防連接板 的英文怎麼說

中文拼音 [fángliánjiēbǎn]
防連接板 英文
link plate
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  1. In addition to, the fatigue crack between web and upper flange of welded steel crane beam on heavy duty service was discussed, and based on long - term observation and research, the author classified fatigue crack into bearing type and middle type crack along the horizontal direction. the causation, distributive law and mechanism of the crack were analyzed, and the precautions to take and the measures to remedy crack were presented. the main defacts including damage, crack, erosion and aging in structures, especially in concrete structure were introduced ; the defact mechanism was analyzed and the precautions to take were also given

    另外,作者對重級工作制焊鋼吊車梁腹與上翼緣焊縫的縱向水平疲勞裂縫進行了長期的觀察和研究,根據疲勞裂縫產生的不同機理,將其分為支點裂縫和肋間裂縫,並討論了兩類裂縫產生的原因、分佈規律、機理以及治的措施;對工程中經常遇到的結構構件,尤其混凝土構件的幾種主要病害(損傷、裂縫、腐蝕與老化)進行了機理分析並提出了治措施。
  2. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與底間設隔離層、增設外水層、出水管與邊墻採用柔性、機座與底整體澆注、採用先進計算理論指導配筋。
  3. Abstract : this paper presents a new - type floating breakwater with the structure of “ duckweed ”. some circular wooden blocks were flexibly tied together and flat located on water surface. a series of experimental investigation were carried out. the experimental results show that 1 ) there are wave attenuation characteristics of the new - type floating breakwater ; 2 ) by comparing the two installation styles, the wave attenuation effectiveness anchored on the sea bed is better than that of anchored on the sea shore

    文摘:模仿水生植物「浮漂」的結構形式,設計一種新形式的波堤.將多塊圓形木柔性成一體,平鋪於水面,對其進行了一系列的消浪效果的初步試驗研究.試驗結果表明,該結構具有消浪性能,並且其固定方式採用系泊於水下的消浪效果優于系泊于岸邊的
  4. The link should be formed steel plate, plate edge, no burr hole ; a joint warping, used to be calibrated to prevent injury and friction, the friction surface to ensure close

    處的鋼或型鋼應平整,邊、孔邊無毛刺;頭處有翹曲、變形必須進行校正,並止損傷摩擦面,保證摩擦面緊貼。
  5. Large cap / cable chamber with terminal board for lead connections

    配置端子的大型護罩和電纜盒,用於電源的
  6. Other features : vessel head high strength and durability of stainless steel d - rings ; paddle with the sliding lock locks connect parade as more flexible ; stern plate has a unique optimal angle, height and installation of aluminum alloy plate ; rope with haste, be lifesaving ; plus side of durable bull fender, the collision can play protective role

    其他特點:船頭部採用高強度和耐用的不銹鋼d型環;船槳鎖採用滑鎖,操所更加靈活;艉具有獨特的最優角度,高度以及安裝有鋁合金墊;裝有急用救生繩;船邊加有耐用撞護舷,在碰撞時能起到保護作用。
  7. Rradial packaging : when insert assembly is mated, the space between shell and assembly should be totally packaged with glue in order to prevent external dust, liquid and harmful gas leaking radically into connector

    徑向灌封:絕緣安裝組件到位后,殼體與組件之間的全部用膠液灌,止外界的灰塵、液體、有害氣體從器的徑向滲入
  8. Besides problems with planks and guardrails, the main causes of injuries and deaths on scaffolds are poor planning for assembling and taking them apart, missing tie - ins or bracing, loads that are too heavy, and being too close to power lines

    除了腳手護欄桿的問題外,主要受傷和死亡的原因是由於安裝和拆除的方案低劣,點和支撐桿件缺失,荷載超重和離電纜線太近所致。
  9. According to the calculation results, the influences of the construction operation program, the length of the toe slab ( connecting slab ) and the rigidity of the diaphragm wall are compared

    據此,對整個壩體的施工程序、趾(包括)的長度和滲墻的剛度進行了分析比較。
  10. Set the bop stack on the stump and close the hydraulic connector, and then secure it

    噴器組吊坐到甲試驗樁上、關液壓爪形器,並固定。
  11. Our company provide connectors, which are widely applied to computer mainframe, lcd, telecomunication card, storage, moving harddisk, card reader, digital camera, mp3, pda, liquid crystal television, switchboard, cardalarm, videophone, cordless telephone, and all kinds of communication products

    我司提供器產品,廣泛應用於計算機主機、液晶顯示器、電訊卡、存儲器、移動硬盤、讀卡器、數碼相機、 mp3 、 pda 、液晶電視、交換機、汽車盜器、可視電話、無繩電話及各種通訊設備產品上。
  12. Perforation of heat exchange tube, cracks on the jointing connection of heat exchange tube and tube bundle hoard result in the leakage of the tube bundle in sulfur condenser were analyzed, proposed precautions and countermeasures were derived from a combination of the plant operation conditions and equipment conditions, the original equipment with satisfactory outcome were revamped

    摘要分析了硫冷凝器換熱管穿孔及換熱管與管頭出現裂紋導致管束泄漏的原因,結合實際工況提出了預和處理措施,並對原設備進行了改造,效果良好。
  13. Connectors with assessed quality, for use in d. c., low - frequency analogue and in digital high speed data applications - printed board connectors - detail specification for two - part connectors with shielding and a basic grid of 2, 5 mm - cable to board connectors, shielded against emc, grid 2, 5 mm, for high speed data rates, for use with printed boards

    經過質量評定的直流低頻模擬及數字高速數據系統用器.印製電路器.帶屏蔽和2 . 5mm基柵的兩件式器詳細規范.同印製一起使用的高速數據傳輸率emc屏蔽護和2 . 5mm柵格的電路器電纜
  14. Flexible sheets for waterproofing - part 1 : bitumen sheets for roof waterproofing - determination of shear resistance of joints

    水用撓性薄.第1部分:屋面水用瀝青氈片.處耐剪切性測定
  15. Pressed metal plates, the water board and the whole board should be fixed angle reliable, strong, anti - corrosion coatings and sealing material coating installation intact, connector size, spacing and the state should comply with the design requirements of the standard

    壓型金屬、泛水和包角等應固定可靠、牢固,腐塗料塗刷和密封材料敷設完好,件數量、間距應符合設計要求和國家現行有關標準規定。
  16. In this paper, based on a typical plan arrangement of two - user - on - one - storey and leap storey type multi - story house, the mechanical behaviours of the truss system, the difficulties in designing the truss system and the design of composite floor system is deeply analysed ; the connection design, fire proofing and corrosion protection used in this structure system are briefly introduced

    本論文以一梯兩戶躍層式多層住宅的一種典型平面布置為依託,以構思該住宅結構體系設計的方式,對這種桁架體系的受力性能、設計難點和應用於該結構體系的壓型鋼?混凝土組合樓蓋的設計進行了深入分析,對結構採用的、墻體和腐措施進行了簡單討論。
  17. This paper outlines the development of enabling technologies of high ? integrity casting, extrusion, sheet forming, corrosion protection, and joining and assembly

    這篇文章概括鎂在汽車構件中的一些關鍵技術,主要包括高精度的鑄造、擠壓、料成型、腐蝕與護、和組裝等。
  18. 4, in welding connection, the placing screw shall be appropriately loosened to prevent distortion. 5, in welding, covering shall be applied to cover the rubber fabric to prevent the damage to product

    4焊管時,應將限位螺絲適當松動,止將補償器限位拉彎或產品變形。
分享友人