集水乾渠 的英文怎麼說

中文拼音 [shuǐgān]
集水乾渠 英文
collecting main
  • : gatherassemblecollect
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1. (八卦之一) qian, one of the eight diagrams2. (姓氏) a surname Ⅱ形容詞(舊時稱男性的) male
  • : Ⅰ名詞1 (人工開鑿的水道) canal; ditch; channel 2 [書面語] (車輪外圈)outer wheel3 [書面語](盾...
  1. The gabled brick, tile, and freestone houses had almost dried off for the season their integument of lichen, the streams in the meadows were low, and in the sloping high street, from the west gateway to the medieval cross, and from the medieval cross to the bridge, that leisurely dusting and sweeping was in progress which usually ushers in an old - fashioned market - day

    那些帶有用磚砌的山墻和蓋有屋瓦的石頭房子,外面的一層苔蘚已經因為燥的季節差不多曬干脫落了草場上溝里的變淺了,在那條斜坡大街上,從西大門到中古十字路,從中古十字路到大橋,有人正在不慌不忙地清掃大街,通常這都是為了迎接舊式的市日子。
  2. Which is situated in the western of he nan and is drought year in year out and it is a multiple - purpose water supply development with agricultural irrigation, municipal water supply and rural water of men and domestic animals. the irrigation district was designed by he nan water survey designing institute in 1967, and began to be built in 1970. the aggregate main canal and the east - two main canal were built up and began to irrigate partially in 1974. up of the dong song part of the main canal had been built in 1980, and the first periodical project was completed in 1991. one part of the west main canal was built afterward

    河南省陸渾灌區是河南省百萬畝以上大型灌區之一,地處十年九旱的河南省西部,是一農業灌溉,城市供,農村人蓄吃為一體的多目標供工程,灌區於1967年由河南省利勘測設計院開始勘測規劃設計, 1970年開工建設, 1974年建成總、東二,並通局部施灌, 1980年完成東一東宋以上段, 1991年第一期工程竣工驗收,以後又修建了西部分工程。
  3. Yuen long and kam tin sewerage and sewage disposal - kam tin trunk sewerage phase 1 and au tau trunk sewers

    元朗及錦田污系統及污排放設施錦田污系統第1期及凹頭污工程
  4. Supplementary information on 215ds - yuen long and kam tin sewerage and sewage disposal - kam tin trunk sewerage phase 1 and au tau trunk sewers

    補充資料215ds元朗及錦田污系統及污排放設施錦田污系統第1期及凹頭污工程
分享友人