電子壞工程 的英文怎麼說

中文拼音 [diànzihuàigōngchéng]
電子壞工程 英文
electro-mechanical engineering
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 子Ⅰ名詞1 (兒子) son 2 (人的通稱) person 3 (古代特指有學問的男人) ancient title of respect f...
  • : Ⅰ形容詞1 (不好的; 惡劣的; 使人不滿意的) bad 2 (表示程度深 多用在表示心理狀態的動詞或形容詞後面...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 電子 : [物理學] [電學] electron
  1. The correlated degree of the density of deformed and failured masses and correlative dynamic force factors in tiger - leaping gorge reach are analyzed by effect measure analysis method which combines qualitative and quantitative analysis, and the key dynamic factors of bank - slope stability are established, which can provided the scientific information for origin division, evaluation, prevention of geological hazards and project planning

    本文採用定性與定量相結合的效果測度分析方法,對虎跳峽河段岸坡變形破密度與相關動力因進行關聯度量化分析,從而確定了影響岸坡穩定的關鍵性動力因,可為水開發中的岸坡災害成因類型劃分、危險性評價、災害治理和規劃設計等提供科學依據。
  2. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大壩體的靜動力安全穩定性及溫控方案提供依據。
  3. Thermal and welding residual stress often produces in the proceeding of the electronic package, the residual stress release and thermal deformations of the microelectronics will reduce the assemble intensity between the chip and package, and then debase the electrical performance of the assemble circuit, numerous thermal cycling will lead to thermal fatigue or thermal failure of the microelectronics

    封裝器件在生產的藝過中,往往會產生熱殘余應力以及焊接殘余應力,殘余應力的釋放作用及器件在使用過中的熱變形,會降低集成路晶元與封裝體的結合強度,進而降低集成路的性能,反復的熱循環,將導致器件的熱疲勞失效,嚴重時可導致矽片或陶瓷片破裂,使整個器件遭到破
分享友人