隨機后驗概率 的英文怎麼說

中文拼音 [suíhòuyàngài]
隨機后驗概率 英文
random posterior probability
  • : Ⅰ動詞1 (跟; 跟隨) follow 2 (順從) comply with; adapt to 3 (任憑; 由著) let (sb do as he li...
  • : machineengine
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ名詞1 (大略) general outline 2 (神氣) manner of carrying and conducting oneself; deportment ...
  • : 率名詞(比值) rate; ratio; proportion
  • 隨機 : random stochasticrandom
  • 概率 : [數學] probability; chance概率論 probability theory; theory of chances; 概率曲線 probability curv...
  1. Monte carlo is a method that approximately solves mathematic or physical problems by statistical sampling theory. when comes to bayesian classification, it firstly gets the conditional probability distribution of the unlabelled classes based on the known prior probability. then, it uses some kind of sampler to get the stochastic data that satisfy the distribution as noted just before one by one

    蒙特卡羅是一種採用統計抽樣理論近似求解數學或物理問題的方法,它在用於解決貝葉斯分類時,首先根據已知的先獲得各個類標號未知類的條件分佈,然後利用某種抽樣器,分別得到滿足這些條件分佈的數據,最後統計這些數據,就可以得到各個類標號未知類的分佈。
  2. Correlative function method and variable function method are used to calculate the relevant range of soil layer. the limit capacity of bored pile is determined by the cone penetration tests ( cpt ) and the static loading tests and related statistics parameters are also evaluated. considering the effects of group piles, the action effect is calculated by the settlement of pile foundation and the reliability index of single pile as well as group piles is determined by monte - carlo method

    本文選擇臨近場地的四座高層建築地基的全部勘測資料,以沿深度方向的一維平穩高斯場作為樁基土層土性參數的數學模型,利用相關函數法和變異函數法計算土層的相關范圍,由cpt和靜載試結果綜合確定鉆孔灌注樁的極限承載力,進而對相同場地各試樁的承載力進行折算分佈,並估計有關統計參數:考慮群樁效應確定樁基承載力,由樁基沉降反算其作用效應,由monte - carlo方法計算單樁及群樁的可靠指標。
分享友人