除灰門 的英文怎麼說

中文拼音 [chúhuīmén]
除灰門 英文
ash door
  • : Ⅰ動詞1 (去掉) get rid of; eliminate; remove 2 [數學] (用一個數把另一個數分成若干等份) divide:...
  • : Ⅰ名詞1 (物質燃燒后剩下的粉末狀的東西) ash 2 (塵土; 某些粉末狀的東西) dust 3 (特指石灰) lime...
  • : Ⅰ名詞1 (房屋、車船等的出入口 ) entrance; exit; door; gate 2 (形狀或作用像門的東西) switch; va...
  1. The student said " hello " to all of us when we met him. he was thin and his face was black, seems that he was undernourished. his father brushed the chairs with his sleeves immediately, asked us to sit down. his mother leaned the door with foolish smile all the time. it was even poorer of their family than our thought. the lime had started to come off as the wind and rain damage, the sunshine got through their house, shadow was remained on the sap of floor. two small rooms, a kitchen, a quadrate desk and some chairs here, there were not anything else ; the other one was bedroom, two beds were squeezed together. the bedding wasn ' t new any more and turned white, cotton was come out from the clothes. the only thing was what one old desk was cleaned well, it should be his book desk, there were some books on it

    那位學生見我們來了,高興地向我們問好.他看上去瘦瘦的,臉色黝黑,一副嚴重營養不良的樣子.他的父親趕緊用袖子在長凳上擦拭了幾下,笨拙地端給我們坐.他的母親一直倚著檻傻傻地笑.他的家比我想像的更窮.墻面上的石經不起風雨的侵蝕而紛紛脫落,陽光透過磚縫射進屋裡來,在坑坑窪窪的地面上留下一個個斑駁的影子.兩間小屋,一間是灶間,了一張方桌和幾張長板凳外,別無他物;另一間是臥室,兩張床擠在一起,被褥舊得發白,墊被連棉絮都露在外面.唯一整理的井井有條的是一張舊桌子,應該是他的書桌吧,上面整整齊齊放著幾本書
  2. The thesis comprehensively deliberates stochastic and fuzzy character of controlling the cost of engineering construction ; it takes quantitative analysis as the dominant factor, takes qualitative analysis as the secondary factor, establishes an comprehensive system of controlling the cost, and make various theories, the basic principles and the methods of engineering maths in the analysis and calculation of controlling the cost of engineering construction, such as effect theory, fuzzy maths, value engineering, grey system and system simulation. it also establishes the simple and effective practical model. on the basis of practical example, it puts forwards the train of thought and method to controls the cost of engineering construction in the different stage

    本論文綜合考慮了工程造價控制的隨機性和模糊性,以定量分析為主,定性分析為輔,構造了造價控制的綜合體系,將效用理論、模糊數學、價值工程、色系統、計算機模擬等多種理論及工程數學的基本原理和方法應用到工程項目造價控制的分析和計算中,建立了簡便而有效的實用模型,並結合工程實例,提出來了不同階段工程造價控制的思路和方法,針對不同的情況,綜合應用定性與定量的控制方法,消了以往工程項目造價控制只停留于項目實施階段的缺陷,提高了量化研究的水平和準確性,為政府建設管理部進行科學管理及各建設參與單位今後進一步改進自身的項目造價管理工作提供了寶貴的理論依據。
  3. The company adopts hot - water boiler and steam boiler , introducing into wet dust catcher, scrape - board removing ash machine and water disposing facility, and heating area achieves 140, 000 square meters, and all kinds of index arrives desire of environmental protection department

    公司採用熱水式鍋爐和蒸汽鍋爐相結合,引進濕式塵器、刮板機及水處理設備,供暖面積約14萬平方米,各項指標均達到環保部的要求。
  4. Air shower constrution can clean dust on person or goods, reduce dust capacity bring to cleanroom. and have switch function so as to avoid the no - clean air into the room from the door. cooperate with clean air - conditioner system, lnsure the cleanroom can get the clean class

    風/貨淋室可以清人身和物品表面附著的塵埃,減少帶入潔凈空氣的塵量,同時起到兼有氣閘室功能,可防止不潔凈空氣由侵入,以配合潔凈空調系統確保潔凈室達到所需潔凈度
  5. Clean - up operations include cleansing of more than 1 300 locations of " grey area " where the cleansing responsibility has not been designated to a single department in the past, clearing of over 200 hygiene blackspots, improving 30 back lanes in yau tsim, wan chai and tsuen wan, providing full - time toilet attendants to public toilets with daily usage rate of over 300 people and toilet paper to all public toilets, as well as removing illegal bills and posters in public places and enhanced evening street cleansing

    行動范圍包括清潔了超過1 300處以往沒有指定由那個政府部負責清潔的色地帶清理200多個?生黑點全面改善30條位於油尖灣仔及荃灣區的後巷為使用率每日超過300人次的公廁提供全職廁所事務員為所有公廁供應廁紙清在公眾地方非法展示的招貼及海報以及加強夜間街道潔凈服務。
  6. The main reason is as follows : dust in lifting rail is not removed clean ; lifting rail is not at a level ; the installation of low locator is not correct ; regulate screw in lifting wheel regulates too high

    趟動鈺感覺不顧滑,主要原因有:吊軌里的塵沒清干凈吊軌不夠水平下定位安裝不準確和吊輪調節螺絲調節過高造成。
  7. The united states department of agriculture is working to save the ash trees. so are agricultural departments and university extensions in a number of states. in some places, farmers are using detection trees. these have an area where bark has been cut away

    美國農業部正在努力工作去拯救樹.一些周的農業相關部和大學附校也在做相同的工作.在有些地方,農民們正在用探測樹.這些樹的有個地方樹皮是被去
  8. As important equipment in the ash removing system in power plants, valve needs fine components and advanced control method because of the sordid environment of the workshop

    作為火電廠系統中的重要裝置,由於車間環境惡劣,因而需要高標準的部件和先進的控制方法。
  9. Segmentation of chromosome : the chromosome image is segmented by the method of boundary gray level threshold and entropy algorithm based on genetic algorithm, then, after boundary smoothing and edge tracing, the chromosome position information is acquired. 2. diagnostic extraction of chromosome : on the basis of skeleton pixel after thinning, the medial axes are obtained by the orthogonal approximation

    主要研究內容如下: 1 、染色體圖像分割:採用基於邊界度的限演算法和基於遺傳演算法的熵演算法來尋找染色體圖像二值化需要的分割閾值,對分割后的圖像存在的噪聲分別採用內插來置換和邊界跟蹤來消; 2 、染色體特徵提取:採用細化技術將染色體細化一些離散的骨架點,用插值方法獲得平滑的曲線染色體中線。
分享友人