長時間地震 的英文怎麼說

中文拼音 [zhǎngshíjiāndezhèn]
長時間地震 英文
long period
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : Ⅰ動詞1 (震動) quake; shake; shock; vibrate 2 (情緒過分激動) be greatly excited; be deeply ast...
  • 長時間 : long
  1. Between the infantry and the cavalry the artillery, in a long line of polished, shining cannons quivering on their carriages, crawled slowly by with their heavy, brazen sound, and their peculiar smell from the linstocks, and ranged themselves in their places

    而可以看見炮隊拉了距離,一門門擦得閃閃發亮的大炮在炮架上顫動著,可以聽見銅件動的響聲,可以聞見點火桿散發的氣味,炮隊在步兵和騎兵之爬行前進,在指定的點拉開距離停下來。
  2. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對江三峽庫區特殊的質環境與工程實際情況,在充分考慮水對庫岸滑體穩定性影響的前提下,提出了一個適用於江三峽庫岸滑坡體穩定性分析的綜合分析評價體系,並取得了如下幾個方面具有工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,水的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於下水位升高降低了滑坡體的有效應力,另一方面是由於下水的期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對三峽庫區的特殊條件,系統分析了作用於三峽庫區滑坡體上的力系和庫水位在175m與145m變化滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或期降雨狀態) 、 175m庫水位、以及庫水位由175m調節下降至145m等各種不同情況的有機組合,本文系統歸納總結出了10種典型計算工況,並具體給出了相應的作用荷載的計算方法,使在庫區岸坡滑體穩定性分析評價對計算工況選擇及其作用荷載的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於重慶市豐都縣名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對三峽庫區的滑坡穩定性分析是實用可行的。
  3. Linnan sub - depression which is mesozoic and cenozoic faulted lacustrine basin is located in the southwestern part of huimin sag, depression of jiyang. it is dominated by lacustrine - fill sub - depression. based on well logs, three - dimension seismic profiles, cores and other basic data, 10 horizons including 6 turnaround surfaces and 4 maximum flooding surfaces are defined from es3 to the lower part of es2 formation, and 1 long - term and 5 intermediate - term base - level cycles which are named from c5 to c1 could be identified, and then the chronostratigraphic framework of the sub - depression is built

    本文以巖心、鉆井、測井、資料為基礎,在下第三系沙三段沙二下的一個期基準面旋迴(二級層序)內部識別出10個有層對比意義的界面,包括6個基準面下降到上升的轉換面(層序界面) , 4個基準面上升到下降的轉換面(湖泛面) ,劃分出c1 - c5五個中期基準面旋迴,建立了等層格架層格架。
  4. We need more efforts from civilian and government to establish the ems ( emergency medical service ) in our country after ji - ji ( taiwan ) earthquake ; it is longtime of apathy for us for training disaster medical doctors, but the person of disaster medical doctor is important for response coordinators and planners in the interorganization resource management. this article suggests each organization to follow the exist plan and to set the geographic information system ( gis )

    摘要921集集大突顯出民與政府在緊急醫療救護所付出的努力還需加強,對于災難醫師的培育更要靠期的訓練;在災難發生不同專業團隊的集成,在事故災情嚴重,超出該區緊急醫療救護處理能力,協調、聯絡鄰近區之救支持更為重要;本文認為集成當前已存之法令與規章並予以落實,在指揮中心以防救災緊急醫療通報圖臺顯示及查詢應用系統作任務之分派可提升救護能力。
  5. The principle of vibrator is to introduce scattered energy to underground in a comparatively long time, and collect the energy through correlation and compress it into a narrow pulse. the portable high - frequency vibrator system, developed by key lab of geo - exploration and instrumentation ( jilin univ ), ministry of education, generates chirp signal and accumulates energy through a long - time bestiring. according to the characteristics of vibrator, the seismic recorder that operates on - line with vibrator must have these functions as follow : first, it must have the ability of recording a great quantity of data. second, it must have assistant channels to sample reference signal. third, it must have the function of data correlation in real - time

    可控源利用可控的小能量、激發波來實現沖擊源瞬產生的大能量激發波。在利用可控源進行勘探,要求記錄信號,這對儀的采樣度提出了很高的要求。受存儲量和數據傳輸速度的限制,絕大多數儀很難對如此大的數據量進行記錄,同,可控源要求儀有兩個輔助通道並且具有數據相關功能,目前國內還沒有出現滿足要求的儀產品。
  6. The contrast is higher, the amount of reflect becomes more ; and the sedimet is deeper, the shaking duration becomes longer. so. as the contrast higher and the depth deeper, more waves converge on the basin, more waves interfere with each other, the duration is longer, the amplitude of displacement or accelerate is larger, and the fourier responce spectra contain more components

    所以,基巖與沉積層的剪切波速比越大,沉積層的深度越大,波就越容易聚集在盆中,中國局工程力學研究所碩士論文波與波之的干涉機會就越多,盆的振動就越,沉積層的位移和加速度反應就越大,波的頻譜成分就越豐富。
  7. At a time when everyone is putting out revised gdp growth forecasts for this year, on account of the war in iraq and atypical pneumonia, we must be aware also that the economic " shocks " arising from these events are likely to be temporary and, hopefully, short - lived

    正當大家因應伊拉克戰事及非典型肺炎事件紛紛修訂今年的本生產總值增預測的候,我們必須明白這些事件所帶來的經濟蕩是過渡性的,亦希望只會維持一段短
  8. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    公路沿線廣泛分佈有昔格達層,昔格達層能否用作高速公路路基填料,國內沒有先例,本論文就是結合導師的科研項目,在非典期,現場達5個月的工作,完成了從試驗、現場施工工藝到路堤分層沉降監測等工作,是面對生產實際,認識昔格達層的性質和其作為基、路基和填料應用中面臨的問題進行的研究。主要的研究內容有:對攀西層巖性、構造等質環境和昔格達層的沉積歷史過程作了系統的分析,研究表明西攀高速公路主要受安寧河斷裂和昔格達斷裂影響,通過活動頻繁,差異沉降較大,對公路建設、安全運行和沿線構築物設計有較大影響;由於昔格達層在有些路段作為基、有些作為路基,對其基本性質進行了研究:包括天然密度、含水量、塑液限、顆粒級配等指標的試驗研究。研究成果表明:昔格達層為湖相沉積,主要為砂巖和泥巖,它以細粒組為主,同粘粒的存在,使其具有一定粘性。
  9. The meaning of cqc ( t ) algorithm is the difference in time domain between the peak value location in time axis of input earthquake and model response of structure, which is called delay time. through the delay time calculating of a series of oscillators with different damp ratio and natural vibration frequency, it is found that it will bring biggish error if the cqc algorithm applied on the structure which has long period, and the time dependent cqc ( t ) algorithm could solve the problem easily

    Cqc ( t )方法的意義在於輸入動峰值與結構模態響應峰值在軸上的差,我們稱之為延遲,通過計算具有不同周期和阻尼比結構的延遲,發現對于自振周期比較的結構, cqc方法會帶來比較大的誤差,而基於程的cqc ( t )方法能夠解決這個問題。
  10. Through caculation example, the factors that will influece the results of seismic soil response including element meshing, intergration step, damping, boundary were studied and the regularity was generalized. in the third part, the pile - soil - superstructure model was constructed and solved

    通過算例考察了影響土體反應的單元網格劃分、積分、阻尼取值、邊界等因素,並對土體反應的規律性現象做了總結。
  11. Most reckon it will never be possible to give accurate, long - term predictions of when and where serious quakes will strike

    人們大多認為給出嚴重即將發生的點的準確、期預測是不可能的。
  12. Changing the grading of sic particles not only affects the strength and pile density, but also modifies the phase compositions and microstructure of the material. with the reducing of sic particles, the strength of the material increases obviously. the nitrification scheme has the greatest influence on phase compositions and microstructure " of si3n4 ( si2on2 ) - sic, after two continuous nitrification reacting peak and short - time high - temperature treating, the best properties can be obtained ; and the residual strength of the composite is much higher after the thermal shock resistance test, which shows that the material possesses excellent thermal shock resistance

    本論文較全面探討促進強度和顯微結構良好的si _ 3n _ 4 ( si _ 2on _ 2 )結合相的實驗條件,實驗數據顯示:引入適量的燒結助劑能夠促進si _ 3n _ 4 ( si _ 2on _ 2 )的生成和晶粒的大,而過量,其促進作用反而下降;隨著si粉加入量增加,生成的結合相明顯增多,復合材料的性能顯著提高;改變sic顆粒級配不僅影響復合材料的強度與堆積密度,而且對復合材料的物相與顯微結構也有影響,隨著顆粒逐漸細化,材料的強度有較大的提高;對復合材料的強度、物相與顯微結構影響最大的是氮化制度,經過兩個氮化高峰連續的反應和短的高溫后處理得到的復合材料性能最好;通過抗熱性能實驗后復合材料的殘余強度較高,顯示出較好的抗熱性能。
  13. Under the horizontal earthquake action and wind force, aim at " the pure frame structure with rectangle columns ", " the pure frame structure with special - shaped columns ", " the frame - truss structure with special - shaped columns " and " frame - shear wall structure with special - shaped columns ", earthquake action analysis was done by the spacial finite element method through the changes structural parameter. analyzing systematically " structure vibration mode ", " vibration period ", " structure lateral rigidity ", " seismic action force ", " seismic response force ", " floor seismic shear force ", " lateral horizontal displacement of structure " and " members internal force ". results indicate : ( 1 ) based on equal area, the special - shaped columns replaced the rectangle columns, the structural lateral rigidity enlarges, the lateral displacement minishes obviously, the earthquake response increase slightly, the biggest increasing amount of frame columns axis - compress ratio is smaller than 0. 08. the whole aseismic performance of structure has improved ; ( 2 ) when the section ' s length and section ' s thickness ratio of special - shaped columns is smaller than 3. 6, the structure benefits to resist seismic action ; ( 3 ) the angle of horizontal seismic action with the whole coordinate is 0 degree, structure earthquake response is bigger, belonging to a control factor of structure aseismic design ; ( 4 ) the frame - truss structure with special - shaped columns and the " a " - brace has the biggest lateral rigidity ; ( 5 ) the frame - shear wall structure with special - shaped columns have bigger lateral rigidity and smaller displacement, members internal force enlarged just rightly, have much superiority of resisting seismic action ; ( 6 ) in the higher seismic fortification criterion region ( 8 degree of seismic fortification intensity ), aseismic disadvantageous building site ( iii type site ), adopting special - shaped columns structure system, should reduce possibly the building ' s self - weight in order to reduce the earthquake response ; ( 7 ) the response spectrum method of computing seismic response and the time - history analysis method have similar analysis result

    西安理工大學碩士學位論文在水平作用下,並考慮風荷載組合,分別對「矩形柱純框架結構」 、 「異型柱純框架結構」 、 「異型柱框一析架結構」及「異型柱框-剪結構」等四種結構體系,通過改變結構參數,運用空有限元方法,進行作用計算。系統分析研究「結構振型」 、 「振動周期」 、 「結構側向剛度」 、 「結構反應力」 、 「樓層剪力」 、 「結構側向位移」 、 「層位移角」 ,以及「構件內力」 。結果表明:在等面積原則下,異型柱代換矩形柱后,結構剛度增大,側向位移明顯減小,反應力略有增加,框架柱軸壓比最大增幅小於8 % ,結構整體抗性能有所提高;當異型柱肢肢厚比小於等於3 . 6,結構有利於抗;水平作用力與整體坐標夾角為0度,結構作用效應較大,屬結構設計的控制因素之一;異型柱框一析架結構採用「人」字斜撐,側向剛度大於「八」字斜撐和「人一八」字混合斜撐;異型柱框一剪結構側向剛度大、位移小,構件內力增大適中,是一種抗性能優越的結構體系:在抗設防烈度較高區( 8度)和抗不利的建築場( m類場) ,採用異型柱結構體系,應盡可能減輕結構自重,降低作用力;分別採用「振型分解反應譜」法和「程分析」法進行作用計算,兩種方法所得結果基本一致。
  14. If, at any time during the execution of the contract, either of the parties to the contract is prevented from executing the contract in cases of force majeure such as war, serious fires, flood, typhoon and earthquake, etc., the time for execution of the contract shall be extended for a period equal to the affect of those causes

    在合同期的任何候,合同雙方的任何一方,由於受到如戰爭、嚴重火災、洪水、臺風、等不可抗力事件的影響而不能執行合同,履行合同的期限應予以延,延的期限應相當於事件所影響的
  15. The previous researches on the seismogenic process emphasized particularly on single earthquake source model and theory, and studied the phenomena and mechanisms of long term medium term and short - term earthquake preparation process according to its temporal and spatial dynamic evolvement of stress field and strain field in earthquake source and its neighboring area

    關于過程,早期的研究大多側重於源模型和理論,圍繞孕育發生過程中,源及其鄰近區應力場、應變場的空動態演化來研討其、中、短、臨各階段的現象與機理,而較少涉及各相互關系的研究。
  16. On the basis of gap ' s temporal - spatial characteristics in and around source area before an earthquake, we propose a method to estimate characteristic parameters ( characteristic distance and time ) in the region - time - length ( rtl ) algorithm and introduce the method of correlation coefficient developed by some authors in 2006 to determine the characteristic parameters

    摘要根據源及周圍區出現的空區的空特徵,提出了一種估計「區域度」演算法中特徵參數(特徵距離和特徵)的方法,並介紹了2006年一些學者提出的用相關系數估計特徵參數的方法。
分享友人