間斷性檢查 的英文怎麼說
中文拼音 [jiānduànxìngjiǎnzhā]
間斷性檢查
英文
intermittent inspection- 間 : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
- 斷 : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
- 性 : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
- 檢 : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
- 查 : 查名詞1. [植物學] (山查) hawthorn; haw2. (姓氏) a surname
- 間斷 : be disconnected; be interrupted; interval; leapfrogging; disjunction; break hiatus; hiatus; inter...
- 檢查 : 1 (用心查看) check up; inspect; examine; censor; survey rummage; review; jerque; docimasia 2 (...
-
And so, the gis - based electric cable information management system can administrate transformer substation, switch substation, power distribution room, power cable, silo, canal and high voltage user according to their location, drawings, cable records. the system provides multiple index for query service and statistical electric cable graph and information on properties
本系統可以實現對變電站、開關站、配電室、電纜、豎井、溝道及高壓用戶等空間位置、圖形資料(包括一次接線圖、竣工圖、斷面圖) 、電纜臺帳信息的綜合管理;並可按多種方式來查詢、檢索、統計電纜圖形及屬性數據信息。To identification when lumber intervertebral discs protrusion happen and how it happen is more and more important and urgentent. we will study clinical situation and mri of lumber intervertebral discs protrusion, recording percentage changes of mri signal intensity and other image characteristic. we will study mri signal intensity of protruded nucleus pulposus, the size of protruded nucleus pulposus, discs hight, neural root compression degree, thicken ligamenta flava, discs degeneration degree, protrusion type and their relation with incident time
本研究擬對已知不同突出時間的腰椎間盤突出患者進行詢問病史、體格檢查和磁共振掃描,記錄臨床表現、突出時間、突出髓核及同層間盤的信號強度、突出髓核大小、突出間盤厚度、有無神經根受壓、有無黃韌帶肥厚、突出間盤變性程度、突出類型等指標,觀察突出時間不同的腰椎間盤的臨床表現及磁共振表現特點,尋找與腰椎間盤突出時間相關的指標,並根據臨床表現及磁共振所見初步判斷腰椎間盤突出的時間。Methods the causes of 105 patients with consecutive cough for more than eight weeks were primarily evaluated with an anatomic diagnostic protocol incorporated with induced sputum analysis and then also determined by the specific therapy
方法採用解剖學診斷和誘導痰檢查方法,對連續105例時間持續8周以上的咳嗽患者進行病因初步診斷,並通過針對性治療證實。Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf
因此,查明采空區的具體位置,在此基礎上對場地進行工程適宜性評價,對整個工程建設具有重要的指導意義。本論文在總結前人對地下采空區勘察及有關穩定性研究方法的基礎上,以山西大寧煤礦鐵路專用線五龍溝1 ~ # 、 2 ~ #隧道采空區為研究實例,在詳細的地表工程地質調查和測繪的基礎上,結合通過對采空區有關人員的探訪,首先對主要開采礦層的空間展布進行地質判斷;然後採用國內外較為先進的工程勘探與檢測儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側一定范圍內(共40米)進行了面波測試,對采空區的可能出露部位進行了較為準確的判斷;最後通過鉆探加以驗證,表明面波儀的測試結果是較為合理可信的。Supervisors would be responsible for evaluating how well banks are assessing their capital adequacy needs relative to their risks. secondly, implement effect and all - orientation ongoing supervision. it comprises onsite examination and offsite supervision, regulation and risk - based supervision, manager monitor and running monitor for the whole institutions
它是現場稽核檢查與非現場監管、合規性監管與風險性監管,以及對管理層監管與對整個機構運行監管的綜合體現,其最終目的是通過全方位、持續性的不間斷監管,避免或降低金融風險,保證整個銀行業的穩健運行。Currently in use is more slimming products appetite inhibitors, should be used to its side effects, which normally takes the doctor used under the guidance of the drug, side effects and dosage of the drug, the greater the dose the greater side effects, while each pair of drug sensitivity not the same and thus should start small dose and gradually to increase the effective dose ; during another drug not suddenly interrupted, it should gradually decrease until suspended medication before or during inspection as biochemical blood glucose and lipids, weight monitoring and, if necessary, timely adjust dosage
目前所用的減肥藥多是食慾抑制劑,使用應注意其副作用,一般需在醫生的指導下服用,藥物的副作用與藥物劑量有關,藥量越大副作用也越大,同時每個人對藥物的敏感性也不一樣,因而應從小劑量開始,逐漸增加劑量至有效;另外用藥期間不能突然中斷,也應逐漸減量直至停用,服藥前或期間檢查血生化如血糖、血脂,監測體重,必要時及時調整用藥量。To bj1027 pick up, for former - brind " generally great change augmenting tyre " landscape - orientation - mete, then result tyre leaning - grind. through plentiful market researching, correlative examination, data stat analyse, theory calculating and the same products and car comparating, we make clear the relation and the movement connection in suspend, veer and tyre, confirm again veer trapezia - cut - point, and adopt a series of measures, resovle tyre leaning - grind completely, elevate the whole track " capability
我們通過大量的市場調查、相關的檢測與試驗、數據的統計分析、理論分析計算,並對比同類產品及轎車進行分析研究,弄清了懸架、轉向與輪胎之間的相互聯系與運動關系,重新確定了轉向梯形斷開點的位置,並相應採取了一系列措施,徹底解決了輪胎偏磨這一問題,使整車性能得到了明顯提高。The nonlinear dimensions are decomposed into several sets of linear dimensions, and the 3d dimension chain is projected into dimension chains of three individual directions, namely, x - coordinate direction, y - coordinate direction and z - coordinate direction. every individual dimension chain is checked with an improved algorithm of dimension testing, and the conflicting dimension is adjusted by the mechanism of dimension rank and the principle for adjusting the dimension model
介紹了各種非線性尺寸虛擬分解成線性尺寸的方法,將空間的尺寸鏈投影成x 、 y 、 z三個方向上的單向尺寸鏈,在此基礎上根據改進的尺寸冗餘判斷演算法對各單向尺寸鏈進行尺寸封閉檢查;引入尺寸的優先機制和尺寸模型調整的原則,據此對沖突的尺寸進行調整。On average, it took 628 + 65 minutes for female patients who underwent computer scanning to move from ed to the operation room, compared to 323 + 56 minutes for those who did not undergo computer scanning
女性病人從急診到手術之平均時間,經電腦斷層檢查費時628 65分鐘,沒作為323 56分鐘。分享友人