隧道建設 的英文怎麼說

中文拼音 [suìdàojiànshè]
隧道建設 英文
tunnel construction
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented

    摘要針對甘肅黃土區的自然條件,依據該地區已黃土及軟巖公路滲漏水調查情況和鐵路隨涌水狀態分類,運用工程類比法提出適合該地區公路防排水結構計的涌水類型劃分及對涌水類型校核與細分的三種方法。
  2. This paper has described the authors experience acquired in applying the ground - penetrating radar, rayleigh wave and dpt to examining weak groundsill in the subway tunnel, and also discussed the application conditions of these means as well as their merits and shortcoming

    摘要介紹了在地鐵工程中使用探地雷達與瑞雷波法結合輕便動力觸探技術檢測軟弱地基的經驗和幾點認識,並討論了該勘察方法的應用條件和優點。
  3. Strip - shape underground structures such as the tunnels and tubes for various uses can be treated as a beam on elastic foundation under earthquake condition , although there exists soil - structure interaction , the foundation soil vibration is dominant in other words , analysis of earthquake response of the soil is essential to this end , simplified models , ( i. e equivalent mass system models based on some equivalence criteria ) are proposed , instead of a general 3 - d continuum model in this study , equivalence criteria are proposed and the simplified models are compared the single - mass - string model is proved to be valid and therefore applied to the analysis of earthquake response of the pearl river immersed tunnel

    條裝地下結構如、各種埋等一般可看作彈性地基梁進行靜力及動力分析在地震條件下,結構與土相互作用,但土的振動成為主要因素為分析土的地震響應需把基土這一三維連續體作簡化處理,簡化成為等效多質點模型本文著重探討這種簡化模型的立方法,推導等效方程,通過幾種簡化體系的分析比較,論證單質點串體系的合理性,並將其應用到廣州黃沙芳村珠江水下工程的地震響應分析,為抗震計提供依據
  4. According to the amended industrial catalog guiding foreign investment approved by the state council at the beginning of this year, all railway projects, including manufacturing of railway transport equipment, and construction and management of feeder lines, local railways, and related bridges, tunnels and ferries, fall into the category encouraged by the state

    根據國務院批準、今年初實施的《外商投資產業指導目錄》規定:所有的鐵路項目如鐵路運輸備製造、支線、地方鐵路及其橋梁、、輪渡施的和經營,都屬于鼓勵范圍。
  5. Umt project in the existing aerical defence tunnel of haerbin

    哈爾濱市利用既有人防隧道建設交通的適用性研究
  6. The total length of road, the length of good quality highway, number of the bridges and tunnels are all increased and increasing remarkably

    近十幾年來,通車里程迅速增加,技術等級大幅度提高,公路橋梁和隧道建設取得顯著成果。
  7. Therefore, ventilation in a road tunnel becomes extremely important. until now, our investigation and research in this field is far behind abroad, and is badly hindering the tunnel construction

    我國對通風的研究比較晚,而且水平遠遠落後于國外,已經成為制約我國隧道建設發展的瓶頸。
  8. Created by renowned developer sun hung kai properties limited to blend traditional quality with a modern lifestyle, millennium city club is close to the mtr, within easy reach of the eastern harbour and tate s cairn tunnels and has ample parking

    會所由著名發展商新鴻基地產有限公司興,融匯傳統高質素與現代化生活格調,鄰近地鐵站,交通便利,更可直達東區及大老山,另有大型停車場,以供使用。
  9. Qinling mountains tunnel is our country ' s longest single track railway tunnel at present, in first of similar specialty tunnel of asia, occupying front row too in the specialty tunnel of the world, it is the milestone of the railway tunnel of our country

    秦嶺是我國目前最長的單線鐵路,為亞洲同類山嶺特長之首,在世界特長中也居於前列,是我國鐵隧道建設史上的里程碑。
  10. This paper summarizes the actuality and success in construction of such tunnel and has an analysis on problems to be solved

    由此,本文總結了小凈距隧道建設的研究現狀及取得的研究成果,對有待解決的問題進行了分析。
  11. This paper sets forth and analyzes the construction method and technics of uniting arch tunnel by introducing xiang - shi highway unite arch tunnel project

    本文以襄十高速公路聯拱隧道建設工程為依託,對的施工方法與工藝進行了闡述和分析。
  12. Therefore, ventilation in a fire emergency in a roadway tunnel becomes extremely important. until now, our investigation and research in this field is far behind abroad, and is badly hindering the tunnel construction

    國外對于公路火災情況下的通風問題的研究十分重視,而國內這方面研究極少,水平遠遠落後于國外,已經成為制約我國隧道建設發展的瓶頸。
  13. Combined with the engineering practice of small interval tunnel in china, this paper points out its five key technology problems : its concept, reasonable clear interval, support parameter, construction method and strengthening technology for the shamed surrounding rock

    摘要結合國內小凈距隧道建設現狀,筆者認為其計施工關鍵技術主要在於小凈距隨的合理凈距、支護參數、施工方法、中夾巖加固技術等。
  14. As a result of its unique island country geographical characteristics and in order to promote the economic and social development, large - scale construction of cross - sea bridges and submarine tunnels was carried out by japan after the second world war, which linked up the traffic between the four main islands of the country

    摘要日本由於島國的獨特地理特徵,為了促進其經濟和社會的發展,在二戰之後進行了大規模的跨海橋梁以及海底隧道建設,從而實現了四大主島陸路交通的聯結。
  15. For adapting the new situation of highways building, developing and improving ceaselessly technique levels of highway building, it is quite important to improve technique levels of highway tunnel building to reach the quantitative levels of synthesizing theory analysis, experience judgment, monitor measure and computer technique, by extracting experience of internal and overseas highway tunnel building, and integrating internal highway tunnel practice

    為適應公路新形勢,不斷發展和提高公路的技術水平,吸取國內外公路隧道建設經驗,結合國內公路隧道建設實際,將公路隧道建設提高到理論?經驗?信息資料與計算機技術相結合的綜合集成定量化水平是十分有意義的。
  16. So far, 24 kilometres of large tunnels under the central urban area and a sewage treatment works at stonecutters island, providing chemically enhanced primary treatment for up to 3. 5 million cubic metres of flow per day, have been commissioned

    到目前為止,市區中心地帶已成24公里長的大型污水,而于昂船洲的污水處理廠亦已啟用。該污水處理廠採用化學輔助一級污水處理方法,平均每日處理的污水流量多達170萬立方米。
  17. Some key technical problems about construction method, vehicle velocity and clearance of the tunnel scheme were discussed according to the geographical location, engineering geological conditions, request of the harbor entrance and shipping, localization of the tunnel and some principal technical criterions

    根據泰州公路過江通的地理位置、工程地質條件、港口航運要求、通工程定位以及工程的主要技術標準等,對泰州公路過江方案的隧道建設方法、行車速度和築限界等若干關鍵技術問題進行了分析論證。
  18. In home and aboard case history, it had mainly depended on the experience of technical staff concerned quite a long time ; the development in areas of geo - techniques and measurement technique, database management technology and computer - aided design technology etc has pushed tunneling into " observational method ( hereinafter referred to as om ) era "

    在中外隧道建設歷史上,很長一段時期主要依賴工程技術人員的工程經驗;新奧法誕生以來巖土理論及量測技術、數據庫管理技術、計算機輔助計等方面的發展,使施工跨入了「信息化」時代。
  19. With the advancement of metro construction, the structure forms of metro stations and linking tunnels have much varied. the sizes of them become increasingly larger ; complicated geologies and existing buildings have been repeatedly encountered in the process of metro construction, so construction technologies has correspondingly gained much progress, and have been innovated, in which many new construction methods have been successfully implemented in situ. the cavern - pile method for shallow buried underground excavated tunnels is one of them

    隨著地下鐵的發展,地鐵車站和區間的結構形式多樣,規模越來越大,遇到的復雜地質條件和既有(構)築物越來越多,施工技術也隨之不斷進步,不斷創新,提出了許多新的施工方法,淺埋暗挖洞樁法就是其中很有代表性的一種。
  20. A major deep tunnel collector system and treatment works were designed to handle sewage generated from all districts around the victoria harbour area. so far, 24 kilometres of large tunnels under the central urban area and a sewage treatment works at stonecutters island, providing chemically enhanced primary treatment for up to 3. 5 million cubic metres of flow per day, have been commissioned

    政府根據污水處理策略計了一個大型的深層污水收集系統和污水處理廠,處理維港范圍附近各區所產生的污水。到目前為止,市區中心地帶已成24公里長的大型污水,而于昂船洲的污水處理廠亦已?用。
分享友人