隧道頂線 的英文怎麼說

中文拼音 [suìdàodǐngxiàn]
隧道頂線 英文
tunnel top line
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places

    摘要採用鐵路工程抗震設計規范、動三軸試驗及有效應力的理論分析相結合的方法,對南京地鐵南北( 1號)區間開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當底板坐落在5層且5層較厚時的液化區出現在襯砌底板處;局部地段液化區出現在部及拱腰;大部分地段的液化區出現在板上方。
  2. Water invasion bursten out during the railway - tunnel construction is usually the mainly problem in constructing or operating, also which brings surface water to exhaustion and pollutes environment or effects ecology, etc. the geleshan tunnel which crosses through guan - yin gorge anticline which trend is near south north, is located between tuanjie village and jingkou village of the shapingba zone, chongqing city, which is belongs to the inducting segment of yu - huai railway. the guan - yin gorge anticline appears to ridge and slot interlacing in land form, and is composed of clastic rock and carbonate rock from jurassic xintiangou group to triassic

    歌樂山位於渝懷引入段重慶市沙坪壩區團結村至井口村之間,穿越近南北向的觀音峽背斜,地貌上表現為脊、槽相間,觀音峽背斜由侏羅系新田溝組至三疊系下統碎屑巖和碳酸鹽巖組成,歌樂山大部分出露可溶巖地層,地表巖溶發育,有大量泉水和暗河出口,並修建有多個中小型水庫、大量池塘和水井。
  3. The main business of company covers onshore and offshore pipeline construction, shield tunneling , long - distance pipe - jacking, pre - commissioning and etc

    公司主營業務為各類介質的陸上與海洋管施工,盾構與長距離管,管預投產施工等。
  4. The paper analyzes the features of the design of shijiezhichuang station on shenzhen subway line 1 in respect of the choice of transfer mode, the scale of transfer nodes reserved in advance, openings in the ceiling, utilization of the upper space above the region of crossover switch and the distance between the east end of the station and the existing road tunnel

    摘要對深圳地鐵1號世界之窗站設計中的特點進行分析,包括車站換乘形式的選擇,預留換乘節點的大小、車站板的開孔、折返岔區上部空間的利用、車站東端距既有汽車的距離等。
  5. The road level of the cwb, as well as its eastbound slip road to the hong kong convention and exhibition centre extension, will need to be raised to - 7. 1 mpd to avoid clashing with the existing mtr cross harbour tunnel tsuen wan line with its roof at - 14. 6mpd

    -中環灣仔繞的路面高度,以及通往香港會議展覽中心的東行支路必須提高至主水平基準面以下7 . 1米,以避開現有地鐵過海荃灣,該部位於主水平基準面以下14 . 6米