門樁 的英文怎麼說

中文拼音 [ménzhuāng]
門樁 英文
goal post
  • : Ⅰ名詞1 (房屋、車船等的出入口 ) entrance; exit; door; gate 2 (形狀或作用像門的東西) switch; va...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  1. Saral prasad, the 23 - year - old groom in eastern bihar state, said he would not budge from the girl ' s village home after she refused to marry him earlier this week in an

    來自比哈爾東部的23歲小伙薩拉爾普拉薩德說,他不會離開女孩家前一步。上周早些時候,他的準新娘因為嫌他皮膚黑而拒絕這包辦婚姻。
  2. Garment said the "sordid mess" had many dimensions.

    特說,「這缺德事」牽涉面很廣。
  3. They were ready to go to church ; the beautiful bride, mr. lorry, and miss pross - to whom the event, through a gradual process of reconcilement to the inevitable, would have been one of absolute bliss, but for the yet lingering consideration that her brother solomon should have been the bridegroom

    美麗的新娘羅瑞先生和普洛絲小姐都已作好去教堂的準備。經過了一個適應過程,普洛絲小姐已逐漸接受了那無法逃避的事實,這婚事對她只剩下絕對的歡樂了,盡管她仍然戀戀不舍,希望當新郎的是她的弟弟所羅
  4. Finically, the dynamic property of portal water injection sheet piles is analyzed in this paper, and the influence on dynamic property of pile length and distance between piles is discussed in detail

    此外,還探討了架式水力插板的動力特性,以及長和間距對結構動力特性的影響。為進一步指導工程實踐提供了理論依據。
  5. Based on the construction of large diameter pile foundations at deep water riverbed without overburden for the shengmi bridge in nanchang, the construction difficulties and construction control key points involved in the method for bored pile construction with floating gantry are described

    摘要通過對南昌生米大橋深水無覆蓋層大孔徑基施工實踐,介紹浮式龍鉆孔施工方法中的施工難點和控制重點。
  6. As he approached his farm, he was surprised to see a horse hitched to each of the posts of the gate

    就快到農場,看到口的每個木上都綁著一匹馬,他非常吃驚。
  7. I easily gather, mr. traveler, that you have set forth to accomplish a very important matter.

    旅行家先生,不難猜想,您出遠行是為了完成一重大的使命。
  8. Within doors, that is, when it rained, and i could not go out, i found employment on the following occasions ; always observing, that all the while i was at work i diverted my self with talking to my parrot, and teaching him to speak, and i quickly learn d him to know his own name, and at last to speak it out pretty loud p o l, which was the first word i ever heard spoken in the island by any mouth but my own

    然後就是修築了一道堅實的籬笆把地圍起來,籬笆的木都是從我以前栽過的那種樹上砍下來的。我知道這種樹生長很快,一年內就能長成茂密的籬笆,用不著多少工夫去修理。這個工作花了我三個多月的時間,因為這期間大部分時間是雨季,我無法出,故修築籬笆的事時輟時續。
  9. After the control area for construction has been demarcated by the local people ' s governments above the county level, the transportation departments of local people ' s governments above the county level should put up signs and boundary markers

    建築控制區范圍經縣級以上地方人民政府依照前款規定劃定后,由縣級以上地方人民政府交通主管部設置標、界
  10. But there were other causes of repugnance ; - causes which, though still existing, and existing to an equal degree in both instances, i had myself endeavoured to forget, because they were not immediately before me. - these causes must be stated, though briefly

    我所以反對這婚姻,還有別的一些叫人嫌忌的原因這些原因雖然到現在還存在,而且在兩事裏面同樣存在著,可是我早就盡力把它忘了,因為好在眼不見為凈。
  11. For post cementation, bis - core liquid catalyst must be used instead of the paste catalyst in order to lower the viscosity of the cement

    關于的粘結, bis - core液體催化劑可以代替催化糊劑以降低水汀的粘度。
  12. Gengkis khan ' s horse stake

    成吉思汗拴馬開啟記憶的閘
  13. The domestic and abroad research about retaining structure with double - row piles is summarized, and its disadvantages are shown in this paper. two - dimensional nonlinear plane - strain fern analysis, which emphasizes the pile - soil interaction, is developed for portal water injection sheet piles with the software ansys

    本文在總結國內外對雙排支護結構的研究現狀的基礎之上,結合通用有限元軟體ansys ,對架式水力插板進行了二維非線性平面應變有限元分析,就其中的關鍵問題? ?與土的共同作用進行了研究。
  14. There are visitors of an american - european regiment to cross a line for the previous period, have been detained by the south for 4 days. in addition, in order to regard a line of as the circle, southern each side draws back in the non - military buffering area of setting - up of two kilometers on the north, the ones that negotiated the old site and located in this area in ban mendian in the fifties are towards square one side

    前一段時間有一個歐美團的遊客因越過線,被南方扣留了4天。此外,以這根水泥線為界,北南雙方各後退兩公里建立非軍事緩沖區, 50年代板店談判舊址就坐落在這個區域的朝方一側。
  15. This paper compares the spatial calculation of piled wharf with simplified plane bent structures ' calculation through selected models, and analyzes the effect on the simplified transverse beam at different location of the crane, so as to obtain the distribution rule and empiric coefficient of crane load

    摘要通過所選模型進行高碼頭結構空間計算與簡化的平面排架計算對比,分析機不同位置時傳遞到所簡化橫梁的作用效應,從而得出機荷載的傳遞分配規律及傳遞的經驗系數。
  16. The non detecting of pile is a new technology, but it is difficult for the hide of pile and the vibration phenomenon

    摘要基無損檢測是一新興技術,由於基屬于隱蔽工程,又存在土共振等復雜問題,使得檢測和分析有一定的難度。
  17. In this paper, by way of example of the elevated pile cap construction of sanmenjiang bridge in liuzhou city, the design and construction of the column steel boxed cofferdam of tensile and compressive type are introduced with particular details given to its design scheme, working principles, construction technology and construction key points, and the matters of attention in the construction with the cofferdam are expatiated as well

    以柳州市三江大橋高承臺施工為例,介紹拉壓柱式鋼吊箱圍堰的設計與施工,重點介紹鋼吊箱圍堰的設計方案、工作原理、施工工藝及施工要點等技術細節,同時對鋼吊箱圍堰施工中的注意事項進行了闡述。
  18. The teaching requirements of " touch and go " and " every point throughout the body acts like a spring " have already taken effects. when master yao s students have matches with others, they are hardly defeated by others

    后來經師父師伯與同的講解在慢慢理解站的原理后,才明白它不是擺一個肩架,而是內外結意,意念假借所產生的力的鍛煉作用。 」
  19. The denizens were all enjoying the usual afternoon nap of an hour or so which the exceedingly early hours kept in summer - time rendered a necessity. at the door the wood - hooped pails, sodden and bleached by infinite scrubbings, hung like hats on a stand upon the forked and peeled limb of an oak fixed there for that purpose ; all of them ready and dry for the evening milking. angel entered, and went through the silent passages of the house to the back quarters, where he listened for a moment

    奶牛場里的居民,都在像平常一樣享受午後一個小時左右的小睡,夏天起床非常早,中午小睡一會兒是不可缺少的前有一棵用來掛牛奶桶的剝了樹皮的橡樹固定在地上,樹權上掛著帶箍的木桶,木桶經過不斷的擦洗,已經讓水泡透了,洗白了,掛在那兒就像一頂頂帽子所有的木桶都洗靜了,曬幹了,準備晚上擠牛奶使用。
  20. Pile cap construction at grid 2 adjacent to slip road from tuen mun road

    于屯公路入口之二號位建造
分享友人