閘壩 的英文怎麼說

中文拼音 [zhá]
閘壩 英文
gate dam
  • : anchor gate
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. Qualitatively similar results were obtained by ahmad (1953b)in a model study of a river barrage or weir.

    阿赫麥德(1953b)在河道的閘壩模型研究中得到了定性的相同結果。
  2. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿藏族羌族自治州汶川縣境內的岷江河段上,電站為低引水式開發。正常蓄水位1268 . 0m ,最大高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  3. Study on repair technique of sluice and dam destroyed by flood

    水毀攔河閘壩修復修補技術研究
  4. Discussion of the dam design and management from the danger occurring in jimei sluice

    從積美攔河閘壩出險談閘壩工程的設計與管理
  5. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深工程運河起自廣東省東莞市橋頭縣,流經司馬、旗嶺、馬灘、塘廈、竹塘、沙嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河閘壩和八級抽水站。
  6. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #段溫控並縫措施研究:為廠房段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱基(肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程體的靜動力安全穩定性及溫控方案提供依據。
  7. Finite element analysis of body structure of throttle valve based on ansys

    閘壩結構的三維有限元靜力分析
  8. Qualitatively similar results were obtained by ahmad ( 1953b ) in a model study of a river barrage or weir

    阿赫麥德( 1953b )在河道的閘壩模型研究中得到了定性的相同結果。
  9. Chen xuan also established most of engineering bases of gates and locks and repairing engineering projects along the grand canal

    運河其他各河段的閘壩,修防等工程的基礎,也大都由陳?奠定。
  10. The structure of dam and foundation was analyzed in terms of 3 - dimentional finite element static analysis and kinetic reaction analysis by ansys software

    採用ansys結構分析軟體,對閘壩結構和地基進行三維有限元靜力分析和動力響應分析。
  11. The floodgate dam is completed more than 6 months ahead of time in the original piano it can generate electricity about 500 million kw ahead of time, convert about 100 million yuan. 4

    3 .通過溫控研究,簡化了溫控措施,加大了澆築尺寸,加快了施工進度,閘壩竣工比原計劃提前了6個月。
  12. Where any existing dam or sluice gate hinders navigation, the people ' s government at or above the county level shall order the original construction unit to take remedial measures within a prescribed time limit

    現有的礙航閘壩,由縣級以上人民政府責成原建設單位在規定的期限內採取補救措施。
  13. Article 44 during the flood reason, the use of reservoirs, sluices, dams and other water engineering structures must be subjected to the command, control and supervision of the relevant flood control headquarters

    第四十四條在汛期,水庫、閘壩和其他水工程設施的運用,必須服從有關的防汛指揮機構的調度指揮和監督。
  14. Article 19 : building of dam, sluice gate, bridge, wharf and other structures blocking, crossing or bordering a river channel ; laying pipelines or cables across a river, must comply with state - specified standards for flood control and navigation as well as other related technical requirements

    第十九條修建閘壩、橋梁、碼頭和其他攔河、跨河、臨河建築物,鋪設跨河管道、電纜,必須符合國家規定的防洪標準、通航標準和其他有關的技術要求。
  15. In order to meet the requirement of stability, loading and the distortion of the dam, the technique of vibration & impulsion was adopted to reinforce the overburden layer

    為了確保閘壩基礎能滿足基穩定、承載、變形的要求,設計上採用了振沖法對覆蓋層進行加固處理。
  16. By analyzing and calculating the structure and stress distribution status of foundation under time of completion, operating period and earthquake condition, the initial determination on the kinetic strength and liquefied possibility of underlying sand layer beneath the dam foundation are obtained

    分析一計算結構及地基在竣工期、運行期和地震作用下變形和應力分佈狀況,並初步判斷閘壩基礎卜伏砂層的動弧度及液化的可能性。
  17. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居水電站設計和施工的關鍵技術問題。 、本文對水工大體積混凝土溫控問題進行了分析和總結,結合青居水電站閘壩工程,開展溫度應力及溫度控制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,節約工程費用。
  18. In case a non - navigable stream or man - made waterway becomes navigable after a dam or sluice gate structure is built, the construction unit shall simultaneously build ship passage facilities or reserve sites for such facilities, and the expenses needed thereby incurred shall be borne by the communication departments concerned, unless there are other state - provisions applicable

    在不通航的河流或者人工水道上修建閘壩后可以通航的,閘壩建設單位應當同時修建過船設施或者預留過船設施位置,所需費用除國家另有規定外,由交通部門負擔。
  19. Through applying above theories and methods, safety monitoring model of temporary shiplock and ship lift dam sections in three - gorge project is studied. varying rule of dam displacement during construction period is analyzed by viscoelastic finite element, and safety monitoring model of dam displacement and stress during construction period is founded. rationality and validity of the model is validated

    ( 4 )應用前述的理論和方法,對三峽工程臨時船閘壩段、升船機段的施工期安全監控模型進行了研究;對施工期體位移變化規律進行了粘彈性有限元分析,同時建立了大施工期位移和應力的安全監控模型,據此對模型的合理性和有效性進行了驗證。
  20. When building permanent dams and sluice gate structure on navigable or bamboo and log rafting streams, the construction unit must simultaneously build facilities for ship or log passage or, after being approved by departments authorized by the state council, take other remedial measures and also make adequate arrangements for navigation and bamboo and log rafting during the construction period and the initial filling period, and bear the expenses thereby incurred

    在通航或者竹木流放的河流上修建永久性攔河閘壩,建設單位必須同時修建過船、過木設施,或者經國務院授權的部門批準採取其他補救措施,並妥善安排施工和蓄水期間的航運和竹木流放,所需費用由建設單位負擔。
分享友人