電加熱爐 的英文怎麼說

中文拼音 [diànjiā]
電加熱爐 英文
electrically heated furnace
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  1. 2. electric heating or optional diesel oil burner heating for oven

    2烘箱或選配柴油
  2. Series full - auto pipe expander with drawing device and program interface is used with extruding machine. it is also used solitarily, while expanding pipes, the machine adopts translation, the action is steady and corret, it does not damage pipe materical, the machine adoptes double - infrared heating oven type, each oven is equipped with heating cire, the shaping method adopts expanding - end shaping, the size of pipe mouth is correct. on its panel, there is a transfer swith of expanding solvent type pipe socket ( straigh port ) and expanding sealloop type pipe socket ( rport ). the choice of expanding pipe type is very convenient, the technologocal adaptability is strong, its main electric control elements are all imported. the syetem charecteristics are steady and reliable

    配有與主機配套的接料牽引裝置和相應的程序介面,既能與擠管主機聯線使用,又可以作單機使用;擴管時管材的移動均採用平移方式,動作平穩準確而且不易損傷管材;這種機型採用紅外線方式且為雙型,每個都配有中心芯;成型方式均採用擴管頭定型方式,管口成型尺寸準確;該機型在控制面板上設有擴溶劑型承介面(直口)和擴彈性密封圈型承介面( r口)的轉換開關,擴管方式選擇十分方便,工藝適應性強;主要的器控制元件均採用進口元件,系統性能穩定可靠。
  3. This paper combines the charicteristic of heilongjiang province power system such as supply exceeds demand, heating cycle in winter is long, arcola and personal heating is too much, air pollution is serious ect to rearch the realization machinism of electricity heating technology and actulization technology of electricity heating or heat storage

    本文結合黑龍江省力系統略有供過于求,冬季採暖周期長,小鍋及個人採暖多,空氣污染嚴重的特點,對採暖技術的實現機理和(蓄)採暖的實施技術進行了較深入的研究。
  4. Neural network based model reference adaptive control for a three - chamber oven

    三溫區電加熱爐的神經網路模型參考自適應控制
  5. For many years, the drying furnace has been adopted with sealed structure and electrical heated, dial instruments are used to control the temperature of the drying furnace and to keep it invariable. parameter setting is inputted by manual method, heating time is completely controlled by operators ’ experiences or their moods, meanwhile, its control function is singular, not only having no automatic heating time and insulating monitoring, having no drying process monitoring, but also having no function of automatic recording and report printing, the workers ’ labor intensity is bigger. thus two abnormal situations are always come forth, one is the insulating performance and intensity of works cannot be guaranteed reliably, it perhaps need to be dried repeatedly, the other is always to extend the drying time in order to ensure the drying quality

    多年來乾燥一直採用悶罐式結構和方式,溫度控制採用指針式溫度控制儀表來實現溫的恆定,其參數設定由人工輸入,時間控制則完全憑操作者的經驗、情緒來掌握,其控制功能單一,沒有時間控制、絕緣自動監測功能,也沒有乾燥過程監視功能,更沒有多要素記憶、列印存檔功能,工人的勞動強度較大,所以就經常出現兩種異常結果:一是工件的絕緣性能和強度得不到可靠保證,需要反復乾燥;另一種是為保證乾燥質量,往往要延長乾燥時間。
  6. 5. sealed hot wind circulationg oven, automatic constant temperature, diesel oil air - stove or electrical heating for the drying methods

    5封閉式風循環烘箱,自動懂恆溫控制,方式柴油或外置式
  7. This equipment mainly consists of s mobile press, three vacuum heating - furnaces, hydraulic press system, hydrocooling system, electrical control system and data collecting / outputting system

    該設備由一臺移動式壓機、三臺真空、液壓壓下控制系統、水冷系統以及相應的氣控制和數據存儲輸出等幾部分組成。
  8. Importance and means of signal measurement and processing in control of three main electric and mechanical equipment for walking beam heating furnace are discussed, the discussion includes time filtering processing of digital signal, measuring signal processing and measurement fault judging of translation stroke in charging machine and discharging machine, translation stroke measurement of walking beam and measuring method of slab output quantity

    摘要論述了步進梁的三個主要氣機械設備控制中信號檢測和處理的重要性及方法,包括四個方面:數字信號的時間濾波處理,裝鋼機、出鋼機的平移行程檢測信號處理和測量故障判斷,步進梁的平移行程檢測,板坯流出量的檢測方法。
  9. Wear resistant layer of cylinder and double - layer liner in catalyst creaking apparatus ( without or with tortoiseshell net can be used ), inner liner of carbon monoxide exhaust - heat boiler, pouring at site for furnace roof with high temperature of heating furnace of steel rolling, different forging furnace, resistance furnace, the prefabricated parts can also be made

    催化裂化裝置中的筒體耐磨層及雙層襯里, (無龜甲網和有龜甲網均可採用)及一氧化碳余的內襯,也適用於軋鋼、各種煅造頂、墻、底高溫部位的現場澆注,可製成預制構件。
  10. The tunnel stove has electric heating and gas type two kinds, chose any one kind of them

    隧道電加熱爐和燃氣二種,任選一種。
  11. Taking advantage of the quick response of expert control and the better robust ability of predictive function control, this paper advances a selective control strategy based on expert control and predictive function control, and proceeds to put it into use in the electric heating oven system

    摘要利用專家控制響應迅速及預測函數控制具有較強魯棒性的特點,提出了專家控制和預測函數控制的選擇性控制策略,並將其應用到電加熱爐系統中去。
  12. Finally, the examples are made on the electrical heater

    最後,在電加熱爐上進行實例設計。
  13. Design and application of the electric stove flow control system based on plc

    電加熱爐流量控制系統的設計與實現
  14. The application of temperature control of a electrical furnace shows that this algorithm has good performance

    將其應用到電加熱爐的溫度控制,取得了較好的控制效果。
  15. Neighborhood clustering adaptive fuzzy control and its application in the electric heat furnace with multiple temperature zones

    聚類自適應模糊控制及其在多溫區電加熱爐中的應用
  16. An electrical resistance furnace is a nonlinear system, changing with time and distributed parameter. it is difficult to express its characteristic using precise mathematic model

    電加熱爐是一個非線性、時變和分佈參數的系統,用精確的數學模型表示其特性顯然是十分困難的。
  17. 5. the control systems of the heater are designed by the adaptive fuzzy neuron control arithmetic. the step response curve is got. the results show their nice performances

    針對實驗室電加熱爐系統,使用自適應模糊單神經元控制演算法進行控制系統的設計,得出階躍響應曲線,取得了滿意的控制效果。
  18. The real - time fuzzy control respectively for the three - section electric furnace and three tank liquid level experiment equipment is carried out to show the effectiveness of the fuzzy controller designed by fcds, in the mean while realize integrately run with forcecontrol and kingact configuration software

    通過對三溫區電加熱爐和三容液位控制實驗裝置的實時模糊控制,實現了利用fcds設計模糊控制器,並與「力控」 、 「組態王」組態軟體的集成運行。
  19. Finally, heating furnace and the serial interface data collection tools written by vc are designed to test the performance of the control system

    最後,製作粘片機電加熱爐,用vc編寫串口數據採集工具,對溫控系統進行實驗,取到了較好的效果。
  20. 5. combining internal model control method with smith predictor and single neuron controller, a neuro - pid internal model control method for time - delay systems is put forward. the real - time temperature control result of the electrical furnace shows that the control performance is very good

    將內模型控制與smith預估控制相結合,並引入單神經元控制器,提出了時滯系統神經元自適應pid內模控制方法,並將其應用於電加熱爐的溫度控制,取得了較好的控制效果; 6
分享友人