隧道道坑法 的英文怎麼說
中文拼音 [suìdàodàokēngfǎ]
隧道道坑法
英文
drift method- 隧 : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 法 : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
- 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
-
This paper is based on the construction of jiangbei airport station of the chongqing no. 3 light railway, the control demolition applied to shallow covered and large foundation pit excavation under urban complicated condition is introduced
摘要以重慶輕軌三號線江北機場站為例,介紹了城市復雜環境條件下淺埋隧道、大基坑開挖控制爆破施工方法。Combining the study characteristic and the current construction method of the bi - arch tunnel in domastic and aboard, the paper deeply study the three heading construction method and the benching tunneling construction method
結合目前國內外對雙連拱隧道的研究特點以及國內外對雙連拱隧道施工方法的現狀,本文針對三導坑法和上下臺階法進行了較為深入的研究工作。The paper introduces the progress and the statue quo of tunnel portal construction, discusses the condition to employ full face method, bench cut method, single side heading method and double sides heading method of portal construction, points out advantages and disadvantages of these methods. the order to adopt these methods of single track, double track and tri - track tunnel in shallow - depth, uneven pressure and incompact ground is also advised after compare
討論了全斷面法、臺階法、單側壁導坑法和雙側壁導坑法在隧道洞口段施工中的使用條件和優缺點,對這四種施工方法從各個方面進行了比選,提出了單線、雙線和三線隧道的洞口段處于淺埋、偏壓、鬆散的地層中時各種施工方法選擇的先後順序。The paper discussed the application of seismic - refraction on tunnel geologic engineering in detail through the practical problems in engineering geology exploration of jikeng tunnel in funing highway, fujan province
摘要本文通過福建省福寧高速公路磯坑隧道工程地質勘察中的實際問題,詳細討論了地震折射波法在隧道地質工程中的應用。分享友人