間隙膜 的英文怎麼說

中文拼音 [jiān]
間隙膜 英文
interstitial membrane
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : 名詞1 (縫隙; 裂縫) crack; chink; crevice 2 (空閑) gap; interval 3 (漏洞; 機會) loophole; op...
  • : 名詞1. [生物學] (像薄皮的組織) membrane 2. (像膜的薄皮) film; thin coating
  • 間隙 : (空隙) interval; gap; freedom; space; [機械工程] clearance; separation; stricture; clear; inter...
  1. An arachnoid membrane is your best ally. always do your dissection within the arachnoidal planes

    蛛網是你的盟友。要在蛛網分離。
  2. The annihilation of the octahedron voids at the tips of fpds was divided two processes : ( 1 ) the oxide on the void was removed by the out - diffusion of oi in the shallow region, especially the oi aroud the void and by the entry of the interstitial si atomics. ( 2 ) the void without oxide shrinked by emitting vacances and the migration of silicon atoms from edge to the bottom of void

    Fpds端部八面體空洞的消失分為兩個階段: (一)覆蓋在空洞各個內壁上的氧化由於高溫下矽片表面區域的氧原子,尤其是空洞型缺陷周圍的氧原子的外擴散及自硅原子的進入,而逐漸變薄直至最終消失。 (二)無氧化的空洞,在高溫下發出一個個空位,同時八面體空洞周圍的自硅原子不斷的從空洞的邊緣遷移至空洞的底部,使空洞逐漸變淺直至最後消失。
  3. The skull bones are not fully ossified and large membranous areas exist between them

    顱骨還沒有完全骨化,在骨中是大塊的狀組織。
  4. Before backbone nerve, hind the is highlighted by film of spinal cord stiff backbone and arachnoid bursa more scabbard place when the root walks out of vertebra to be in charge of is wrapped by, call backbone film sleeve, the clearance between two scabbard and arachnoid next antrum are interlinked, nerve root is complete dip in cerebrospinal fluid, from this before, hind two wear film of classics stiff backbone severally, the scabbard that forms for stiff backbone film respectively laps, the fu in two by there is one cranny to call backbone film pocket between putamen, this scabbard is wrapped by hind the backbone ganglion of the root

    脊神經前、后根走出椎管時多被脊髓硬脊及蛛網囊突出的鞘所包被,稱為脊袖,兩鞘之和蛛網下腔相通,神經根完全浸於腦脊液中,自此前、后兩根各自穿經硬脊,並分別為硬脊形成的鞘包裹,在兩根的覆被硬有一裂稱為脊囊,此鞘並包被后根的脊神經節。
  5. Abstract : in this paper, an analytical study of the dynamics of the piston in a reciprocating internal combustion engine is conducted. the equations of reynolds and moving of piston are derived. a useful method of solution is obtained. the method is applied to s1100 diesel engine. the results of this study indicate that piston oil film is found to be sensitive to the piston - cylinder bore clearance, the location of the wrist pin and lubricant viscosity

    文摘:對往復式內燃機活塞的動力特性進行了分析研究,導出了活塞潤滑的雷諾方程和活塞運動方程,給出了可供實用的求解方法,並採用這種計算方法對s1100柴油機進行了設計計算與試驗研究.研究結果表明,活塞潤滑油歷程與活塞& &缸套的、活塞銷的位置、潤滑油的粘度等因素密切相關
  6. When sulphurisation time is 30 minutes and sulphurisation temperature change from 180 to 240, the atomic ratio s / sn of the films increases from 0. 72 to 1. 08 and energy gap of the films increases from 1. 44ev to 1. 48ev with the increasing of the sulphurisation temperature

    當硫化時為30分鐘硫化溫度在240 ~ 310之變化時,薄的s / sn值隨著硫化溫度的升高從1 . 08上升到1 . 96 ,能帶隨著硫化溫度的升高從1 . 01ev上升到1 . 72ev 。
  7. But above 700, the resistivity decreases suddenly, as the nb ion diffuse from linbo3 into zno and occupied the interstitial sites. nb ions, as donor doping in zno film,

    Linbo3中的nb擴散到zno中去,占據位置,相當于失主能級,形成電阻率低的n型zno薄
  8. Objective to discuss the curative effects of small gaps bridging and epineurial suture in repairing the rupture of peripheral nerves

    摘要目的:探討小橋接法和神經外吻合法修復周圍神經斷裂的效果。
  9. Methods one side of sciatic nerve of 60 sd rats was treated by small gaps briding ( experimental group ), another side was treated by epineurial suture ( control group )

    方法:通過動物實驗,對60隻sd大鼠的一側坐骨神經採用小靜脈橋接法吻合(實驗組) ,另一側用採用神經外吻合(對照組) ,觀察神經修復效果。
  10. Fist ly, use mass equivalent method to predigest the original rotor system. secondly, use transfer matrix arithmetic to have finished the relative program to calculate the critical speed of flexible multi - tray rotor bearing system by matlab language. thirdly. finish program the unbalance response using riccati - transfer matrix arithmetic and finity buck arithmetic. fourthly, answer to the high vibration of uncontroled system when cross the critical speed, come out to adopt changing clearance damper bearing to control the viberation

    本文對多柔盤轉子-支承系統的振動現象做了以下初步探索:用質量離散化方法把原轉子系統簡化;採用matlab語言編制了對傳遞矩陣法計算多柔盤轉子-支承系統的臨界轉速;用matlab語言對riccati傳遞矩陣法和有限元法編制了程序計算系統的不平衡響應;並針對其過臨界轉速時振動較大的現象,提出採用變控制油剛度和阻尼,從而使原系統的在特定轉速(臨界轉速)的一段范圍內不平衡響應減小;並從被動控制與主動控制兩方面進行數值模擬,取的了較好的控制效果。
  11. The equipment adopts centrifugal sliding plow groove rotor and is the newest structure evaporator at present. it can form membrane under the condition of small flow. comparing with that of fixed space drag evaporator, its evaporation capacity can increase 40

    本設備採用離心式滑動溝槽轉子,是目前國外最新結構蒸發器,在流量很小的情況下也能形成薄,在簡體蒸發段內壁表面附著處理液中的淤積物可被活動刮板迅速移去,和固定的刮板蒸發器相比,蒸發量可提高40 69 。
  12. The n type carrier was provided by interstitial zn atom, and zn / o ratio and crystalline quality of zno thin film effeted its hall mobility. when zno thin film was annealed in the ar ambience, p conduction type was founded in the zno thin film which grew in oxygen enrichment condition. this might be excess oxygen in zno thin film entered interstitial position of crystal lattice ( oi ), and p type carrier was from oi

    在ar氣保護下,對富氧條件下生長的zno薄的退火后的霍爾測量中發現, zno薄呈現p型導電狀態,分析認為,這可能是由於富氧狀態下生長的zno薄中過量的o在ar氣保護下退火沒有逸出薄,反而進入了zno薄位置,成為正電中心,使zno薄呈現p型導電。
  13. Analysis on four cases of acute carbon monoxide poisoning complicated with compartment syndrome

    急性一氧化碳中毒合併筋綜合征4例分析
  14. A study of sectional anatomy and 3d reconstruction of the deep cervical fascia and fascial space

    頸深筋及筋的薄層斷面解剖及三維重建
  15. During this electron transfer, a further two pairs of h + ions are pumped into the intermembrane space, making a total of six per molecule of nadh

    在整個電子傳遞過程中,另有一對被泵入,總計每分子nadh形成6個電子。
  16. Aqueous fluid volume and [ c1 ~ j were assayed in samples withdrawn by micropipettes. intraocular pressure ( top ), pressure - dependent outflow, and anterior chamber compliance were determined from pressure measurements in response to pulsed and continuous fluid infusions into the anterior chamber using micropipettes. result : in wildtype mice ( gdi genetic background, age 4 - 6 weeks ), iop was 16. 0 ? 0. 4 mmhg, aqueous fluid volume was 7. 2 ? 0. 3 ul, aqueous fluid production was 3. 6 ? 0. 2 ul / hr, aqueous fluid outflow was 0. 36 ? 0. 06 ul / hr / mmhg, and anterior chamber compliance was 0. 036 ? 0. 006 ul / mmhg ( mean ? se, 8 - 10 eyes )

    實驗方法包括:將熒光物質用電離子滲透的方法穿透角導入活體小鼠的前房中,然後應用共聚焦顯微鏡根據熒光強度變化測量房水生成率;通過顯微注射針吸取房水檢測房水容積和氯離子濃度;顯微玻璃管刺入前房測量眼內壓,並將生理鹽水分別以連續和脈沖兩種方式注入前房,測量房水的順應性和房水排出與眼內壓的相關性。
  17. The numerical results show that : with the enhancement of er effects, the bearing capacity is obviously increased ; the increase magnitude is larger when small radius clearances and large eccentricity ratios ; at low shear rates, the influence of er effects on the lubrication performance of journal bearings are more obvious

    數值研究表明:隨著電流變效應的增強,軸承潤滑油的承載能力明顯提高;軸承半徑越小,偏心率越大,軸承承載能力增加的幅度也越大;在低剪切速率下,電流變效應對軸承潤滑性能的影響較大。
  18. Because there are few gaps between the cells, the protease inhibitors must be able to pass through the cell membranes to reach the brain tissues beyond, and most large molecules cannot breach this so - called blood - brain barrier

    因為管壁細胞之少有,因此蛋白酶抑制劑必須要能夠穿透細胞,才能夠到達血管外的腦組織,而大分子大都無法沖破這層所謂的血腦屏障。
  19. Spatium retroperiton ale pelvis

    骨盆腹
  20. Spatium retroperiton ale

分享友人