosis and automatic management technology
國外高速鐵路迅猛發展,線路維修養護技術水平也不斷提高,主要表現在採用先進的檢測系統、高度機械化作業方式、科學診斷和自動化管理方面。我國鐵路近十年取得了很大的發展,經歷了四次大提速, 1998年8月開始,我國引進瑞典x2000擺式列車在廣深線試運行( 200km h ) 。We are the first class engineering company that apply the ims technology to the pure water industrial waste water reclamation projects in electric led power pcb steel petrochemical industry successfully. we are inviting risk investment to this technology and carry out in bot mode
應用全膜法進行工業廢水、中水的深度處理和回用技術成功應用於石化、電子、 pcb板、鋼鐵、印染等行業,應用bot運作模式能帶來巨大經濟和環境效益。This paper studies the key techniques involved in the construction of the deep water foundations, long - span prestressed concrete continuous rigid - framed girders and long - span concrete - filled steel tube arches of yichang changjiang river bridge on the newly built yichang - wanzhou railway, and also provides solutions to the possible problems thereof, which may be of certain guiding roles to the practical construction
摘要對新建鐵路宜昌至萬州線宜昌長江大橋深水基礎、大跨度混凝土連續剛構梁、大跨度鋼管混凝土拱等施工過程中遇到的關鍵技術問題進行了研究,並對各個問題提出了解決方案,對實施性施工有一定的指導意義。分享友人