鐵道工程 的英文怎麼說
中文拼音 [tiědàogōngchéng]
鐵道工程
英文
railway construction- 鐵 : Ⅰ名詞1 (金屬元素) iron (fe) 2 (指刀槍等) arms; weapon 3 (姓氏) a surname Ⅱ形容詞1 (形容...
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 程 : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
- 鐵道 : railroad; railway
-
This paper has described the authors experience acquired in applying the ground - penetrating radar, rayleigh wave and dpt to examining weak groundsill in the subway tunnel, and also discussed the application conditions of these means as well as their merits and shortcoming
摘要介紹了在地鐵隧道工程建設中使用探地雷達與瑞雷波法結合輕便動力觸探技術檢測軟弱地基的經驗和幾點認識,並討論了該勘察方法的應用條件和優點。Stoplights are red, yellow, and green, because traffic officials, early on copied the code system railroad engineers devised for track systems controlling the trains
交通信號燈採用紅、黃、綠三種顏色,是因為早期的交通指揮官模仿鐵路工程師所設計的用於鐵道系統控制火車的編碼系統。Analysis of the reason and control of ground settlement of subway at guangzhou subway no. 2 line kecun contact line fork
廣州地鐵客村聯絡線岔口段隧道工程地面沉降原因分析及控制The light rail track diversion works were carried out to facilitate the light rail grade separation works at pui to road
輕鐵路軌改道工程是配合杯渡路架空輕鐵路軌工程而進行,以便騰出空間興建輕鐵高架橋。A pedestrian crossing west of pui to stop that had been closed to make way for light rail track diversion works was reopened on 14 june, allowing passengers to travel between platforms on both sides of the tracks
較早前因進行輕鐵路軌改道工程而臨時封閉,位於杯渡站以西的行人過路處已於六月十四日重開,方便乘客來往兩邊月臺。With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places
摘要採用鐵路工程抗震設計規范、動三軸試驗及有效應力的理論分析相結合的方法,對南京地鐵南北線( 1號線)區間隧道開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當隧道底板坐落在5層且5層較厚時的液化區出現在隧道襯砌底板處;局部地段液化區出現在隧道頂部及拱腰;大部分地段的液化區出現在隧道頂板上方。Abstract : in this paper, the efficient stress method is used as main means, while the railway engineering anti - earthquake design specification and the dynamic triaxial test are used as additional means. the authors analyze the ground layer liquefaction of shield tunnelling built on powder soil or fine sand, whose top plate is buried under two kinds of depth, and conclude that the liquefaction area is different with different buried depth. finally, the rational buried depth is proposed
文摘:以有效應力原理的有限元計算分析為主、鐵路工程抗震設計規范及室內動三軸實驗為輔,對修建在粉土或粉細砂層中的盾構隧道進行了兩種不同埋深情況下的液化分析,得出了埋深不同液化區出現區域不同的結論,並提出隧道抗液化的合理埋深。The geological conditions are very complicated in hejiazhai tunnel which is located in guizhou shuibo railway, this tunnel is named " mashed tunnel " with the most difficult geological conditions such as the high dense gas and developed karst and gushing water assembled together, the geological hazards like the gushing water and sand, the collapse of tunnel, surface subsidence and slide, cracking of tunnel lining were often happened during construction period
摘要貴州水柏鐵路何家寨隧道,工程地質條件極其復雜,集「高瓦斯、強巖溶、大涌水」為一體,施工期間曾發生多次涌水涌砂、洞內坍方、地表塌陷與滑坡、支護襯砌開裂變形等地質災害,堪稱水柏鐵路施工難度最大的「爛洞子」 。Standard for constructional quality acceptance of railway tunnel engineering
鐵路隧道工程施工質量驗收標準Zhejiang 8 amounting to tunnel engineering limited company is alley of well of bridge of road surface of channel of pilot a ship into a harbour of water and electricity of volume road tunnel, railroad channel, irrigation works, roadbed, mine, large cubic metro of earth and stone blow up the professional construction company that construction is an organic whole, have channel highway project to always contract two class aptitude
浙江八達隧道工程有限公司是集公路隧道、鐵路隧道、水利水電引水隧道、路基路面橋梁、礦山井巷、大型土石方爆破施工為一體的專業施工企業,擁有隧道公路工程總承包貳級資質。Standard for constructional quality acceptance of railway track engineering
鐵路軌道工程施工質量驗收標準By face failure and ground subsidence investigation and in - suit monitoring analysis in some lots of shenzhen metro phase line, especially of lot 3a in which two large ground landlides have occurred in construction, the reasons of ground subsidence are expatiated respectively from three aspects, including the characters of the physical mechanical parameters of stratum above tunnel, the monitoring analysis of stratum deformation and contruction technics causation
通過對深圳地鐵期工程土建施工中全線部分暗挖標段出現的工作面失穩、地表塌陷工程實踐和現場監測結果分析,特別著重對連續2次出現地表塌陷的3a標暗挖隧道研究,從隧道上覆地層物理力學性質參數、地層變形監測分析及施工工藝原因3方面闡述了地表塌陷的原因。This paper refers the case project of the running tunnel from grand theater to science museum in shenzhen metro, through fem numerical simulation, researches the ground surface settlement and influence on the underground pipeline in soft stratum abundant with water by the technique of horizontal jet grouting
本文以深圳地鐵一期工程大劇院科學館區間中的近接雙孔隧道工程為背景,對在富水軟弱地層中應用水平旋噴樁工藝進行控制降水施工時對地表沉降及地下管線的影響進行了研究。Specification for class i arc welding of ferritic steel pipework for carrying fluids
輸送流體用鐵素體鋼管道工程的一級電弧焊規范After acquiring the land for the hsr chiayi station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, water engineering, foul sewer, public illumination, traditional piping and bridge work
高鐵嘉義車站特定區區段徵收公共工程施工項目包括:整地工程道路工程雨水下水道工程公共照明工程交通設施工程停車場工程污水下水道工程共同管道工程自來水工程及相關管線埋設工程等。After acquiring the land for the hsr tainan station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, public illumination, transportation facilities, parking lot, foul sewer, common duct, water engineering and piping
高鐵臺南車站特定區區段徵收公共工程施工項目包括:整地工程道路工程雨水下水道工程公共照明工程交通設施工程停車場工程污水下水道工程共同管道工程自來水工程及相關管線埋設工程等。After acquiring the land for the hsr taoyuan station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, public illumination, transportation facilities, parking lot, foul sewer, irrigation, transplanting, common duct, water engineering, piping and bridge work
高鐵桃園車站特定區區段徵收公共工程施工項目包括:整地工程道路工程雨水下水道工程公共照明工程交通設施工程停車場工程污水下水道工程灌溉工程植栽移植工程共同管道工程自來水工程相關管線埋設工程及橋梁工程等。Highway and railway engineering
道路與鐵道工程Labor force quota for subway engineering in city transit system
城市軌道交通地下鐵道工程勞動定員定額Journal of railway engineering society
鐵道工程學報分享友人