階段排序 的英文怎麼說

中文拼音 [jiēduànbèi]
階段排序 英文
phase sorting
  • : 名詞1. (臺階) steps; stairs 2. (等級) rank 3. [醫學] (耳蝸的三個螺旋管的任一個) scala 4. [數學] order 5. [地質學] stage
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • : 排構詞成分。
  • 階段 : stage; phase; period; gradation; bench
  • 排序 : collate
  1. When solving the tna problem based on fleet dispatching commands, a stage - assignment algorithm is build to overcome the defect of fifo algorithm, which can be widely applied to cope with fixed job scheduling problem. 3

    在解決基於飛機調度指令要求的飛機班問題時,本文提出的分指派演算法較好地克服了標號演算法的缺陷,該演算法能普遍地應用於處理類似的固定工件問題。
  2. We notice from the first stage consultation that the public generally perceived that settling disputes through the existing channels usually involves high legal costs and lengthy litigation procedures

    而第一諮詢結果顯示,公眾普遍認為透過現有途徑解糾紛,往往涉及高昂的法律費用及冗長的訴訟程
  3. As the upgrading works are done in phases, pray for smooth allocation and reallocation of the classrooms

    施工程是分進行,求神引導在過度期間,課室的安能順利解決。
  4. But just like other theory, because the real economic is too complexity, the " financial depth theory " is not perfect too. in order to fetch up its shortage, we do two works : the first is analyse the characters of the efficiency financial system through the dynamic economic growth model, the second is to analyse all kinds of critical theory to " financial depth theory ". based on this, finally we defined the content involved by this paper, which includes two parts : the first part is to review the characteristics and macroeconomic performance of china ; the second part is to analyze the feature and performance of china ' s financial depth based on the " financial depth theory ". for this, we will investigate the macro sects and the each measures in the same time. the third part is to analyse the financial structure and the financial risk which is the other index to measure the performance of financial depth

    但是作為經濟增長理論的一個分支,金融深化論對金融與經濟增長關系的考察也有不完善之處。為彌補不足,在本部分內容當中,分析了動態經濟增長模型所展現的有效率金融體系所應具有的特徵以及對金融深化論的各種批評理論。在總結上述分析的基礎之上,最後對本研究所涉內容做了這樣的界定:一是從總體上考察我國金融深化的特點與宏觀經濟績效;二是從麥金農的金融深化實現路徑次出發,對金融深化不同的經濟環境狀況及其經濟績效進行具體分析;三是做為對上述研究不足的補充,對金融深化與金融結構以及金融深化與金融風險的關系進行了考察。
  5. A high - quality operative plan should focus on the important tasks, organize car flow into all kind of trains according to the demands of the marshalling plan, ensure that all departure trains leave station on time, schedule exactly the decomposing and marshalling of all trains and suitably arrange all trains to occupy the arrival and departure lines

    一個好的計劃應該反映出本的工作重點,並按照列車編組計劃的要求,把車流及時編成各種列車,保證本的所有出發列車都能正點發車,並能合理地安列車解編順以及利用到發線接發列車。
  6. In optimal decision model : ( t ) nine main environmental impact indexes are summarized and qualmed from the main aspect of environmental impact of road construction based on the principles of comparability and measurability ; ? calculate each index with analytic hierarchy process, and introduce the concepts of educing matrix and absolute coincidence matrix to adjust judgment matrix in order to meet with satisfactory consistency ; ( 3 ) introduce the distance to calculate the weight of expert ; ? analyze the relationship coefficients with gray relationship method, then integrate the weights of indices and experts with them to obtain the compositor of ail of the schemes

    在方案優選模塊中:針對公路建設中環境影響評價滯後於公路建設的現象,將環境因素的影響提到設計,並對環境指標進行了重點分析,提出了用於比選的9個定量指標;採用層次分析法確定各級指標的權重,並對判斷矩陣予以修正;引入距離測度的概念解決各專家的權值問題;運用灰色關聯法分析各指標的關聯系數,並結合指標權重、專家權重,最終得到各方案的關聯度優劣
  7. " unlike the conventional approach procedures, aircraft on cda will be arranged to approach from a higher altitude and descend continuously to join the final approach flight path for the runway being used

    該處發言人說:持續降落模式與傳統進場程不同,採用新模式的航機會安在較高的飛行高度進場,然後持續下降至航道之最後進場
  8. A 1 / 7 - scale model of three - bay, three - span frame - bent r. c. structure is the first and the largest size in the same testing field in china by now. following studies are chiefly conducted in this chapter : the mechanism behavior of the structure under horizontal earthquake load, including the characteristics of seismic force, the deformed performance, yielding sequence, energy dissipation capacity etc. ; the changing rule of the dynamic characteristics and the stiff degrading in different experimental stages ; the location of the weak stories and the seismic capacity of the structure

    在試驗中主要研究了以下內容:在水平力作用下框架結構的整體變形能力以及各層的層間變形的大小;框架結構在不同的動力變化規律;框架柱的變形和承載能力;錯層對結構性能的影響、模型結構裂縫開展過程及塑性鉸形成的先後順、不同該結構的剛度退化規律及滯回耗能特性等。
  9. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程,以此作工具對滑裂面的后移、土釘錨固的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程ansys分別對採用土釘支護的一邊坡、二邊坡進行分析,重點是研究各土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下邊坡在土釘軸力方面的相互作用,得出了有關第一土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二邊坡臺寬度的合理確定、二開挖及支護比一時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及墻背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  10. As ' to the front end, this thesis does n ' t use the method of syntax directed semantic analysis. instead, it arranges syntax analysis and semantic analysis into different stages in virtue of the equal description of source program. as to the back end, it selects the scheme that a virtual machine executes the intermediate code through interpreting

    在對語言編譯器即語言實現方面的研究中,論文總結了編譯器的一般模型,並針對其前端和後端分別選擇了合適的實現方案:前端沒有採用語法制導的語義分析,而是通過對源程等價表述的引入將語法分析和語義分析安到不同進行;後端選擇了用虛擬機對中間代碼解釋執行的實現方案。
  11. And the effect of the work order of the two propellant units to the performance of the trajectory and the matching conditions to obtain the theoretical optimum trajectory is discussed too. according to the ballistic speciality of a hybrid base - bleed - rocket extended - range projectile during base - bleed and rocket work, its physical parameter is non - constant, such as its mass position of mass centre polar and equatorial moment of inertia. after a mulriple ballistic model of constant physical parameter is established, a mulriple ballistic model of continuous and non - continuous physical parameter is educed and the program is compiled, the theoretical tool is constructed to study othe other pivotal technology of a hybrid base - bleed - rocket extended - range projectile

    本文根據底?火箭復合增程彈其底燃減阻和火箭助推的質量、質心位置、轉動慣量等結構特徵參量變化的彈道特徵,在建立底?火箭復合增程彈結構特徵參量為不變常量的多元彈道計算模型基礎上,導出了結構特徵參量為連續變化量和非連續變化量的底?火箭復合增程彈多元彈道計算模型,編制了相應的計算機數值分析程,構建了研究底?火箭復合增程彈其它關鍵技術的理論工具。
  12. Take a broad view of the legislation and practices with the administration of justice in some western main countries governed by law for the guarantee measures of ciminal suspect s right of defense from the procedure of investigation, there are some differences in excluding rule of evidence, the lawyer ’ s right and the criminal suspect law aid, etc. however, the main countries governed by law above generally approve the criminal suspect enjoys the right of denfense during the course of investigation and has all stipulated the comparatively detailed guarantee measures to this kind of right

    綜觀一些西方主要法治國家的立法規定與司法實踐,英美法系國家和大陸法系國家對于偵查程中犯罪嫌疑人辯護權的保障措施,分別在證據除規則,辯護律師的權利以及犯罪嫌疑人的法律援助等方面呈現出一些區別。但是兩大法系主要法治國家普遍地認可犯罪嫌疑人在偵查享有辯護權,而且對這種權利都規定了較為詳細的保障措施。
  13. Generally, the protein - protein docking procedure is composed of four stages : searching of the binding modes of the receptor and the ligand, filtering of docked modes to eliminate the irrational docked structures, optimizing the structures, evaluating the docked modes with the refined scoring function and ranking them to obtain the near - native structures

    通常,蛋白質蛋白質分子對接包括四個:搜索受體與配體分子間的結合模式,過濾對接結構以除不合理的結合模式,優化結構,用精細的打分函數評價、對接模式並挑選近天然構象。
  14. A study on modeling, scheduling and optimal control problems for a class of hybrid manufacturing systems is investigated. in this framework, the discrete entities have a state characterized by a temporal component whose evolution is described by event - driven dynamics and a physical component whose evolution is described by continuous time - driven dynamics, thus it is a typical hybrid system. not only the optimal control for manufacturing process like that discussed in many references but also the optimal machining sequence are considered in this paper. the whole problem is solved by a two - level optimization method : at the inner loop, for any given machining sequence of the jobs, the optimal control for manufacturing process is considered ; while at the outer level, an improved genetic algorithm is used to decide the optimal machining sequence of a batch of jobs to be processed. finally, some examples are given to illustrate the validity of the algorithm

    研究了一類單混合製造系統的建模、分析與調度問題,這類系統既包含離散事件動態,也包含連續時間動態,前者用隊網路描述,後者用微分方程描述.不僅考慮了a這類系統的最優控制問題,而且考慮了工件進入生產線的最優時間,並用一個復雜的優化模型描述,同時給出了一個兩層優化方法,內層給出對給定工件列的最優控制,而外層用一改進的遺傳演算法求解工件進入生產線的最優時間列.若干模擬實例說明了演算法的有效性
  15. Based on a systematic investigation on the predatory natural enemy community in cotton fields to the north of the huaihe river of anhui province, the methods of polar ordination ( po ) and fuzzy cluster analysis ( fca ) were employed to study the dynamic classification of predatory natural enemy community in cotton fields and the method of principal component analysis ( pca ) was employed to study the major stages of change of predatory enemy community in cotton fields during the process of cotton growth and development

    摘要在對安徽省淮北棉田捕食性天敵群落進行系統調查的基礎上,採用極點和模糊聚類分析方法,研究了棉田捕食性天敵群落的動態分類;採用主成分分析方法,研究了棉田捕食性天敵群落在棉花生長發育過程中演變的主要
  16. In chapter 6, in order to use the preference information adequately in concept evaluation, the quality level of concept is introduced. consider the uncertainty in the stage of concept evaluate, the definition of concept risk is given in the view of satisfied requirement. and the multiform formulae of risk are analyzed

    第六章引入了方案質量水平的概念作為方案優選的指標;針對設計方案評價的不確定性,首次從能否滿足需求的角度提出了方案不能滿足需求的風險性的概念,並給出了各種情況之下方案不能滿足需求的風險性的數學描述;進行方案時,分考慮評價者對風浙江大學博士學位論文險性的心理界限和不考慮心理界限兩種情況進行討論。
  17. Firstly, based on the development history and characteristics of stock market the thesis looked back the development history and characteristics of every stage of chinese stockjobbers laid stress on the business development and risk management. secondly, the thesis analyzed the existing comprehensive evaluation method and choosed or model of data envelopment analysis as evaluation model. then we analyzed the deficiency of ( 7r model and established two new model - average value model, go model and its corresponding projection model - which were used to evaluating and sequencing fourteen comprehensive stockjobbers and draw a conclusion based on computation result of the three models

    本文首先以我國證券市場發展歷史及特點為基礎,回顧我國證券公司發展歷程及各經營特點,主要分析證券公司業務發展和風險管理狀況;其次,對證券公司現有評價方法進行研究,選擇數據包絡分析( dea )的c _ 2r模型作為對證券公司進行評價的數學模型,針對c _ 2r模型時存在的並列第一和零權重問題,提出均值模型、 g _ 0模型及相應的投影模型,並對三種模型的計算復雜度進行了討論;第三,選擇14家綜合類證券公司進行實證研究並對三種模型的計算結果進行了對比分析;最後,簡要總結2001年證券市場狀況並對證券公司今後面臨的機遇和挑戰進行了分析。
  18. You show dependencies by ordering the inserted projects logically ( for example, phase 1 before phase 2, and so on ), placing them at the correct outline level ( for example, subphase a under phase 1 ), and linking individual tasks between projects to show scheduling dependencies ( for example, task 9 in phase 1 must finish before task 6 in phase 3 can begin )

    顯示相關性的方法是:將插入的項目合乎邏輯地(譬如1在2之前等等) 、將它們置於正確的大綱級別(譬如子a在1之下)以及鏈接項目間的各個任務以顯示日程的相關性(譬如,1中的任務9必須在3中的任務6開始之前完成) 。
分享友人