集中負荷 的英文怎麼說

中文拼音 [zhōng]
集中負荷 英文
concentrated loads
  • : gatherassemblecollect
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 集中 : concentratecentralizefocusamassgroupmassingput togather
  • 負荷 : [電學] load; charge; weight
  1. With distributed control system, mscis possesses the characteristics of centralization of it " management, distribution of it " functions, burthen and malfunctions

    Mscis介面系統採用分散式體系結構,具有管理、功能分散、分散、故障分散和易於擴展的特點。
  2. Distributed control system ( dcs ), with the characteristic of centralization of its management and the distribution of its functions, burthen and malfunction, is widely used in the process of modern industry

    分散式控制系統( dcs ) ,由於其功能分散、分散、故障分散、管理和易於擴展的特點得到廣泛的應用。
  3. Though there are a certain level of counteractive impacts to the market power from the price - differentiation agreement and dynamics of demand, the influence of market power cannot be eliminated ; 3 ) in the electricity market, the market power size is greatly influenced by the supply - demand relationship, extent of concentration, and market collusion

    雖然差價合約和需求彈性對市場力有一定的抑制作用,但並不能消除市場力的存在。 ( 3 )電力市場的供需關系、市場的度以及市場共謀的有效性極大地影響著市場力的大小;發電企業的成本和發電容量的限制在某種程度上也影響著市場力的實施效果。
  4. The main hardware is the collection equipment, the software is the windows dna framework, distribute calculate resolves the problem of data server down because of heave calculate mission. system provides the mis sub - system base on ie, which make data - query and report forms not limited by the special network. the new module, standard interlink module is aimed at the problem of not pluralize between different system, can make system utility in administrative levels

    系統有硬體和軟體組成,硬體的基礎是採裝置;軟體採用windowsdna構架,使用分散式計算,解決了原來系統的計算任務過于繁重造成數據服務器不能承擔的問題;服務方面提供基於ie的mis系統,使數據查詢和報表服務擺脫了原來的專用網路的限制;新增加模塊「標準互連」模塊是針對目前各種自動化系統不兼容的問題而產生的,可以實現電力自動化在更高層次上的實現,在這個模塊,有意識的採用
  5. Various sewerage works were outlined in the east kowloon and north south kowloon sewerage master plans drawn up for the area, and these began to be carried out in the 1990s. they included construction of a number of dry weather flow interceptors along the nullah to intercept polluted storm flow, along with the replacement of worn - out and often overloaded sewerage facilities

    東九和九北部及南部污水收整體計劃為該區規劃了多項污水工程,這些工程在九十年代陸續動工,當包括沿啟德明渠建造旱季截流設備以截止污染雨水,以及更換過重又殘舊的污水設施。
  6. " the traffic will be aggravated further upon the completion of the private residential developments at area 4b heung fan liu and at tao fung shan by 2010. traffic from these developments will converge onto the same junction of heung fan liu street and mei tin road, " he said

    他說:隨香粉寮第4b區及道風山的私人房屋於二一年落成,有關發展會令區內的交通流量進一步增加,交通將會在香粉寮街及美田路交界處。
  7. The burners of 220 t / h boiler in henan shenhuolv power plant were retrofitted by using the pulverized coal burners with stabilized - firing cavity and cutting down the distance between up - primary air and down - primary air etc. technologies, thus the boiler was successfully converted from originally designed burning high calorific value coal to low calorific value coal, the boiler could operate stably at 50 % load without oil - firing aid and the thermal efficiency of boiler reached 89 %

    摘要採用穩燃腔煤粉燃燒器並布置上、下一次風等技術對河南神火鋁電廠220t / h鍋爐燃燒器進行改造,成功地將該爐原設計燃用優質煤改燃為普通煤,並取得了改造后50 %可無油穩定運行,鍋爐熱效率達到89 %的良好效果。
  8. Numerical simulation results indicate that, for low temperature dust particles, dust particles mainly exist in the area near the column center and their charge - number can be considered as a constant, while in the area where there are no dust particles, ion and electrons are in ambipolar diffusion ; for high temperature dust particles, both the distribution regions of dust particle and high ion density are expanded and dust charge - number is increasing with the distance from the center

    計算結果表明:當塵埃粒子的溫度較低時,塵埃粒子主要在圓柱形放電器的心很小的區域,塵埃粒子攜帶的電幾乎是一個常數,受塵埃粒子空間電的影響,離子在該區域的密度最高。在遠離心區域,離子和電子呈現雙及擴散特點;當塵埃粒子的溫度較高時,塵埃粒子分佈的區域和高離子密度區域擴大,塵埃粒子離放電器心越遠,攜帶的越多。
  9. Taking load uncertainties, infeasibility problem and multiple objection of the reactive power optimization in the radial distribution system into consideration, loads are modeled as fuzzy interval numbers. fuzzy power flow is proposed based on fuzzy interval load for the more practical membership function of line losses rate and maximal voltages offset. this thesis presents multiple objection model of the reactive power optimization considering uncertainties using the fuzzy set theory

    對配電網電壓無功優化問題的非概率性的不確定性問題、多目標問題、約束不可行性問題進行了研究,用模糊區間來描述實際的情況,並用的模糊區間值計算配電網的潮流,得到有功功率損耗和電壓的模糊區間值,使網損率和節點電壓最大偏移量的隸屬函數更接近實際情況;將改進遺傳演算法與模糊理論相結合,通過求解多目標函數和約束條件的模糊合的交,得出網損率和節點電壓最大偏移量最小的最優運行狀態。
  10. This product is absorbing all forms of domestic and foreign prefabricated substation and development, high pressure, low voltage electrical equipment, distribution transformers trinity, with perfect protection, a flexible combination of superb technology will be mainly used to replace conventional civil engineering - type substation ; deep into load centers, widely used in high - rise buildings, petrochemical plants, power plants, subways, railway stations, wharves, airports, schools, hospitals and other important establishments population is concentrated

    本產品是吸收國內外各種形式的預裝式變電站而開發的,高壓、低壓成套電器、配電變壓器三位一體,具有完善的保護、靈活的組合、精湛的工藝,主要用於取代傳統土建型變電站;可深入心,廣泛用於高層建築、石油化工廠、發電廠、地鐵、車站、碼頭、機場、學校、醫院等人口的重要場所。
  11. Three phase dry type power transformer, which make it with those features : safety, reliability, and energy saving, fireproof, flameproof, simple maintenance etc., the design is advanced ; the structure of products is reasonable and the outline is fine, the main performances of the products are much better than the national standards, for example, partial discharge level no - load loss, on - load loss, noise level, it is adaptable for application on heavy humidity and severely pollute places which are near to lake, sea and rive, as well as, high demand - fireproof, heavy load capacity place, such as : high building, airport, station, port, underground, hospital, electrical power station, metallurgy, shopping center, residential area and petroleum chemical industry, nuclear power station, nuclear - powered submarine

    非包封線圈三相干式變壓器,具有安全可靠節能防火防爆維護簡單等優點。其設計先進結構合理外形美觀。主要性能指標均優于國內標準,如局放水平空載損耗載損耗噪聲以及能適應高溫度環境使用等,可安裝在靠近湖海河邊污穢潮濕的環境及防火要求高較大的地區,適用於高層建築機場車站碼頭地鐵醫院電廠冶金行業購物心居民密區以及石油化工核電站核潛艇等場所。
  12. This project makes some researches with emphasis on the mv / lv distribution power supply situation under the present load condition. some results such as the calculation of line load rate, theoretical line consumption rate and electric voltage decrease are acquired by the mathematical analysis, and thus the power supply capability is evaluated comprehensively. the same has been done to the lv power network

    課題在系統搜分析蘇州供電企業的背景資料,即企業概況、電力需求、輸電網、高壓配電網狀況基礎上,重點研究了當前下的低壓配電網供電情況,並通過數學分析得出線路的載率的計算、理論線損率以及電壓降等各項運行指標,綜合評估得出其供電能力。
  13. Thermal stress control system actually gather the real - time data of unit sets , compute temperature fields , stress fields and maximum dangerous stress by the math modal , decide target and speedup rotation in every stage of startup process , and justify automatically to realize auto control a serial of processes of turbine , such as speedup , warm - up , connecting net , load changing , stop and unsteady condition etc , and improve automatic level of the unit sets. turbine auto startup ( tas ) system can automatically evaluate steam turbine ' s startup and load changing process according to thermal stress of

    熱應力控制系統實際是對機組運行參數進行實時採與監控,通過數學模型實時地計算高、壓缸轉子的溫度場、應力場分佈,以及最危險熱應力,以確定啟動過程各階段的目標轉數及升速率,並進行自動調整,實現機組沖轉、升速、暖機、並網、升、停機以及異常工況下的自動控制,大大提高了機組的自動化水平。
  14. On the exhibition of northeast asian new and high technology and product 2004, the vice mayor of shenyang city wang ying introduced to the attendances that on the schedule of shenyang city revolution and opening up ten fields can offer good cooperation opportunities to the other countries and areas of domestic enterprises, the complete automobile and spare parts manufacturing is one of this fields. shenyang automobile industry has special features also has the most brands in our country, such shenyang is also the deeply degree of opening up, bmw of germen, ge of american, hino of japan

    專業人士表示,後置后驅車輛的重量於汽車的後部,發動機距驅動軸很近,因而驅動輪大,啟動加速時牽引力大,且傳動效率高,燃油經濟性好發動機等主要部件後置有利於車身內部布置,車廂內的面積利用率高,且易於將發動機與車廂隔開,減少車廂內的振動和噪聲,乘坐舒適性良好。
  15. In order to gather and analyse the load information automatically and promote the level and precision of distribution network plan, line loss analysis and operation mode adjustment, the data from distribution measuring devices, load supervising system and automatic message registering are centralized through mapping in dgis ( distributuin geography information system ) and other three systems

    摘要為實現對配網的自動採和分析,以提高配網規劃、線損分析及運行方式調整的水平與精度,採用心數據庫數據方式將配電綜測儀、控系統和抄表程序數據管理。
  16. Natural stone test methods - determination of flexural strength under concentrated load ; german version en 12372 : 1999

    天然石料檢驗方法.集中負荷抗彎強度測定
  17. 1 the forecast model of the load of the heating system was put forward, parmeter of the model was recognized in genetic algorithm. on the basis of the result, the temperature of water supply was calculated and become target aim of burning system

    針對供熱系統的特點,設計了整個系統的運行控制方案。 1建立了供熱預測模型,採用遺傳演算法對模型的參數辨識,並以此來計算當天的供熱溫度,指導鍋爐的自動控制。
  18. The engendering source of traffic volumes and their general influential factors have been presented, and the situation of nowadays highway transportation has been discussed. according to the introduction of traffic distribution theory and classical assignment method, analysis of traffic flow path selection among cities and that of special influential factors for traffic flow on toll highways, initial analysis to the forming mechanism of traffic volume on road sections has been made, and a probability model for path selection has been set up with the maximum - utility theory and disaggregating model. detailed analysis to impedances on road sections and their functions ( especially to three main composing factors of the impedances as cost of time, transport and toll and to the functional relations with traffic loads ) was made, at the same time, the relative cost calculating model was set up on the basis of the state - of - art achievements in both international and national researches

    主要研究內容包括:交通量的產生根源及一般影響因素分析和當前公路運輸地位討論;從交通分配理論及經典配流方法著手,通過分析城市間交通流路徑選擇行為和收費公路路段交通量特殊影響因素,初步提出路段交通量的形成機理,並採用效用極大原理和非結模型理論( disaggregationmodel ) ,建立用戶出行路徑選擇概率模型;對路段阻抗及路阻函數(尤其對行程時間費用、車輛營運費用和道路收費這三個構成路段阻抗的主要因素及其與交通間的函數關系)進行較為詳盡的分析,並以現階段國內外較為先進的研究成果為依據建立相應的成本測算模型,其,特別提出了兩種確定客貨車輛時間價值的分析方法;離散分析法和時間-費率轉換法,後者是在目前基礎調查、統計數據資料不夠齊全的現實下提出的一種確定道路系統內務車型時間價值的較為實用的新方法;對我國公路收費政策的背景和理論、實踐依據及費率的各種影響因素進行重點分析;從數學的角度證明合理費率的存在性,並以最優化理論為基礎,建立在普通收費公路和擁擠路段交通調控型收費公路兩種模式下合理費率的計算模型等。
  19. In order to solving the problem, i brought forward the scheme of combining palm - size pc with gps. according to the characteristics of palm - size pc such as carry - home, strong communication ability, to develop the gps data collector based on palm - size pc. this equipment has functions of collect & handling data, location, navigation and saving etc, it can replace the notebook pc and gps receiver and liberate the operator from overburden

    本文以解決實際應用的gps數據採和處理問題為目標,將掌上電腦與gps相結合,利用掌上電腦輕巧便攜、通訊能力強等特點,開發基於掌上電腦的gps數據採器,實現採處理數據、定位、導航、存儲等功能,代替筆記本電腦和gps接收機手簿工作,將操作人員從解放出來。
  20. The research work including constructing the whole frame and design these main composing : high voltage collecting terminal, low voltage collecting terminal, charge controlling terminal, supervising center and mobile electro - supervising terminal

    包括防竊電系統的整體構架以及系統的主要組成部分:高壓採終端、低壓採終端、控制終端、監控心和移動用電監管終端的設計。
分享友人