電文隊列 的英文怎麼說

中文拼音 [diànwénduìliè]
電文隊列 英文
me age queue
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名詞1 (字) character; script; writing 2 (文字) language 3 (文章) literary composition; wri...
  • : Ⅰ名詞1 (人排成的行列) a row of people; line 2 (具有某種性質的集體) team; group 3 (特指少年先...
  • : Ⅰ動1 (排列) arrange; form a line; line up 2 (安排到某類事物之中) list; enter in a list Ⅱ名詞1...
  • 電文 : content of a telegram; message; text (of a telegram)電文交換 message switching
  1. Abstract : an algorithm to resolve the coupling effect problem is proposed during the cross point assignment ( cpa ) stage. in the algorithm, the priority queue concept and the rip - up and reroute strategy are combined to control crosstalk noise caused by interconnect coupling capacitance. first, the nets are arranged into different priority queues according to their weighted sum of their length and criticality. then, the cpa problem for one queue of nets is translated into a linear assignment problem. after the assignment of one queue of nets, a post - cpa checking routine is performed to check and rip up the net pairs which violate the crosstalk noise constraint and then push them into the next queue to be reassigned. the algorithm is tested by a set of bench mark examples, and the experimental results are promising

    摘:提出了一種在過點分配階段解決噪聲耦合效應問題的演算法.該演算法採用優先同拆線重布策略相結合的方法,控制由互連線耦合容引起的串擾噪聲.演算法中,首先按照線長和約束限制,將線網劃分到若干個優先中.然後,將每個優先的過點分配問題轉換為線性分配問題.在完成一個線網的分配后,通過過點分配后處理過程檢查串擾約束滿足情況,對違反約束的線網對進行拆除,放入后續線網進行重新分配.實驗數據表明,該演算法能夠取得好的效果
  2. Abstract : constant components and output opened ports in the result of high - level synthesis lead to explicit redundancy in gate - level technology mapping. explicit redundancy can not improve the performance, but increases power consumption, enlarges circuit area and decreases its testability, so it should be removed. this paper proposes a queue loop optimization algorithm to remove explicit redundancy completely which decreases the circuit area and improves the testability

    摘:高級綜合結果中常量元件和輸出懸空埠導致門級工藝映射結果中存在顯式冗餘.顯式冗餘無助於提高路性能,反而增加功耗,降低路的可測試性,使路面積增大,應予消除.中提出了顯式冗餘的循環優化演算法,完全消除了此類冗餘,從而有效地減少了生成路的基片面積,提高了路的可測試性
  3. The article has analyzed the environment and features of project management for electric power generating equipment manufacturer, expounded the general rule of the project management for electric power generating manufacturing, and concluded the series practical experience of project management for electric power generating equipment manufacturing that project team is basic, project plan is the most important, project communication is key, project control is guarantee, and project profit is purpose, etc. a set of practical project management system has been finally established for completing the three purposes of project management of electric power generating equipment manufacturing

    通過對發設備製造企業的深入了解,分析了發設備製造項目管理的環境和特點,闡述了發設備製造項目管理的基本通則,得出了項目團是基礎、項目計劃是龍頭、項目溝通是關鍵、項目控制是保證、項目利潤是目的的一系設備製造項目管理的實踐經驗,為完成發設備製造項目管理的三大目標構建了一套實用的項目管理體系。
  4. Meanwhile, many problem was caused by using these technology and put forward corresponding handling method such as how to avoid congestion in mail queue because of sending document to thousands of people, how to distinguish which document is either mail message or document sent by office worker

    在運用上述技術實現具體功能的過程中遇到的問題:公群發引起的郵件阻塞、區分普通郵件消息和公消息提出了解決方法。另外,充分利用郵件系統自身的功能來完成子公流轉的某些特定功能:公到達后的自動回執確認。
分享友人