附加支撐 的英文怎麼說

中文拼音 [jiāzhīchēng]
附加支撐 英文
added support
  • : Ⅰ動詞1 (附帶) attach; add; enclose 2 (靠近) get close to; be near 3 (依從; 依附) agree to; ...
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ動詞1 (抵住; 托住) prop up; support 2 (用篙使船行進) push or move with a pole 3 (支持) mai...
  • 附加 : 1 (額外加上) add; attach 2 (附帶的; 額外的) additional; additive; attached; appended; append;...
  • 支撐 : 1 (抵抗住壓力) prop up; sustain; support 2 (勉強維持) support; prop up3 [建築] strut; brace; ...
  1. The following is some main content of this thesis : structure respect : a structure of parallel driven simulating table with three apex of right triangle supporting was proposed on the basis of use for reference many structures of simulating table. its movement postures of space and surtax movements are computered and analysed, and adopted matlab software perform dynamic simulation to it. the respect in machinery design : the structure of upper and subjacent platforms for simulating table were designed

    本論文從模擬轉臺的整體來考慮,對模擬轉臺的各個部分進行了研究和探討,下面是本論文的一些主要內容:結構方面:在介紹了多種轉臺結構的基礎上提出了採用直角三角形三點的並聯驅動模擬轉臺,對其空間運動姿態及運動進行了解算和分析,並採用matlab軟體對其進行了動態模擬。
  2. On this basis, the further research of anti - seismic of buckling restrained braced frame is performed. derive additional damping and influence of buckling restrained brace to column axis strength. example proved, as to concentrically braced frame, buckling restrained braced frame has better anti - seismic performance

    在此基礎上,將此種應用於框架中,對防屈曲框架的抗震性能作了進一步的研究,推導了防屈曲阻尼比以及防屈曲對柱軸力的影響,並且通過對一個算例進行非線性時程分析驗證了相對于普通中心框架,防屈曲框架具有更好的抗震性能。
  3. Base on the above work, again developing feature library serving the reducer box parts on the p1atform autocad which is used wdely by people, utilizing the developing tools objectarx and aatocad system which operates the entity in model to frame the 3d feature modeling system. during design a regular box parts, appending the manufacture and process information illto feature in company with modeling the products shape. it is commonly practical idea that operating feature instead of operating parts entity and local parts make products " information sttuctufe mect the requiremeni of essential information that the capp system need

    本文以目前廣泛使用的autocadr14為二次開發平臺,利用objectarx開發系統和alltocad平臺對體素的各種操作功能,在實體造型的基礎上創建產品的形狀特徵庫,開發應用實例規則箱體三維特徵造型cad系統,並在產品的設計階段,在完成產品的形狀設計的同時也完成產品的特徵信息的工作,以特徵操作取代傳統的基本體素的集合運算及局部操作,使對產品的信息描述能滿足capp系統的信息要求,具有一定的實用價值。
  4. If you need extra support, look for lacing systems that thread into reinforcements going down the sides of the shoe ; they ' ll provide added stability

    如果你需要額外,你可以找找編織系統,它們將線強編織進了鞋的側面;他們還提供了的穩定性。
  5. Now there ' re more attentions upon development, mechanics performance, computation module, dynamic analytic method of dampers at home and abroad for research on the energy - dissipation structures with viscous damped bracings, but research on conceptual design principles and additional damping ratio ' s determination are less and only localized in terms of the principle which restrict the expansion and application of the energy - dissipation earthquake - reduction technique

    國內外對粘滯阻尼消能結構的研究多側重於阻尼器的開發及其力學性能、計算模型、動力分析方法等方面,而對與實際工程應用直接相關的概念設計原則、阻尼比的確定等方面的研究則相對薄弱,一般僅限於原則性條款,這制約了消能減震技術的推廣應用。
  6. In respect of suspended ceiling : forming access panels as required including providing trimming and additional supports

    關于吊頂:按價格製作可觸嵌板,包括提供修邊和
  7. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的應力,對勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人