隧谷 的英文怎麼說

中文拼音 [suì]
隧谷 英文
tunnel dale
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : 谷名詞1 (兩山或兩塊高地中間的狹長而有出口的地帶) valley; ravine; gorge 2 (姓氏) a surname 3 ...
  1. The ent contract include the following major items : construction of 0. 5km long at - grade tunnel approach within butterfly valley

    A在蝴蝶內建造一條長零點五公里的道引道
  2. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽道; (二)一條長5 , 500碼的引水道,可連接水塘道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。
  3. Through strange and provocative dreams, jack sees himself reincarnated as meng yi, a general who fell for the first emperors beautiful consort ok soo starring kim hee seon some 2000 years ago

    Jack乘直升機到酈山上空,冒險跳入峽中的瀑布,情景一如夢境另方面william一直藉助高科技儀器尾隨跟蹤,二人同時闖進一條通往懸浮天宮的道!
  4. First, on the base of investigating geleshan geologic environments, the author carefully analyzes them, studies their water storage structure, discusses the relationship of underground water dynamic changes and tunnel drainage by desiccation ; secondly, the author makes the dynamic analysis, regression analysis, routine hydrochemistry analysis, isotope analysis, so draws to guan - yin gorge anticlire east and west slot ' s karst developing features, alternated conditions underground water and supplying drain ways ; thirdly, by stating the fissuring ' s surveying data, the author calculates the seeping tensor

    作者在進行歌樂山地質環境調查的基礎上,仔細分析了大量觀測資料,研究其儲水構造,掌握地下水動態變化與道施工涌水的關系,及補給受降雨的影響情況。對道周圍的地下水進行動態分析、回歸分析、常規水化學分析以及同位素分析,得出觀音峽背斜東西翼槽的巖溶發育特徵,及地下水的循環交替條件、補給排泄途徑;統計分析裂隙測量數據,計算滲透張量。
  5. Depending on how the ground surface is denuded, the feature of the current crustal stress field and rock stress environment can be calculated analyzing the result in this paper : by analyzing the recovering feature of the elastic deformation of the rockmass in unload - stage under various pressures, it has been found there is close relationship between the recovering degree of the elastic deformation of the rockmass and the unloading degree of the pressure the direction of the major principal stress in the crustal stress field is not consistent with the direction of the crushing stress regional tectonics borne during the last tectonic movement. the evolving degree of the regional geomorphology evidently affects the current crustal stress field, which changes from the self - weight stress field to the horizontal stress field, with the changing of the eroding degree of the regional geomorphology ranging from valley area to hilly country to flat country. in valley area, where there is two stress belts, the bankslope s tress belt and the self - weight stress belt within the mountain. the direction of the major principal stress is nearly parallel to the ground surface and inclines towards the valley in the bankslope stress belt. it is nearly vertical in the self - weight stress belt

    通過本文的研究成果,根據區域性地貌的演化特徵,我們可以大致地對現今地應力場進行判斷:在分級卸荷條件下,巖體中彈性變形的恢復具有明顯的規律性,這種規律對于研究地應力場的演變是有幫助的;地應力場中最大主應力方向與區域構造形跡在最近的構造運動中所受區域性擠壓應力的方向無明顯的對應性;區域性地貌形態的演化程度對現今地應力場的特徵具明顯的影響,隨著區域性地貌侵蝕程度由峽區、丘陵區、平原區的變化,現今地應力場特徵由自重應力場、水平應力場為主含少量自重應力場特徵向水平應力場的規律變化;在峽區,山體中具有兩個應力帶:自重應力帶和卸荷應力帶,最大主應力方向在卸荷應力帶中近平行於坡面並傾向于河、在自重應力帶中近於直立;根據原始地面遭剝蝕的程度,可以大致地估算最大主應力和中間主應力的量值和方向;在丘陵區和平原區,最大主應力的方向近於水平,並與附近區域性侵蝕盆地和河流的展布方向基本平行,根據原始地面遭剝蝕的程度,可以大致估算其最大主應力的量值;根據區域性地貌形態的特徵來分析工程區的現今地應力場特徵,並進而大致了解巖石的應力環境,這種分析方法得出的結論與許多實際的地應力測試成果基本一致,對于大型水電工程地下廠房和壓力洞的設計是有所幫助的。
  6. Lion rock tunnel road ( south bound ) near chainage 16. 45 ( hung mui kuk )

    獅子山道公路(南行)鄰近路段16 . 45號(紅梅
  7. Journeys may be diverted via tai po rd, lion rock tunnel road, che kung miu rd, hung mui kuk rd & lion rock tunnel rd non - stop depending on traffic condition

    巴士路線可能因應交通情況而改經大埔道、獅子山道公路、車公廟路、紅梅路及獅子山道公路,中途不停站。
  8. The spokesman also stressed that parking would not be permitted along sha tin tau road, chui tin street and a section of che kung miu road between lion rock tunnel road and hung mui kuk road

    發言人強調,車輛不得停泊在沙田頭路、翠田街及介乎獅子山道公路與紅梅路的一段車公廟路。
  9. The tai tam reservoir was situated higher than the tai tam intermediate reservoir. similarly, the latter was situated higher than the tai tam tuk reservoir. for these reasons, water stored in the tai tam tuk reservoir must be pumped upwards into the foothills of the tai tam valley in order to reach the tunnel portal of the tai tam reservoir, where water would gravitate to the supply system in central

    無論是第一期或第二期的擴建工程,建造水壩都是工程的基礎,而建立抽水系統亦是重要一環,因大潭中水塘的水位比大潭上水塘低,大潭篤水塘更處于較大潭中水塘低的地,故大潭篤的存水必須依靠抽水機,才可運送至大潭水塘的輸水道,再經由大潭水塘輸送系統,調配至中區濾水系統經過濾后,才可供市民飲用。
  10. It was very cloudy when we got to kangding after we got through the 4 kms long erlangshan tunnel and drove along the dadu river in july that year

    那年七月的某一天,當我們穿過二郎山道,沿著大渡河到達康定的時候,天空依舊灰濛濛的,還看不出一絲要放晴的跡象來。
  11. Connecting with the situation of the hanguguan tunnel construction in zhengxi passenger special line, this paper expounds the construction principles, construction methods and the items that should pay attention to in the construction of the heavy section and collapsible loess tunnel

    結合鄭西客運專線函道施工情況,簡述了特大斷面濕陷性黃土道的施工原則、施工方法以及施工中的注意事項。
  12. To meet the peaking need of the grid and improve the source structure of the system, it is necessary to construct the mass pumped storage power station. and more high pressure tunnels will be constructed

    大規模抽水蓄能電站的建設是現代電網的必然產物,它在電力系統中起調峰填作用,提高電網運行的靈活性和可靠性;相應高水頭大直徑水工壓力洞的建設也逐漸增多。
分享友人