隧道挖掘機 的英文怎麼說

中文拼音 [suìdàojué]
隧道挖掘機 英文
tunnel excavator
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : 動詞(刨; 挖) dig
  • : machineengine
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  • 挖掘 : excavate; unearth; dig; tap; grub; hoe; grave
  1. In order to facilitate selection of tbms in a project based on engineering geology and hydrogeology conditions, project characteristics and environmental constraints, it is necessary to understand the operation mechanisms of different tbms and classify them accordingly

    本文介紹了各種類型的全斷面的運行理,並根據最終開斷面,掌子面的支護類型及巖土體的破碎理對全斷面進行分類。
  2. Herrenknecht ag with its head office in germany is the leading company in the global market for the mechanical tunnel systems

    德國海瑞克公司是世界上最先進的隧道挖掘機製造公司之一,集研發、生產和銷售於一身。
  3. Roadheader is a part profile tunnel boring machine which can excavate, convey rock blocks and walk by itself. it is very suitable to excavate soft - rock tunnel

    臂式是一種集開、裝碴和自動行走於一體的部分斷面,它非常適用於軟巖進。
  4. In this paper, it is studied and analyzed characteristic of stress, distortion etc. of pipe liner structure combining dahuofang transport water tunnel practice project, tunnel boring machine construction, and it is considered that affects internal force of pipe liner for early stress of underground structure and digging load. in nonlinear finite element calculation model, folium cells have been simulated among pipe liner and pipe liner and wall rock. under varies load condition, it has educed that changing rule of stress, distortion and load characteristic pipe liner in kinds of wall rock tunnel by analysis and calculation

    本文結合實際工程,分析研究了大夥房水庫輸水工程在採用施工方法的情況下,利用管片襯砌的結構應力、變形等受力特性,考慮地下結構初始應力和開荷載對襯砌內力的影響,採用薄層單元模擬襯砌管片之間、襯砌管片與圍巖之間的非線性有限元計算模型,通過分析計算得出不同荷載工況下各類典型圍巖段襯砌管片受力特徵、應力和位移變化規律。
  5. Severe protests from local residents living along mrt routes during the route alignment coordination caused a two - year delay to the proposed schedule for the hsingchuang line. therefore, to reduce the extent of tunneling is a key consideration in the long - term planning of mrt routes. other downsides to the single tunneling method are that it requires longer construction time, and that two break throughs from the tunnel to the work shaft involve a higher construction risk

    另因採用單孔潛盾須鉆上、下行,除施工時程較長外,且兩次破鏡將增加施工之風險,故有鑒于潛盾之技術日新月異,國外已有採用多圓形潛盾工法( mf工法)之成功案例,此除可減少用地徵收補償之困擾外,且可減少面積進而減少棄土所造成之問題。
  6. At present, the level of mechanization and automation of tunnel boring machines ( tbm ) has been improved significantly, and tbms can be designed to excavate tunnels with different shapes under different geological conditions

    摘要目前,械化及自動化水平得到了很大提高,可以開不同的地質條件下各種形狀的
分享友人