隧洞 的英文怎麼說

中文拼音 [suìdòng]
隧洞 英文
tunnel隧洞分岔段 tunnel fork; 隧洞漸變段 transition region of tunnel; 隧洞掘進機 tunnel boring machine; 隧洞運渣車 jumbo
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  1. Based on the modern design theory of tunnels construction that the adjoining rock be regarded as primary load - bearing structure, this thesis have made researches on the stability of tunnels mother rock and the safety of support pattern under the high external waterpressure and high geostress

    這就使本隧洞工程的建設面臨著極大的挑戰。本文是在將圍巖作為主要承載結構,支護與圍巖共同作用的現代隧洞設計理論的基礎上,來研究高外水壓力及高地應力下隧洞圍巖穩定性及支護結構安全的。
  2. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    計算結果表明,如果能使錦屏工程引水隧洞灌漿圈圍巖具有較好的防滲性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的支護結構以及排水措施,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。
  3. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。
  4. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  5. If the character of wall rock is finer, it is smaller for suffered force and distortion of tunnel pipe liner structure, contrarily it is bigger

    性態好的圍巖,隧洞襯砌的受力和變形較小,反之則較大。
  6. The high geotectonic stress at the construction region and the activity subsurface water will have important effects on construction and operation

    隧洞施工穿越高地應力區,且施工區活躍的地下水對隧洞施工及日後的安全運行有著重要的影響。
  7. Tunnel construction is very difficult hi region with high geotectonic stress and high subsurface water pressure. few deep - lying tunnels are constructed in civil conveyance and hydropower engineering up to now

    特別是對在高地應力、高地下水位區域的隧洞建設,其施工難度更大,在國內的水利水電工程建設中並不多見。
  8. Excavation of tunnel will lead to local geotectonic stress release and redistribution around tunnel ; the appearance of new outlet boundary will lead to outlet seepage of subsurface water and the change of mountain seepage field

    隧洞開挖將引起局部地應力的釋放及周附近的地應力的重新分佈;隧洞開挖后新的出水邊界的出現將導致地下水的大量出滲及山體滲流場的改變。
  9. Due to complex and varied geological conditions for 4 headrace tunnels at zipingpu project, real time monitoring technique was used during informatization construction according to new austrian tunneling method, system observation for typical sections was conducted by following in - situ construction, based on which inverse analysis for rock mechanics parameters was conducted

    針對紫坪鋪工程4條引水發電隧洞復雜多變的地質條件,採用新奧法隧洞信息化施工中倡導的實時動態監測技術,跟蹤現場施工進行了典型斷面的系統觀測,在此基礎上進行了圍巖宏觀力學參數的反分析研究。
  10. In the process of construction, some special geological hazards will be met because of the great depth and long distance, such as high external waterpressure, watergushing, high geostress, rockburst, high geotemperature and nocuous gas and so on. these geological hazards become the main restricted factors of tunnel construction

    大埋深將使隧洞開挖施工時遭遇到如高外水壓及高壓涌水、高地應力及巖爆、高地溫、高瓦斯有害氣體等一系列地質災害問題,這成為制約深埋隧洞建設快速發展的主要因素。
  11. But to deep - lying diversion runnel, there are a lot of problems to be resolved not only hi design theory but also in techniques

    然而對深埋引水隧洞,無論是設計計算理論,還是施工建設技術,都處在探索階段。
  12. The key technique of this project is the design and construction of four deep - lying long runnels. their length, diameter and maximum bury - depth are 18 km, llm, 2500 m

    這一工程的關鍵技術是四條長達18公里、開挖徑11米、最大埋深2500米左右深埋長隧洞的設計和施工。
  13. Above all, during the research of the automatic of hydrotechnics designs, the author has successfully developed the cad software autosd for hydraulic runnel design, and realized the function of immediate interpose among program and relief maps and the overall process computer aided function during the hydraulic tunnel design

    總之,本文通過對水工設計自動化的研究,成功開發出水工隧洞輔助設計軟體autosd ,並首次實現在軟體運行時與地形圖的即時交互和反饋功能,實現了水工隧洞設計全過程的輔助設計功能。
  14. Construction of long tailrace tunnel bifurcation concrete structure for dachaoshan hydropower station

    大朝山水電站長尾水隧洞岔管混凝土施工
  15. The impacts of both the velocity head and momentum distribution in the t - junction of a tailrace surge tank on the critical stable sectional area of the tank were analyzed by using gardel ' s empirical equations for t - junction flow. based on thoma ' s theory, a formula of the critical stable sectional area is derived. 5

    基於gardel關於三通管水頭損失的經驗公式,研究分析了連接管處的速度水頭以及進出調壓室水體與尾水隧洞水體之間的動量交換,對有連接管的尾水調壓室穩定斷面積的影響,並在托馬( thoma )假定基礎上,推導出相應的調壓室穩定斷面的計算公式; 5
  16. The application of tbm construction method in 7 tunnel of connection section of yellow river diversion project

    萬家寨引黃北干線1號隧洞出口段優化設計
  17. Using artificial neural network in identification of mechanics paraneters of tunnel ' s wall rock

    人工神經網路在隧洞工程圍巖力學參數識別中的應用
  18. Origin and treatment of water - diversion tunnel down fall at xiawenyang waterpower station

    下溫洋電站引水隧洞塌方的成因分析與處理
  19. Structural analysis for the liner and surrounding rocks of diversion tunnel in jinping waterpower station

    錦屏二級水電站深埋引水隧洞襯砌及圍巖結構分析
  20. Heat insulating measures of aqueduct during construction of dalian diversion water from biliuhe reservoir

    大連市引碧北段玉皇廟隧洞工程的施工管理
分享友人