電工油灰 的英文怎麼說

中文拼音 [diàngōngyóuhuī]
電工油灰 英文
electrician's putty
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (脂肪; 油脂) oil; fat; grease 2 (姓氏) a surname Ⅱ動詞1 (用桐油、油漆等塗抹) apply t...
  • : Ⅰ名詞1 (物質燃燒后剩下的粉末狀的東西) ash 2 (塵土; 某些粉末狀的東西) dust 3 (特指石灰) lime...
  • 電工 : 1 (電工學) electrical engineering; electrotechnics2 (製造、安裝電氣設備的工人) electrician電...
  1. Washed air purifier working principle : siphon and using centrifugal principle will be mixed in water pure plant essential oils inhaled through its siphon principle the motor base coaxial centrifugal turbines in the bottom of straw through exchanges cover a very high - speed rotary motor, reuse centrifugal principle, will be mixed in water pure plant essential oil spray bottle in the form within a water film bile, the dust in the air and inhaled bacteria in water purification at the same time after the indoor air insufflation, quickly and efficiently by removing indoor toxin biological, dust, cigarette smoke, the smell, virus

    水洗空氣清新機作原理:是利用虹吸以及離心原理;將混合於水的純植物精通過虹吸原理吸入其機底座的同軸離心渦輪下部的吸管中,通過交流罩極機高速旋轉,再利用離心原理,將混合於水的純植物精噴在瓶膽內形成一層水膜,將空氣中的塵以及細菌吸入水中,同時將經過凈化的空氣吹入室內,快速有效地去除室內的有毒素生物、塵、煙味、臭味、病毒等。
  2. There are miscellaneous tools, pliers, putty knife, polarity stamps, battery stamping or coding equipment, lead cutters.

    有各種具、手鉗、刀,極性印戮、他標記列印或編號機、鉛切刀。
  3. In this paper, the power transformer interior fault diagnosis technique based on the dissolved gas in oil analysis and the principles of genetic algorithm are analyzed. the forecasting models for power transformer interior fault are proposed based on the grey prediction model. the genetic algorithm is applied to estimating optimum coefficients of this forecasting model

    本文對基於變壓器中溶解氣體分析( dissolvedgasesanalysis ,簡稱dga )技術的大型力變壓器內部故障診斷技術和遺傳演算法原理進行了深入的分析,首次將色預測理論引入到大型力變壓器內部故障預測作中,運用遺傳演算法實現預測模型的優化,建立了基於遺傳演算法的變壓器內部故障改進色預測模型。
  4. Project assessment, feasibility analysis, designing, installation, commissioning of auxiliary control system in power plant, include ash & slag system, coal conveying system, water treatment system, oil conveying system, auxiliary boiler etc

    廠輔助控制系統(渣、輸煤、化學水處理、燃、輔助鍋爐等)的項目評估,程造價、設計、安裝、調試。
  5. Do the following maintenance before leaving : clearing the iron filings and dust, lubricating, and shutting power off

    然後做好保養作,刷清鐵屑塵,潤滑加,切斷源。
  6. Methods of sampling and test for carbonaceous materials used in aluminium manufacture - electrode pitch - determination of ash

    制鋁業用炭素材料取樣與試驗方法.第1部分:極硬柏脂.第8節:分測定
  7. The rebuild method for boiler body, burning system, oil burning system, chemic water treatment system, circular water system, electricity generated and transported system, coal transported system, dust eliminated system and electric system have been given out. the solid waste, smoke, waste water and the dust prevented method are studied. the benefits for economy, society and environment after rebuilding are analyzed

    本文從國際能源發展趨勢及龍鳳熱廠的目前現狀出發,論述了改煤程的必要性和可行性;對改煤的四種鍋爐轉型方案進行了科學的分析和論證,確定了立式旋風爐改造方案;給出了鍋爐本體、燃燒系統、燃系統、化學水處理系統、循環水系統、發送系統、輸煤系統、除系統、氣系統的具體改造方案;研究了固體廢物、煙氣、廢水及煤塵的污染防止措施;分析了改造后經濟效益、社會效益及環境效益。
分享友人