閥栓 的英文怎麼說

中文拼音 [shuān]
閥栓 英文
bibcock
  • : 名詞1 (指在某方面有支配勢力的人物或家族) established house or power group; a powerful person or...
  • : 名詞1. (可開關的機件) bolt; plug 2. (塞子) stopper; cork
  1. One machinery makes wen zhoudong limited company is to be engaged in research, development, production, sale is domestic and international the gas a powerful person of all sorts of medium compressor, a powerful person piece, lever of annulus of bedspring, piston, piston, piston, sealing ring, crosshead, crosshead is sold, copper is covered, bolt of connecting rod, connecting rod,

    溫州東一機械製造有限公司是從事研究、開發、生產、銷售國內外各種介質壓縮機的氣片、彈簧、活塞、活塞環、活塞桿、密封圈、十字頭、十字頭銷、銅套、連桿、連桿螺、軸瓦、曲軸、缸體及缸蓋、缸套、凈化設備及部件、冷卻器等壓縮機配件的專業技術型企業。
  2. Protective interior coatings for valves and hydrants

    門和給水用防護性內部塗層
  3. Shipbuilding. kingston valves. bolts and screws

    造船工業. "金斯頓"門.螺和螺釘
  4. Remove the bolts and cover, realign the diaphragm assembly, and place the cover back on the relief valve body

    拆卸螺蓋,重新校準隔膜總成,並將蓋放回到安全體上。
  5. In addition to military products, criaa designed & manufactured many kinds of industrial products such as ff series servovalves, lpg recovery plant, airport hydrant refuelling equipments, hydraulic pump stations, hydraulic control system and testing equipments, low temperature box with natural air cooling, and air refrigerators used for mines etc

    產品除軍用外,開發的民品有: ff系列伺服、油田氣輕烴回收裝置、機場式加油設備、液壓控制系統產品及試驗設備、空氣製冷低溫箱、礦用空氣製冷機等。
  6. After the valve has been adjusted to its balance set point and without moving the handwheel, remove the retaining bolt from the end of the handwheel using a 1 / 4 " allen wrench

    門調整到平衡點,並且沒有旋轉手輪后,採用一把1 / 4 "通用扳手從手輪末端拆卸固定螺
  7. With the handwheel / turn indicator sleeve assembly still at its balance set point indication, reinstall them on the valve stem and hold in place with the 1 / 4 " retaining bolt

    這時手輪/旋轉指示器套筒總成仍然位於平衡設置指示點上,將它們重新安裝到桿上,並用1 / 4英寸固定螺固定在其位置上。
  8. Repeat procedure with other body half and bolt together following the procedure noted above

    對另一半體重復同樣的步驟,然後按照上述步驟用螺緊固在一起。
  9. Live - loading of bonnet bolting stores the required sealing load during a pressure or temperature induced transient

    在壓力或溫度不斷波動轉換的情況下,動負載帽螺儲存了所需要的密封負載。
  10. Body / bonnet joints on pacific valves are designed for rugged services with a more than adequate number of bonnet bolts

    美國太平洋門上的體/蓋連接結構適用於惡劣的應用環境,可配置足夠數量的蓋螺
  11. Saint - gobain canalisation, the pipe network branch of the saint - gobain group, is the worlds leading manufacturer and exporter of ductile iron pipeline systems. saint - gobain canalisation manufactures 1. 7 million tons of ductile iron pipes, laid 15, 000km of pamtm pipeslines worldwide every year. more than 115 countries, 1000 cities round the world, approximately 100 of which are capitals, are equiped with saint - gobain pamtm pipeline systems which include pipes, fittings, valves, fire hydrants etc

    聖戈班穆松橋在全球擁有20多家分公司,年產球墨鑄鐵管170多萬噸,每年向用戶交付15000多公里長的管道系統,其生產的球墨鑄鐵管管件門消防雨污水排放球墨鑄鐵管道等產品均處於世界領先地位,並在115個國家的100多個首都以及1000多個城市廣泛運用。
  12. Coal mine equipment. troughed belt conveyors for loose bulk materials. cleaning scrapers and lateral bibs used for underground and for above ground. specifications. characteristics. test methods. acceptance testing

    採煤設備.鬆散集料用傳輸槽帶.地面和地下清除鏟運機和側閥栓.規范.特性.試驗方法.驗收試驗
  13. Fire hydrant systems equipment - specification for landing valves for dry risers

    消防系統設備.第2部分:乾式水嘴接地規范
  14. Fire hydrant systems equipment - specification for boxes for landing valves for dry risers

    消防系統設備.第4部分:乾式水嘴用接地箱規范
  15. It can be installed in horizontal or vertical. sealing gasket must be put on the connected, then equably tight the bolt

    可水平安裝或垂直安裝,安裝時兩法蘭連接中間必須加密封墊片,然後鎖緊螺
  16. Fire hydrant systems equipment - specification for landing valves for wet risers

    消防系統設備.第1部分:濕式水嘴接地規范
  17. Gasket deforms during hydrotest, bolts lose torque and must be retightened after hydrotest. ( pressure / temperature transient or frequent cycling produces similar mechanical action in valve

    在水力測試時,墊圈會變形,螺松動,因此在水力測試后必須加以緊固。 (壓力/溫度轉換或周期循環在門上產生相似的機械作用。 )
  18. Unscrew the four bolts to separate the body from the bonnet and control group

    擰松四個螺,從帽和控制組建之間分開體。
  19. In order to accelerate the district metering work, in 2005 a contract operation will be carried out, including matching the site pipelines and valves with the plans for calibration, checking leak distribution by leakage vibration recorder, and zone division and suspension confirmation. twd divided specific areas into blocks for testing. presently, twd has already prepared four blocks for testing and 30 more will be ready by the end of the year

    為加速推動94年小區計量工作,於今年下半年將其前置作業包括現場管線及閥栓與圖資比對校正新式漏水振動記錄器調查漏水分佈區塊劃分及斷水確認等委外辦理,目前已劃分完成4個計量區,預計至年底將完成30個。
  20. Commissioner of twd inspects a site pipeline and valve to match with plans for calibration

    處長視察現場管線及閥栓與圖資比對校正
分享友人