電力灌溉 的英文怎麼說

中文拼音 [diànguàngài]
電力灌溉 英文
irrigation by electric power
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (輸水澆土) irrigate 2 (倒進去; 注入) pour in; fill 3 (飲酒; 勉強他人飲酒) drink wine...
  • : 動詞[書面語]1. (澆水) supply with water 2. (洗滌) cleanse; wash
  • 電力 : [電學] power; electric power電力變阻器 power rheostat; 電力捕魚 electrofishing; 電力潮流 directio...
  • 灌溉 : irrigate; irrigation; watering
  1. Iran is building 88 dams for agriculture, hydro - electric power generation and drinking water

    伊朗正在興建88座水壩,提供、水和飲水之用。
  2. But with the continuous decrease of ice mountain water flow, the water conservancy and hydropower potential will diminish, the industrial production will be adversely affected, and the agricultural output will reduce due to lowered irrigation capacity

    但是,隨著冰山水流的不斷減少,水利發的能量潛也將減少,工業生產將受到影響,同時的降低也將造成農業減產。
  3. The main points of hlsip quality control includes : during the design stage, it is necessary to control the scheme comparison and optimum design, esp. the waterwork, electromechanical device and irrigation region planning, to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period, the supervisor should help proprietor choose construction contractor, sign the construction contract, supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition, the contractors must improve their quality self - control, maintain the notion " quality first " and insist the full process, multiway, and multi system control of construction quality

    高揚程梯級提水工程質量控制的重點包括:設計階段控制好方案對比、設計優化,特別是水工建築、機安裝、區規劃等多專業多目標的確定和協調,提高設計質量和深度,注重控制設計成果的長期效益;施工階段協助業主選擇好施工承包商,制定出嚴謹、完備的施工合同,搞好設備監造,嚴格執行質量控製程序,使工程施工時時處于受控狀態;同時要提高承包商的質量自控能,堅持施工質量的全過程、多方法、多體系控制。
  4. Special plans for the prevention of floods, the control of water - logging, irrigation, navigation, urban and industrial water supply, hydro - electric power generation, bamboo or log rafting, fishery, water quality protection, hydrologic surveys, the general prospecting and dynamic monitoring of groundwater, etc., shall be formulated respectively by the competent departments of the people ' s governments at or above the county level and shall be submitted to the people ' s governments at the corresponding level for approval

    防洪,治澇、、航運、城市和工業供水、水、竹木流放、漁業、水質保護、水文測驗、地下水普查勘探和動態監測等專業規劃,由縣級以上人民政府有關主管部門編制,報同級人民政府批準。
  5. Yc ycl series single - phase heavy - duty capacitor start asynchronous motor is suitable for driving small lathe and water pump, especially good for families and workshops where only single - phase power is available. this series motors are designed with advanced technique and made of fine materials

    Yc ycl系列大馬單相容起動動機及ycl系列大馬單相容起動運轉動機符合iec標準,起動轉矩大運行可靠,適用於水泵空壓機農業業建築業製造業。
  6. After we built waterpower - electricity station, we can strengthen flood - preventing ability of downstream, improve the condition of farmland irrigation and town - supplying and region environment and so on. exploitation extent of waterpower resource is an important symbol of scientific and technical advancement and economic development

    建設水站的同時,往往還可以提高下游防洪能,提供農田和城鎮供水條件,改善區域環境等,水能資源開發利用程度,是科技進步和經濟發展的重要標志。
  7. The line is mainly used for producing foamed pvc pipes. those pipe are widely used in sewer, electricity and tele - communication cables, drainage for airport and railway projects irrigation pipes, etc

    該生產線主要用於生產pvc發泡管材,生產的芯層發泡管材廣泛適用於下水管道。及道路通訊。纜導管、機場道路和鐵路排水管、低孔輸水管。
  8. This paper chooses the indicators of economy and land quality input which has influence on the output, depending on cd - productive function to establish the function between input and output : y : productive forces of the cultivated land f : input of the fertilizer and agricultural chemical i : input of the irrigation l : input of the labor q : input of the land quality a : the level of average management t : the level of changing management a, b, c, d, f : productive elasticity coefficient the factor of the land quality includes texture, content of the organic matter, degree of the pickled, the structure of the soil

    本項研究選擇了影響農用地總產出的經濟投入指標和土地質量投入指標,藉助c - d生產函數,建立土地投入產出的函數關系: y = a ? e ~ ( ft ) ? f ~ a ? i ~ b ? l ~ c ? q ~ dy為以土地總產值表示的土地生產f為化肥和農藥的投入i為投入,即所需用的水費l為勞動投入(考慮了農業機械投入的修正) q為土地質量投入a為平均管理水平t為變化的管理水平a 、 b 、 c 、 d 、 f分別為各相應生產要素的產出彈性系數其中,土地質量因子包括表土質地( t人有機質含量矚入鹽漬化程度px土體構型p )等。他們之間的關系為: q ( a ; xt a 。
  9. This thesis analyses from following angles why speeding hydroelectric power exploitation is necessary for social and economic sustainable development of sichuan province : first, structure of power and resource of sichuan province requires accelerating hydroelectric power exploitation ; second, abundant water resource is advantageous for sichuan accelerating hydroelectric power exploitation ; third, comprehensive benefit results from hydroelectric power projects demands accelerating hydroelectric power exploitation ; forth, hydroelectric power exploitation stimulates development of other crafts ; fifth, construction of large scale project is beneficial for reducing resource cost of the whole society ; last, the process of hydroelectric power exploitation usually consists of much scientific and technological content

    本文從下述幾個方面分析了大發展水是四川社會和經濟可持續發展的必然選擇:四川的能源資源結構要求大開發水;四川水能資源的優勢要求大開發水;水工程巨大的綜合經濟利用效益要求大開發水,水工程除了發效益外,一般還兼有防洪、、供水、航運、養殖、旅遊等社會效益,水站的綜合利用可以為社會創造巨大的社會和經濟效益,造福一方;水開發對經濟廣泛的拉動作用要求大開發水;大型水建設有利於降低全社會資源損耗;水能資源的開發利用過程具有較高的科技含量。
  10. Based on the reality of zhangye oasis water resources utilization, and supported by the environmental economics theory, this paper is to research and analyze the agriculture water utilization in the oasis, including sunan, minle, shandan, zhangye, linze, gaotai sincel970s. to analyze the economic benefit of the unit provision output effected by the labor - flooding water volumes based on both the real collected data and the statistical data provided by the stat. dept in the past years ; the checking standard for output benefit is the unit provision out put the input parameters are water, fertilizer, power - supply and the cone - erned factors occurred during the agriculture production

    經過大量的實地考察,對甘肅的武威、張掖和酒泉三大綠洲的自然、經濟情況,尤其是農業生產情況和用水情況進行了深入的調查和研究,在獲取實際資料的基礎上,結合統計部門提供的歷年統計數據,以糧食單產為產出效益衡量標準,以農業生產涉及的水量、天然降水量、化肥農藥施用量、農業生產用量、農業機械總動以及自然災害情況等各相關因子為投入參數,利用sas 、 spss等統計分析軟體對數據進行處理和分析,分別採用實物量指標和價值量指標,分析人工水量這一投入要素,對糧食單產這一產出的總效益、邊際效益和平均效益。
  11. In the development of hydropower stations, the ecological environment shall be protected, and the needs for flood control, water supply, irrigation, navigation, bamboo and log rafting, fishery, etc. shall be taken into account

    建設水站,應當保護生態環境,兼顧防洪、供水、、航運、竹木流放和漁業等方面的需要。
分享友人